1134 search results for curb ramp
TP-01-09-24BSN
, including ramps, feeder, and connector roads. NO BID CONFERENCE WILL BE HELD FOR THIS CONTRACT, roadway components, such as but not limited to concrete barrier wall, curb & gutter, ditch, grout pads, ; and the Sawgrass Expressway, MP 0.0 to 21.8, including ramps, feeder, and connector roads, - REHABILITATION, MISCELLANEOUS LB 100.000 0520- 2- 4 CONCRETE CURB, TYPE D LF 10.000 0561- 2
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/jan9/tp-01-09-24bsn.pdf?sfvrsn=b918481b_12024FDM913TypSect
including bridges (new or widened) (3) Toll Sites (4) Ramps and service roads for projects which, . (11) Indicate width of existing pavement and proposed pavement on widening projects. (12) Curb location and type (show Type E or F Curb, not the dimension). (13) Sidewalk location and width. (14, curbed roadway projects with Asphalt Base, Type B-12.5 only, indicate the asphalt curb pad on the typical section and include an Asphalt Base Curb Pad Detail. (6) For resurfacing projects on curbed
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm913typsect.pdf?sfvrsn=670013a9_144013615201-PLANS-05-LIGHTING
- 10 CONCRETE CURB & GUTTER, TYPE F LF 16.000 16.000 0520- 2- 4 CONCRETE CURB, TYPE D LF 8.000 8.000
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26105/44013615201-plans-05-lighting.pdf?sfvrsn=f056738b_1102-600
Superelevate When Smaller OF CURB 4' BEHIND FACE OF CURB 4' BEHIND FACE CURB & GUTTER ALL, area, impacted SPEED REDUCTION SIGNING TABLE 5 TABLE 6 NOTE: but not reconstructed, curb and gutter values may be used. For temporary conditions where existing curb has been removed Permits, highways with a posted speed of (feet) MULTILANE RAMPS TRAVEL LANES & (feet) SINGLE LANE RAMPS, (Typ.) Ø Bolt, Nuts 16 5 C l e a r H e i g h t Curb & Gutter Walkway Posts (Typ.) U
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/idx/102-600.pdf?sfvrsn=71aa04ce_1102-600
Superelevate When Smaller OF CURB 4' BEHIND FACE OF CURB 4' BEHIND FACE CURB & GUTTER ALL, area, impacted SPEED REDUCTION SIGNING TABLE 5 TABLE 6 NOTE: but not reconstructed, curb and gutter values may be used. For temporary conditions where existing curb has been removed Permits, highways with a posted speed of (feet) MULTILANE RAMPS TRAVEL LANES & (feet) SINGLE LANE RAMPS, .) Ø Bolt, Nuts 16 5 C l e a r H e i g h t Curb & Gutter Walkway Posts (Typ.) U
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/102-600.pdf?sfvrsn=5e00c8c6_2Chapter 5 - Special Operational Topics
-maintained sidewalks using curb ramps. FDOT will not approve golf cart crossings on a state road from, are not allowed to use crosswalks or sidewalk ramps to cross the mainline. • Place GOLF CART signs (W11, . Provide a minimum unobstructed sidewalk width of 8 feet; separation from the back of curb or edge, treatments, including refuge islands, curb extensions, street lighting, and raised crosswalks, also support, , curb extensions, raised crosswalks, and supplemental signing and pavement markings, may also
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/trafficservices/studies/tem/tem-2025/chapter-5---special-operational-topics.pdf?sfvrsn=8257af41_1102-600E
Superelevate When Smaller OF CURB 4' BEHIND FACE OF CURB 4' BEHIND FACE CURB & GUTTER ALL, area, impacted SPEED REDUCTION SIGNING TABLE 5 TABLE 6 NOTE: but not reconstructed, curb and gutter values may be used. For temporary conditions where existing curb has been removed Permits, highways with a posted speed of (feet) MULTILANE RAMPS TRAVEL LANES & (feet) SINGLE LANE RAMPS, t Curb & Gutter Walkway Posts (Typ.) U-Channel Steel ¡ Sign ¡ Sign 2'-0" Min. 2'-6" (± 6
