9274 search results for test
BMRM Appendix A
certified welders should weld structural steel members. • Conduct any necessary non-destructive testing, , and/or using compressed air. • Steel shot blast and sandblast. • Apply test patches to verify, . • Test patches to verify ability of operator. • Remove deteriorated concrete using pneumatic hammers
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/maintenance/maintenance/str/bi/reference-manual/bmrm-appendix-a.pdf?sfvrsn=f588fe2c_0DISTRICTWIDE_TWP2027-2031 WPPH_BY ITEM_10-13-2025_SUBJECT TO CHANGE
$50,000 $50,000 $100,000 210995-1 - CONSULTANT PE-LAB TESTING MAT. LAB Type of Work: PRELIMINARY, $900,000 $1,050,000 210996-1 - CEI TESTING/MATERIAL OFFICE /CONSULTANTS Type of Work: INSPECT, $1,100,000 214256-5 - NPDES PROGRAM Type of Work: ENVIRONMENTAL TEST/MITIGATE Phase Funding Source
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/2025-wp-hearing-docs/projects-by-item/districtwide_twp2027-2031-wpph_by-item_10-13-2025_subject-to-change.pdf?sfvrsn=be612c78_1DISTRICTWIDE_TWP2027-2031 WPPH_BY DESCRIPTION_10-13-2025_SUBJECT TO CHANGE
Highways 210996-1 - CEI TESTING/MATERIAL OFFICE /CONSULTANTS Type of Work: INSPECT CONSTRUCTION, 410753-1 $400,000 $400,000 $400,000 $400,000 $600,000 210995-1 - CONSULTANT PE-LAB TESTING MAT. LAB, $510,000 $510,000 $510,000 214256-5 - NPDES PROGRAM Type of Work: ENVIRONMENTAL TEST/MITIGATE
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/2025-wp-hearing-docs/projects-by-description/districtwide_twp2027-2031-wpph_by-description_10-13-2025_subject-to-change.pdf?sfvrsn=e3307235_1536-001IntReviewPkg
the Test Level 2 (TL-2) Approach Terminal as specified in the plans. TL-3 3. APPROACH TERMINAL TEST LEVEL: Install either a Test Level 3 (TL-3) or herein if indicated in the plans. Guardrail
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/536-001intreviewpkg.pdf?sfvrsn=8d880a11_1536-001IndReviewPkg
the Test Level 2 (TL-2) Approach Terminal as specified in the plans. TL-3 3. APPROACH TERMINAL TEST LEVEL: Install either a Test Level 3 (TL-3) or herein if indicated in the plans. Guardrail
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/536-001indreviewpkg.pdf?sfvrsn=2e010de3_1536-001IndReviewPkg
the Test Level 2 (TL-2) Approach Terminal as specified in the plans. TL-3 3. APPROACH TERMINAL TEST LEVEL: Install either a Test Level 3 (TL-3) or herein if indicated in the plans. Guardrail
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/536-001indreviewpkg43b3cb23-559e-4928-809e-4d4a72388a17.pdf?sfvrsn=b73a0d59_1536-001FHWAReviewPkg
the Test Level 2 (TL-2) Approach Terminal as specified in the plans. TL-3 3. APPROACH TERMINAL TEST LEVEL: Install either a Test Level 3 (TL-3) or herein if indicated in the plans. Guardrail
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/536-001fhwareviewpkg.pdf?sfvrsn=be88410b_120251208_CTD_Business_Meeting_Package
for Community Transportation Coordinators (CTCs) and Non-Traditional Transportation Service Providers to test, to approximately 47 unique riders. Similar ISD project is currently being tested in Wakulla/Leon
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/meetingpackages/2025/20251208_ctd_business_meeting_package437346e6-052f-4545-a64f-a267dbd58b3b.pdf?sfvrsn=e1116af7_1Workbook_REDLINE_for_7-11_2-24-11
requested by districts PORTLAND CEMENT CONCRETE – ACCEPTANCE SAMPLING AND TESTING. (REV 6-25-10, , with test piles when authorized by the State Geotechnical Engineer. Do not use with SP4550512, concrete pile foundations, without test piles when authorized by the State Geotechnical
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2011/files/workbook_redline_for_7-11_2-24-11.pdf?sfvrsn=654bd729_0workbook
PORTLAND CEMENT CONCRETE – ACCEPTANCE SAMPLING AND TESTING. (REV 9-16-09) (FA 11-9-09) (7-10, , prestressed concrete pile foundations, with test piles STRUCTURES FOUNDATIONS - PILING. (REV, Bridge projects with square, prestressed concrete pile foundations, without test piles
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2010/files/workbook.pdf?sfvrsn=8b9800ac_0Workbook_REDLINE_12-2-10
by districts PORTLAND CEMENT CONCRETE – ACCEPTANCE SAMPLING AND TESTING. (REV 6-25-10) (FA 7-8-10, foundations, with test piles when authorized by the State Geotechnical Engineer. Do not use, , prestressed concrete pile foundations, without test piles when authorized by the State Geotechnical
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/workbook_redline_12-2-10.pdf?sfvrsn=cb3ed0dc_0Workbook_for_1-11_2-17-11
