9274 search results for test

BMRM Appendix A

certified welders should weld structural steel members. • Conduct any necessary non-destructive testing, , and/or using compressed air. • Steel shot blast and sandblast. • Apply test patches to verify, . • Test patches to verify ability of operator. • Remove deteriorated concrete using pneumatic hammers

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/maintenance/maintenance/str/bi/reference-manual/bmrm-appendix-a.pdf?sfvrsn=f588fe2c_0

DISTRICTWIDE_TWP2027-2031 WPPH_BY ITEM_10-13-2025_SUBJECT TO CHANGE

$50,000 $50,000 $100,000 210995-1 - CONSULTANT PE-LAB TESTING MAT. LAB Type of Work: PRELIMINARY, $900,000 $1,050,000 210996-1 - CEI TESTING/MATERIAL OFFICE /CONSULTANTS Type of Work: INSPECT, $1,100,000 214256-5 - NPDES PROGRAM Type of Work: ENVIRONMENTAL TEST/MITIGATE Phase Funding Source

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/2025-wp-hearing-docs/projects-by-item/districtwide_twp2027-2031-wpph_by-item_10-13-2025_subject-to-change.pdf?sfvrsn=be612c78_1

DISTRICTWIDE_TWP2027-2031 WPPH_BY DESCRIPTION_10-13-2025_SUBJECT TO CHANGE

Highways 210996-1 - CEI TESTING/MATERIAL OFFICE /CONSULTANTS Type of Work: INSPECT CONSTRUCTION, 410753-1 $400,000 $400,000 $400,000 $400,000 $600,000 210995-1 - CONSULTANT PE-LAB TESTING MAT. LAB, $510,000 $510,000 $510,000 214256-5 - NPDES PROGRAM Type of Work: ENVIRONMENTAL TEST/MITIGATE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/2025-wp-hearing-docs/projects-by-description/districtwide_twp2027-2031-wpph_by-description_10-13-2025_subject-to-change.pdf?sfvrsn=e3307235_1

536-001IntReviewPkg

the Test Level 2 (TL-2) Approach Terminal as specified in the plans. TL-3 3. APPROACH TERMINAL TEST LEVEL: Install either a Test Level 3 (TL-3) or herein if indicated in the plans. Guardrail

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/536-001intreviewpkg.pdf?sfvrsn=8d880a11_1

536-001IndReviewPkg

the Test Level 2 (TL-2) Approach Terminal as specified in the plans. TL-3 3. APPROACH TERMINAL TEST LEVEL: Install either a Test Level 3 (TL-3) or herein if indicated in the plans. Guardrail

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/536-001indreviewpkg.pdf?sfvrsn=2e010de3_1

536-001IndReviewPkg

the Test Level 2 (TL-2) Approach Terminal as specified in the plans. TL-3 3. APPROACH TERMINAL TEST LEVEL: Install either a Test Level 3 (TL-3) or herein if indicated in the plans. Guardrail

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/536-001indreviewpkg43b3cb23-559e-4928-809e-4d4a72388a17.pdf?sfvrsn=b73a0d59_1

536-001FHWAReviewPkg

the Test Level 2 (TL-2) Approach Terminal as specified in the plans. TL-3 3. APPROACH TERMINAL TEST LEVEL: Install either a Test Level 3 (TL-3) or herein if indicated in the plans. Guardrail

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/536-001fhwareviewpkg.pdf?sfvrsn=be88410b_1

20251208_CTD_Business_Meeting_Package

for Community Transportation Coordinators (CTCs) and Non-Traditional Transportation Service Providers to test, to approximately 47 unique riders. Similar ISD project is currently being tested in Wakulla/Leon

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/meetingpackages/2025/20251208_ctd_business_meeting_package437346e6-052f-4545-a64f-a267dbd58b3b.pdf?sfvrsn=e1116af7_1

Workbook_REDLINE_for_7-11_2-24-11

requested by districts PORTLAND CEMENT CONCRETE – ACCEPTANCE SAMPLING AND TESTING. (REV 6-25-10, , with test piles when authorized by the State Geotechnical Engineer. Do not use with SP4550512, concrete pile foundations, without test piles when authorized by the State Geotechnical

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2011/files/workbook_redline_for_7-11_2-24-11.pdf?sfvrsn=654bd729_0

workbook

PORTLAND CEMENT CONCRETE – ACCEPTANCE SAMPLING AND TESTING. (REV 9-16-09) (FA 11-9-09) (7-10, , prestressed concrete pile foundations, with test piles STRUCTURES FOUNDATIONS - PILING. (REV, Bridge projects with square, prestressed concrete pile foundations, without test piles

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2010/files/workbook.pdf?sfvrsn=8b9800ac_0

