9204 search results for test
521-428
or greater in strength to other single slope railings which have been crash tested to MASH TL-5
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2019/idx/521-428.pdf?sfvrsn=48861d9_6521-426
to be equivalent or greater in strength to other single-slope railings which have been crash tested to MASH
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2020/idx/521-426.pdf?sfvrsn=9c7c0fdc_29970000-122impl
modules submitted must be tested and approved by the Department. Provide products constructed
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/implemented/9970000-122impl.pdf?sfvrsn=a6e4f79b_29970000-122origind
software. Any substitute software modules submitted must be tested and approved. Provide products
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/internal/9970000-122origind.pdf?sfvrsn=56bed450_2fe-guidelist 2025 CLEANrev
Straightedge Left in Place at Reduced Pay Resolution Testing Cost Incentive/Disincentive, Arbitration Orders Resolution Testing Costs Cash Retainage Withheld Substandard Item Court Orders Material, Schedule (JGS) to identify testing requirements/frequency for contract material certification, (See Summary of Adjustments) ☐ ☐ C.Develop the Job Guide Schedule to identify testing requirements, item backup and Summary of Quantities/EQR’s ☐ ☐ RAM 4 CPAM 5.13 D.Ensure test reports
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/constadm/guidelist/finalest/fe-guidelist-2025-cleanrev.docx?sfvrsn=23edfc42_3Historical Item Averages Market Area 12
LAGGING 0455137 5 $1,005.14 $1,010,166.00 1,005.000 EA N LOAD TEST (DYNAMIC), DATA COLLECTION AND ANALYSIS 0455137 2 6 $3,775.69 $445,532.00 118.000 EA N LOAD TEST (DYNAMIC), VERIFICATION TEST 0455143 3 3 $295.93 $1,071,251.40 3,620.000 LF N TEST PILES-PRESTRESSED CONCRETE,18" SQ 0455143 5 2 $312.28 $505,900.00 1,620.000 LF N TEST PILES-PRESTRESSED CONCRETE,24" SQ 0455144 6 1 $550.00 $1,496,000.00 2,720.000 LF N TEST PILES - STEEL, HP 14 x 89 0455144 8 1 $293.00 $118,665.00 405.000 LF N TEST
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/market-area/pdf/historical-item-averages-market-area-12.pdf?sfvrsn=39c752de_6PublicHearing_DISTRICTWIDE_Summary
MATERIALS CONSULTANT CONTRACT TESTING Type of Work: TECHNICAL ASSISTANCE Phase Funding Source 2026 2027, : ENVIRONMENTAL TEST/MITIGATE Phase Funding Source 2026 2027 2028 2029 2030 Preliminary Engineering State, $500,000 $500,000 241149-1 - DISTRICTWIDE ENVIRONMENTAL CONSULTANT Type of Work: ENVIRONMENTAL TEST, $9,227,164 449260-1 - CSC ENVIRONMENTAL MANAGEMENT OFFICE Type of Work: ENVIRONMENTAL TEST/MITIGATE, : ENVIRONMENTAL TEST/MITIGATE Phase Funding Source 2026 2027 2028 2029 2030 Bridge/Roadway/Contract
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_districtwide_summaryde6fb613-80d3-44f3-b716-9a8762c75fc4.pdf?sfvrsn=881b7702_2PublicHearing_DISTRICTWIDE_Summary_2027_2031
CONSULTANT CONTRACT TESTING Type of Work: TECHNICAL ASSISTANCE Phase Funding Source 2027 2028, CONTRACT Type of Work: ENVIRONMENTAL TEST/MITIGATE Phase Funding Source 2027 2028 2029 2030 2031, 241149-1 - DISTRICTWIDE ENVIRONMENTAL CONSULTANT Type of Work: ENVIRONMENTAL TEST/MITIGATE Phase Funding, - CSC ENVIRONMENTAL MANAGEMENT OFFICE Type of Work: ENVIRONMENTAL TEST/MITIGATE Phase Funding Source, 243844-1 - NPDES D-W D-5 DISTRICT-WIDE Type of Work: ENVIRONMENTAL TEST/MITIGATE Phase Funding Source
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_districtwide_summary_2027_2031.pdf?sfvrsn=b0c138c6_1E4Y17-R0ExhibitAScopeofServices
recognized testing laboratory, and the container must be marked as “UL Listed”. Beat/Sector, Requirements f) Topic No. 250-013-001-c, Drug-Free Workplace and Drug Testing g) Topic No. 250-055-001-e, 112.0455, F. S., prior to beginning RRSP operations. Additional testing shall be in accordance with DEPARTMENT Topic No. 250-013-001-c, Drug-Free Workplace and Drug Testing Policy, and at a minimum