PORTLAND CEMENT CONCRETE – ACCEPTANCE SAMPLING AND TESTING. (REV 6-25-10) (FA 7-8-10) (1-11, . SP4550510A All Bridge projects with square, prestressed concrete pile foundations, with test piles, foundations, without test piles when authorized by the State Geotechnical Engineer. Do not use
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/workbook_for_1-11_2-17-11.pdf?sfvrsn=31d4aabd_02026-27-Update-Training
Facilities Specification 120: Excavation and Embankment • Clarified testing requirements, 536-001 –Guardrail • Updated SPI, Part A to explain “test level” (TL) options and compatibility, install Test Level 2 if specified in the Plans. They may substitute TL-3 for TL-2 if it’ll fit
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/training/2026-27-update-training.pdf?sfvrsn=b8fda28d_11020000.D01.FHWA
test reports showing that their product meets all test requirements set forth by NCHRP 350, . Manufacturersprovidingthesignsmust provide a certified test report to the Engineer indicating that the signs meet, e d e v i c e d e s c r i b e d h e r e i n must provide a certified test report to the Engineer, the Department certified test reports showing the TMA meets all requirements set by the National Cooperative, or chromium compounds. Manufacturers seeking product approval must furnish certified test reports
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul07/files/1020000.d01.fhwa.pdf?sfvrsn=8dc75674_01020000.origind
furnish certified test reports showing that their product meets all test requirements set forth, . OnlyusePortableRegulatorySignslistedontheQPL. Manufacturersprovidingthesignsmust provide a certified test report, i c e d e s c r i b e d h e r e i n must provide a certified test report to the Engineer, . Manufacturers seeking approval of their TMA must provide the Department certified test reports, . Manufacturers seeking product approval must furnish certified test reports showing the Work Zone Pavement
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul07/files/1020000.origind.pdf?sfvrsn=88745c0d_01020000FHWA
evaluation must furnish certified test reports showing that their product meets all test requirements, . OnlyusePortableRegulatorySignslistedontheQPL. Manufacturersprovidingthesignsmust provide a certified test report to the Engineer, d e v i c e d e s c r i b e d h e r e i n must provide a certified test report to the Engineer, . ManufacturersseekingapprovaloftheirTMAmustprovidetheDepartment certified test reports showing the TMA, lead or chromium compounds. Manufacturers seeking product approval must furnish certified test
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan06/files/1020000fhwa.pdf?sfvrsn=7aae00ee_01020000Orgin
must furnish certified test reports showing that their product meets all test requirements set forth, . Manufacturersprovidingthesignsmust provide a certified test report to the Engineer indicating that the signs meet, must provide a certified test report to the Engineer indicating the device meets, . ManufacturersseekingapprovaloftheirTMAmustprovidetheDepartment certified test reports showing the TMA meets all requirements set, seeking product approval must furnish certified test reports showing the Work Zone Pavement Marking
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan06/files/1020000orgin.pdf?sfvrsn=1c6a3765_0D2-06-11-25BSN
75.000 0455-137- LOAD TEST (DYNAMIC), DATA COLLECTION AND ANALYSIS EA 150.000 0455-137- 2 LOAD TEST (DYNAMIC), VERIFICATION TEST EA 25.000 0455-144- 20 TEST PILES - STEEL, 18" DIA PIPE LF 1,025.000, PILE POINT PROTECTION, 24" ROUND EA 12.000 0455-137- LOAD TEST (DYNAMIC), DATA COLLECTION AND ANALYSIS EA 8.000 0455-144- 22 TEST PILES - STEEL, 24" DIA PIPE LF 255.000 0458- 1- 11 BRIDGE DECK
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2025/jun11/d2-06-11-25bsn.pdf?sfvrsn=46bc506b_12023_CTD_Annual_Performance_Report-Electronic_Version
Development (ISD) Grant program to test new and innovative transportation service projects within, History Appropriated Awarded Expended Page 14 voluntarily test uploading the data in a more, for the CTD to test run the collection of disaggregated data on the trips, miles and bus passes, . The test run is expected to occur in 2024. The final report can be accessed at www.fdot.gov/ctd/ctd
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/studies-reports/2023_ctd_annual_performance_report-electronic_version2.pdf?sfvrsn=94e1d74a_3