1134 search results for curb ramp

E50F1BidTabs

this Contract consist of, but not limited to, signalization, concrete pavement, curb & gutter, sidewalks, ADA ramps, signing & pavement markings, lighting, and ITS at the intersection of SR 15, 1 10 CONCRETE CURB & GUTTER, TYPE F 161.000 LF 85.00000 13,685.00 100.00000 16,100.00 0100 0522

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/bid-tabs/2024/feb06/e50f1bidtabs.pdf?sfvrsn=66d2ea84_1

1600200int

, ramps, parking lots, concrete box culverts, retaining wall systems, shoulder-only areas, sidewalk, as separate LOTs. Curb pads and shoulders compacted separately shall be considered separate LOTs. Isolated, including any repairs, replacement, etc., of curb and gutter, sidewalk, etc., which might become necessary

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/review/fy2025-26/internal/1600200int.pdf?sfvrsn=53b6bade_1

2025FDM916DrainStruct

limits of pavement, curbs, traffic separators, sidewalks, curb ramps, and driveways. Show proposed, of pavement elevations for curb and gutter inlets. Include special grate treatment requirements

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm916drainstruct.pdf?sfvrsn=579e2484_3

1600000.impl

, turn lanes, ramps, parking lots, concrete box culverts, retaining wall systems, shoulder-only, “embankment” with “subgrade”. Isolated mixing operations will be considered as separate LOTs. Curb pads, the subsequent base or pavement is in place including any repairs, replacement, etc., of curb and gutter

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/implemented/1600000.impl.pdf?sfvrsn=1bd07da7_0

1600000.impl

, turn lanes, ramps, parking lots, concrete box culverts and retaining wall systems meeting, will be considered as separate LOTs. Curb pads and shoulders compacted separately shall be considered separate, , etc., of curb and gutter, sidewalk, etc., which might become necessary in order to recompact

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/implemented/1600000.impl.pdf?sfvrsn=49b4e10e_0

D3-09-24-25BSN

ramps along with concrete inspection lanes, constructing two buildings (Administration & Inspection), adding curb and gutter, barrier walls, sidewalk, drainage improvements, ITS, signing & pavement, STEEL- MISCELLANEOUS LB 316.000 0425- 1-311 INLETS, CURB, TYPE P-1,

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2025/sep24/d3-09-24-25bsn.pdf?sfvrsn=f4280fa4_1

District Two Letting & Project Information

, driveways, and sidewalk curb ramps E21W1-R0 Baker, Columbia, Hamilton,Suwannee, Union Large, and sweep sidewalks, Driveway’s, curb and gutters E21U4 Duval Furnish, install and establish highway

https://www.fdot.gov/contracts/district-offices/d2/lettings/dist-letting-project-info.shtm

Historical Item Averages Market Area 01

26.000 EA N INLETS, CURB, TYPE P-1, 10' 12/22/2025 Page: 7 Florida Department of Transportation Item, $780.00 $14,820.00 19.000 EA N BOLLARDS 0520 1 7 7 $39.87 $459,648.66 11,530.000 LF N CONCRETE CURB, Meas Obs? Description 0520 1 10 10 $45.59 $474,200.69 10,401.000 LF N CONCRETE CURB & GUTTER, TYPE F 0520 2 2 1 $170.00 $12,920.00 76.000 LF N CONCRETE CURB, TYPE B 0520 2 4 4 $51.20 $268,383.03 5,242.000 LF N CONCRETE CURB, TYPE D 0520 2 8 1 $39.80 $24,954.60 627.000 LF N CONCRETE CURB, TYPE RA

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/market-area/pdf/historical-item-averages-market-area-01.pdf?sfvrsn=d3643e0d_5

121202234924PM_Polk_Transportation_Projects_Application_2021

. These improvements include full intersection signalization, striping, signage, curb ramps, and pavement, is proposed without moving the curb and guttering system along the segment. The illustration below, the existing curbs and would introduce the new curb. Ms. Hurd had several drafts showing what

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25125/121202234924pm_polk_transportation_projects_application_2021.pdf?sfvrsn=ff81212c_1

TP-05-13-25BSN3

. These improvements consist of pavement reconstruction, guardrail, sidewalk, retaining wall and curb ramps, INLETS, CURB, TYPE P-1, 10' EA 1.000 0425- 1-341 INLETS, CURB, TYPE P-4, 10' EA 1.000 0425- 1-361 INLETS, CURB, TYPE P-6, 10' EA 1.000 0425- 2- 63 MANHOLES, P-8, PARTIAL EA 1.000 0425- 2- 91, - 10 CONCRETE CURB & GUTTER, TYPE F LF 2,963.000 0520- 3- VALLEY GUTTER- CONCRETE LF 211.000 0521, of Countyline Rd. bridge) to 100.0, and the Sawgrass Expressway (SR 869), MP 0.0 to 21.8, including ramps

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/may13/tp-05-13-25bsn3.pdf?sfvrsn=8e376fad_1

1600000.FHWA

. Construct mainline pavement lanes, turn lanes, ramps, parking lots, concrete box culverts, and retaining, as separate LOTs. Curb pads and shoulders compacted separately shall be considered separate LOTs, , replacement, etc., of curb and gutter, sidewalk, etc., which might become necessary in order, to the plane of the proposed finished surface. Construct mainline pavement lanes, turn lanes, ramps, parking, ”. Isolated mixing operations will be considered as separate LOTs. Curb pads and shoulders compacted