Workbook_REDLINE_12-2-10

by districts PORTLAND CEMENT CONCRETE – ACCEPTANCE SAMPLING AND TESTING. (REV 6-25-10) (FA 7-8-10, foundations, with test piles when authorized by the State Geotechnical Engineer. Do not use, , prestressed concrete pile foundations, without test piles when authorized by the State Geotechnical

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/workbook_redline_12-2-10.pdf?sfvrsn=cb3ed0dc_0

Workbook_for_1-11_2-17-11

PORTLAND CEMENT CONCRETE – ACCEPTANCE SAMPLING AND TESTING. (REV 6-25-10) (FA 7-8-10) (1-11, . SP4550510A All Bridge projects with square, prestressed concrete pile foundations, with test piles, foundations, without test piles when authorized by the State Geotechnical Engineer. Do not use

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/workbook_for_1-11_2-17-11.pdf?sfvrsn=31d4aabd_0

2026-27-Update-Training

Facilities Specification 120: Excavation and Embankment • Clarified testing requirements, 536-001 –Guardrail • Updated SPI, Part A to explain “test level” (TL) options and compatibility, install Test Level 2 if specified in the Plans. They may substitute TL-3 for TL-2 if it’ll fit

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/training/2026-27-update-training.pdf?sfvrsn=b8fda28d_1

1020000.D01.FHWA

test reports showing that their product meets all test requirements set forth by NCHRP 350, . Manufacturersprovidingthesignsmust provide a certified test report to the Engineer indicating that the signs meet, e d e v i c e d e s c r i b e d h e r e i n must provide a certified test report to the Engineer, the Department certified test reports showing the TMA meets all requirements set by the National Cooperative, or chromium compounds. Manufacturers seeking product approval must furnish certified test reports

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul07/files/1020000.d01.fhwa.pdf?sfvrsn=8dc75674_0

1020000.origind

furnish certified test reports showing that their product meets all test requirements set forth, . OnlyusePortableRegulatorySignslistedontheQPL. Manufacturersprovidingthesignsmust provide a certified test report, i c e d e s c r i b e d h e r e i n must provide a certified test report to the Engineer, . Manufacturers seeking approval of their TMA must provide the Department certified test reports, . Manufacturers seeking product approval must furnish certified test reports showing the Work Zone Pavement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul07/files/1020000.origind.pdf?sfvrsn=88745c0d_0

1020000FHWA

evaluation must furnish certified test reports showing that their product meets all test requirements, . OnlyusePortableRegulatorySignslistedontheQPL. Manufacturersprovidingthesignsmust provide a certified test report to the Engineer, d e v i c e d e s c r i b e d h e r e i n must provide a certified test report to the Engineer, . ManufacturersseekingapprovaloftheirTMAmustprovidetheDepartment certified test reports showing the TMA, lead or chromium compounds. Manufacturers seeking product approval must furnish certified test

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan06/files/1020000fhwa.pdf?sfvrsn=7aae00ee_0

1020000Orgin

must furnish certified test reports showing that their product meets all test requirements set forth, . Manufacturersprovidingthesignsmust provide a certified test report to the Engineer indicating that the signs meet, must provide a certified test report to the Engineer indicating the device meets, . ManufacturersseekingapprovaloftheirTMAmustprovidetheDepartment certified test reports showing the TMA meets all requirements set, seeking product approval must furnish certified test reports showing the Work Zone Pavement Marking

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan06/files/1020000orgin.pdf?sfvrsn=1c6a3765_0

D2-06-11-25BSN

75.000 0455-137- LOAD TEST (DYNAMIC), DATA COLLECTION AND ANALYSIS EA 150.000 0455-137- 2 LOAD TEST (DYNAMIC), VERIFICATION TEST EA 25.000 0455-144- 20 TEST PILES - STEEL, 18" DIA PIPE LF 1,025.000, PILE POINT PROTECTION, 24" ROUND EA 12.000 0455-137- LOAD TEST (DYNAMIC), DATA COLLECTION AND ANALYSIS EA 8.000 0455-144- 22 TEST PILES - STEEL, 24" DIA PIPE LF 255.000 0458- 1- 11 BRIDGE DECK

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2025/jun11/d2-06-11-25bsn.pdf?sfvrsn=46bc506b_1

2023_CTD_Annual_Performance_Report-Electronic_Version

Development (ISD) Grant program to test new and innovative transportation service projects within, History Appropriated Awarded Expended Page 14 voluntarily test uploading the data in a more, for the CTD to test run the collection of disaggregated data on the trips, miles and bus passes, . The test run is expected to occur in 2024. The final report can be accessed at www.fdot.gov/ctd/ctd

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/studies-reports/2023_ctd_annual_performance_report-electronic_version2.pdf?sfvrsn=94e1d74a_3
20 of 9274 results
Top