9204 search results for test

Ch11(Redline)(2006-3-3)

, and any additional materials placed. Do not 7 commence work activities that require testing until, the material sampling and testing frequencies in 27 accordance with the Department’s Sampling, Testing, and testing frequencies. 30 These quantities will not be considered payment quantities. Payment shall

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/finalest/p-and-d/allhistory/chap11/ch11(redline)(2006-3-3).pdf?sfvrsn=1a8c5e02_0

Ch11(Redline)(2011-11-1)

submittal, and any additional materials placed. Do not commence work activities that require testing, of construction, to be used to determine the material sampling and testing frequencies in the same format shown in the Department’s Sampling, Testing, and Reporting Guide . These quantities, be no reduction in inspection only sampling, testing and verification will be done at a minimum

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/finalest/p-and-d/allhistory/chap11/ch11(redline)(2011-11-1).pdf?sfvrsn=d0bccf57_0

GL-07B

 FY 2016/2017 QC Category No. 7B STATEWIDE INSPECTION GUIDELIST Asphalt Milling / Paving GENERAL PAVING 1. A pre-paving conference is held before the milling and paving operation and a written report is distributed. [CPAM 3.1] 2. A qualified CTQP Asphalt Paving Level 2 technician shall be on the roadway at all times when placing HMA at the job site (except when placing miscellaneous or temporary asphalt). All testing shall be performed by a CTQP Asphalt Paving Level 1 technician

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/construction/constadm/guidelist/inspectguidelist/fy1617/gl-07b.pdf?sfvrsn=8ff3b19c_0

CarpenterR

materials sampling and testing and maintenance of field books, assisting with final estimates

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/constadm/drb/resume/carpenterr.pdf?sfvrsn=ab1afbec_0
20 of 9204 results