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/fhwa/1600000-fhwa.pdf?sfvrsn=a7957f11_2

CH 6_redline_2025-02

6-6 ▪ Example: A curb ramp is built with a cross slope that does not meet the design plans and is not ADA accessible. The costs related to constructing the deficient ramp and removing the deficient ramp are not eligible. • Upgrades. Goods, services, or deliverables that considered upgrades

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/lap/manual/review/fy-2024-25/ch-6_redline_2025-02.pdf?sfvrsn=301d7482_1

CHAPTER 6

Standards Financial Management Chapter 6-6 ▪ Example: A curb ramp is built with a cross slope, the deficient ramp and removing the deficient ramp are not eligible. • Upgrades. Goods, services

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/lap/manual/ch-6_final_2020-03-20-final.pdf?sfvrsn=b997aa3d_15

441700-1_Draft SCER_2025-03-25

use path along both sides of the road. Stormwater runoff is collected in curb and gutter and directed, six feet behind the curb and roadway lighting can be accommodated in this area. The total minimum, . It includes a 6-foot-wide sidewalk at the back of curb and an on-road 6- foot-wide bike lane along, path was reduced to 8 feet in width and is located adjacent to the curb through the constrained area, 2100 SW Cove Road Hosford Park & Boat Ramp SE Gaines Ave Dr. David L. Anderson Middle School 7000 SE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cove-road-study/441700-1_draft-scer_2025-03-25.pdf?sfvrsn=6d05b3b_1

Pt2Ch3_073124_clean

, aircraft parking areas, loading ramps, and safety areas, for use by aircraft regulated under 49 Code, , median, curb, sidewalk, roadside protection, drainage swales). 2. Roadway functional and context

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/pdeman/2024/pt2ch3_073124_clean.pdf?sfvrsn=83170cf0_1

Design Standards 2010 Interim

PUBLIC SIDEWALK CURB RAMPS – Dated 1/1/2011: All sheets, removed the 2' level landing requirement, 3; changed value of “h”. Sheet 4; revised reinforcement in Note 4. 211 1-3 of 5 211.pdf CURB, 01/01/10: Offset driveway tapers 1’ from back of curb. 400 1 & 17 of 26 400.pdf GUARDRAIL – Dated, for Transition Block to "Concrete Curb (Special), LF". "<view IDS> 410 7 of 25 410.pdf CONCRETE BARRIER, FACE RETROFIT) NARROW CURB – Dated 07/01/10: Changed * and ** notes. "<view IDS> 4 82 1 of 4

https://www.fdot.gov/roadway/ds/10/istds.shtm

D6 09-28-23BSN

Counties: MIAMI-DADE Road Name: SR 913 RAMP WB TO I-95 NB & TO US-1 870162 - 870163 Limits, advertisement Description: A contract consisting of Bridge Painting along SR 913 Ramp Westbound to I-95, , ADJUST EA 10.000 0515- 1- 1 PIPE HANDRAIL - GUIDERAIL, STEEL LF 200.000 0520- 1- 10 CONCRETE CURB & GUTTER, TYPE F LF 200.000 0520- 2- 4 CONCRETE CURB, TYPE D LF 100.000 0520- 5- 11 TRAFFIC

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/lettings/2023/sep28/d6-09-28-23bsn.pdf?sfvrsn=1c4b4114_1

2024ExhibitsPart2

Line Begin Lane Line 2" Misc. Asphalt Pavt. Begin Lane Line Stop Bar (If Required) Concrete Curb Concrete Curb (mph) Speed Entry (mph) Speed Design 45 35 85 75 155 35 25 75 145 25 15 95, E / E X I T R A M P AET-07S AET-02S STRUCTURE EQUIPMENT RAMP TOLL With Toll Equipment Structure Typical Entrance / Exit Ramp Signing M I N . 5 0 ' M I N I M U M 2 0

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024exhibitspart2.pdf?sfvrsn=b9313ce8_1

20230818_447917-1_SR 686_15030

: Y Curb & Gutter (Y/N): Y Outside: Other: SR 686 Cored By: Median Curbed (Y/N): 2.400 3, Lawn: Y Curb & Gutter (Y/N): Y Outside: Other: SR 686 Cored By: Median Curbed (Y/N): 2.400, was not recorded. 4. The cross slope is approximate and measured in the center of the lane. Lawn: Y Curb, of thickness for stabilization. 447917-1 CRACK Ramps: All Cores 2. Mile posts are approximate, slope is approximate and measured in the center of the lane. Lawn: Y Curb & Gutter (Y/N): Y Outside

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/coringdata/d7/15/20230818_447917-1_sr-686_15030.pdf?sfvrsn=c5483aef_1

8-Fall 2023 Construction Academy MOT Session

used to close sidewalks and curb ramps did not have detectable warnings. Index 102-660 requires pedestrian LCDs be placed across the full width of closed sidewalks and requires curb ramps to have

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2023-construction-academy/fall-2023/8-fall-2023-construction-academy-mot-session.pdf?sfvrsn=1d4f5d28_2
20 of 1134 results