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/102-600e.pdf?sfvrsn=cd473a3e_1102-600
610 820 1080 1390 1840 2400 3130 Radii is Used Superelevate When Smaller OF CURB 4' BEHIND FACE OF CURB 4' BEHIND FACE CURB & GUTTER ALL SPEEDS 10 10 14 14 18 24 30 18 60-70 55, 5 TABLE 6 NOTE: but not reconstructed, curb and gutter values may be used. For temporary conditions where existing curb has been removed Permits Office shall be notified immediately. When, ) MULTILANE RAMPS TRAVEL LANES & (feet) SINGLE LANE RAMPS AUXILIARY LANES & will automatically go back
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/idx/102-600.pdf?sfvrsn=b539f647_12026 TEM---Chapter 5 - Special Operational Topics
state-maintained sidewalks using curb ramps. FDOT will not approve golf cart crossings on a state road, are not allowed to use crosswalks or sidewalk ramps to cross the mainline. • Place GOLF CART signs, . Provide a minimum unobstructed sidewalk width of 8 feet; separation from the back of curb or edge, design treatments, including refuge islands, curb extensions, street lighting, and raised crosswalks, refuge islands, curb extensions, raised crosswalks, and supplemental signing and pavement markings
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/trafficservices/studies/tem/tem-2026/2026-tem---chapter-5---special-operational-topics.pdf?sfvrsn=29132323_2D6-11-20-25BSN
4,788.100 0425- 1-365 INLETS, CURB, TYPE P-6, PARTIAL EA 1.000 0425- 5- MANHOLE, ADJUST EA 6.000 0520- 1- 7 CONCRETE CURB & GUTTER, TYPE E LF 47.000 0520- 1- 10 CONCRETE CURB & GUTTER, TYPE F LF 1,152.000 0520- 2- 4 CONCRETE CURB, TYPE D LF 20.000 0520- 3- VALLEY GUTTER- CONCRETE LF 59.000 0520, 0339- 1- MISCELLANEOUS ASPHALT PAVEMENT TN 300.000 0425- 1-359 INLETS, CURB, TYPE P-5, MODIFY EA, CULVERT, OPTIONAL MATERIAL, ROUND, 18"SD LF 200.000 0520- 1- 10 CONCRETE CURB & GUTTER, TYPE F LF
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/lettings/2025/nov20/d6-11-20-25bsn.pdf?sfvrsn=46f35c6c_5450726 Technical Scope_Final_Rev
) 60 26.645 27.051 2°00’00” =42°53’49” (RT) 2864.79 0.055 0.055 7 Curb and Gutter/Concrete Separators: For budget purposes, the LRE does not contain any contingency budget for curb and gutter, . Mariana Avenue. For any damaged curb and gutter along the periphery of the grassed medians, purposes, the LRE does not contain any contingency budget for ramps to be replaced. If the engineer finds any of these ramps to not be ADA compliant, they will need to be constructed in accordance
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/25113/450726-technical-scope_final_rev.pdf?sfvrsn=877fd8bb_1Noise Practitioners Handbook_July 2025
a through lane(s), auxiliary lane(s), interchange lane(s)/ramp(s), weigh station(s), rest stop(s, the highest noise-generating conditions are represented. • For interchange ramps, peak hour demand volumes for the specific ramp shall be used, even if they are higher than the LOS C peak hour, peak, speed is unknown, then the design speed is to be used. The vehicle speed used for ramps will be the posted speed, applied along the entire ramp unless modified by the flow condition (e.g., the speed
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/noise-practitioners-handbook_july-2025.pdf?sfvrsn=8d6d7e0f_1Noise Practitioners Handbook_September 2025
lane(s)/ramp(s), weigh station(s), rest stop(s), ride-share lot(s) or toll plaza(s). For a complete, -generating conditions are represented. • For interchange ramps, peak hour demand volumes for the specific ramp shall be used, even if they are higher than the LOS C peak hour, peak direction volumes, , then the design speed is to be used. The vehicle speed used for ramps will be the posted speed, applied along the entire ramp unless modified by the flow condition (e.g., the speed along a loop