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/rfp/e4y17/e4y17-r0exhibitascopeofservices.pdf?sfvrsn=17a62d2c_1ITB-DOT-1718-9064-SJ
(PUR 1001) General Contract Conditions (PUR 1000) Introduction Section 40) SAMPLES & TESTING, letter to be tested for compliance with the bid specifications. Failure to provide these samples within
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procurement/procurement/files_agency_term_contracts/itb-dot-1718-9064-sj.pdf?sfvrsn=ccd8f5d1_0ITB-DOT-1617-9023-GH
) Introduction Section 40) SAMPLES & TESTING Samples should not be sent in with the bid but shall, be sent to the address listed below to be tested for compliance with the bid specifications. Failure
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procurement/procurement/files_agency_term_contracts/itb-dot-1617-9023-gh.pdf?sfvrsn=240e570e_0DOT-ITB-19-9057R-SJ
& TESTING Samples should not be sent in with the bid but shall be submitted by the proposed awarded vendor, in notification letter to be tested for compliance with the bid specifications. Failure to provide these samples
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procurement/files_agency_term_contracts/dot-itb-19-9057r-sj.pdf?sfvrsn=b1bac2ca_29005 - Contract Document
& TESTING Samples should not be sent in with the bid but shall be submitted by the proposed awarded, to be tested for compliance with the bid specifications. Failure to provide these samples within
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procurement/files_agency_term_contracts/9005---contract-document.pdf?sfvrsn=b06bd381_1Agency Term Contract - Asphalt Tar Remover
& TESTING Samples should not be sent in with the bid but shall be submitted by the proposed awarded, to be tested for compliance with the bid specifications. Failure to provide these samples within
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procurement/files_agency_term_contracts/agency-term-contract---asphalt-tar-remover.pdf?sfvrsn=c310bbf1_12CR784 - Amendment 3 - Contract Document
) Introduction Section 40) SAMPLES & TESTING Samples should not be sent in with the bid but shall, be sent to the address listed in the notification letter to be tested for compliance with the bid
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procurement/files_agency_term_contracts/cr784---amendment-3---contract-document.pdf?sfvrsn=e2edd7b9_1Agency Term Contract - Grass Seeds
) Introduction Section 40) SAMPLES & TESTING Samples should not be sent in with the bid but shall, be sent to the address listed in the notification letter to be tested for compliance with the bid
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procurement/files_agency_term_contracts/agency-term-contract---grass-seeds.pdf?sfvrsn=ca51404f_8Travel Demand Modeling (TDM) Manual_Developing_Ch 3 - Preparing Model Data
sources. These data are used in an extensive adjustment process to match observed behavior and tested, designing the questionnaire, selecting a survey firm, pilot testing, and obtaining necessary
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/fto/transportation-forecasting-research-hub-documents/fdot-tdmm-documents/travel-demand-modeling-(tdm)-manual_developing_ch-3---preparing-model-data.pdf?sfvrsn=71f00ad1_1DRAFT - Developing a Travel Demand Model Chapter 3 Preparing Model Data
to match observed behavior and tested against information such as traffic counts and probe data to ensure, designing the questionnaire, selecting a survey firm, pilot testing, and obtaining necessary approvals
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/fto/transportation-forecasting-research-hub-documents/fdot-tdmm-documents/developing-a-travel-demand-model-chapter-3-preparing-model-data.pdf?sfvrsn=23815008_3