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/noise/noise-practitioners-handbook_september-2025.pdf?sfvrsn=81a11a24_1Historical Item Averages Market Area 10
, CURB, TYPE 9, 10' 0425 2 73 1 $5,600.00 $5,600.00 1.000 EA N MANHOLES, J-7, PARTIAL 0425 5 5, / BICYCLE RAILING, ALUMINUM ONLY,42" TYPE 1 0520 1 7 4 $58.09 $273,837.88 4,714.000 LF N CONCRETE CURB & GUTTER, TYPE E 0520 1 10 7 $45.43 $845,489.16 18,610.000 LF N CONCRETE CURB & GUTTER, TYPE F 0520 1 12 1 $71.00 $14,342.00 202.000 LF N CONCRETE CURB & GUTTER, TYPE F WITH SPECIAL GUTTER PROFILE 0520 2 1 1 $76.00 $17,176.00 226.000 LF N CONCRETE CURB, TYPE A 0520 2 2 4 $43.36 $322,359.04
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/market-area/pdf/historical-item-averages-market-area-10.pdf?sfvrsn=f5bd32ef_5TP-01-13-26BSN2
, and interchange improvements at US 27 (North) (MP 289) (reconstructed ramps to and from the north, , 24" SD EA 2.000 0519- 78- BOLLARDS EA 24.000 0520- 1- 7 CONCRETE CURB & GUTTER, TYPE E LF 137.000 0520- 1- 10 CONCRETE CURB & GUTTER, TYPE F LF 389.000 0520- 2- 4 CONCRETE CURB, TYPE D LF 7.000 0520- 2- 10 CONCRETE CURB, TOLL HEADER CURB LF 200.000 0520- 6- SHOULDER GUTTER- CONCRETE LF
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2026/jan13/tp-01-13-26bsn2.pdf?sfvrsn=986fd041_1D3-01-11-24BSN
overbuild, right turn lane and shoulder widening, radius widening, sidewalk and curb ramp construction, , curb and flume reconstruction, bridge joint repair for Bridge No. 600100, signing and pavement, PAVEMENT TN 168.800 0425- 1-201 INLETS, CURB, TYPE 9,
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2024/jan11/d3-01-11-24bsn.pdf?sfvrsn=ad8e057_1D3-01-18-24BSN
turn lane and shoulder widening, radius widening, sidewalk and curb ramp construction, guardrail, , including overbuild, radius widening, guardrail upgrades, mitered end section replacements, curb, 168.800 0425- 1-201 INLETS, CURB, TYPE 9,
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2024/jan18/d3-01-18-24bsn.pdf?sfvrsn=de3b077e_2E1X69BidTabs
, Pavement Markings, loop assemblies and Curb Ramp Replacement on State Road 600 (US 92 / US 17, 180.71000 2,788,174.59 0155 0520 1 10 CONCRETE CURB & GUTTER, TYPE F 207.000 LF 52.27000 10,819.89, 2,662,119.66 0155 0520 1 10 CONCRETE CURB & GUTTER, TYPE F 207.000 LF 78.59000 16,268.13 0160
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/bidtabs/2025/aug21/e1x69bidtabs.pdf?sfvrsn=c47161f8_120_Drainage_Redlines
of a driveway entrance, curb-cut ramp, or pedestrian crosswalk even if the hydraulic analysis places, . Florida Greenbook – 16th Edition Drainage | 20–10 Grate inlets and the depression of curb, openings and protective treatments. Table 3.3 Curb and Inlet Application Guidelines, Table 3.4 Ditch, : *The criteria in this column apply to travel, turn, or auxiliary lanes adjacent to barrier wall or curb
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/floridagreenbook/16th-edition/20_drainage_redlines.pdf?sfvrsn=6d57b5b6_720_Drainage_Rulemaking
streets. • Inlets should be placed on the upstream side of a driveway entrance, curb-cut ramp, Grate inlets and the depression of curb opening inlets should be located outside the through traffic, ) , Section 3.7 provides guidance on hydraulic openings and protective treatments. Table 3.3 Curb, , or auxiliary lanes adjacent to barrier wall or curb, in normal or super elevated sections. In addition
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/floridagreenbook/16th-edition/20_drainage_rulemaking.pdf?sfvrsn=417b68ec_1