1087 search results for UNIT COST PER PAY ITEM
2021-2022 2nd Quarter SRES Report
over $120 per ton in 2022 amid crude oil price fluctuations and other input cost burdens, . Regression modeling was performed using pay item data, supply chain variables and other, FDOT’s HMA prices improved compared to the previous quarter, prices are still running over $120 per ton in 2022. Concrete pricing has eased since 2021, which posted prices over $900 per cubic yard, are increasingly passing on costs to FDOT. Monthly cost composition by material is provided
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/sres/quarterly/2021-2022-2nd-quarter-sres-report.pdf?sfvrsn=55831851_1E1W47Addendum001
fees, attorney and any expert fees, property cost, etc. The Department will have sole Request, in writing by the Department, the dates indicated below for submission of items or for other actions, 12/20/23 22 Proposal Evaluators submit Letter of Interest Scores to Contracting Unit 9:30 am local time 12/28/23 8 Contracting Unit provides Letter of Interest scores and Proposal Evaluators comments, to submit preliminary list of Risk Register Items and Alternative Technical Concepts prior to Risk
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1w47/e1w47addendum001.pdf?sfvrsn=e5c8b0b0_11100000.orig-2.ind
Pay Item changes? Yes No Estimates staff contacted (name): W i l l t h e p r o posed revision, No. 110- 4- Removal of Existing Rigid Concrete Pavement - per square yard. Item No. 110- 5, items will be removed under Section 110, other items of the Contract do not specify the removal thereof, including septic tanks, building, be designated in the Contract Documents as to be included in an item of payment for the work under
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/comments-responses/1100000.orig-2.ind.pdf?sfvrsn=20e6fe55_01100000.orig-2ind
Pay Item changes? Yes No Estimates staff contacted (name): W i l l t h e p r o posed revision, No. 110- 4- Removal of Existing Rigid Concrete Pavement - per square yard. Item No. 110- 5, items will be removed under Section 110, other items of the Contract do not specify the removal thereof, including septic tanks, building, be designated in the Contract Documents as to be included in an item of payment for the work under
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/january-2017/review/internal/1100000.orig-2ind.pdf?sfvrsn=c650d04a_03460100ind
materials testing. What financial impact does the change have; project costs, pay item structure, will represent the LOTs. The Department will pay for cost of the resolution testing. 2.When only the QC result, and will represent the LOTs. The Department will pay for the cost of the resolution testing. 3.When only, accurate and will represent the LOTs. The Department will assess a $1,000 pay reduction for the cost, are required and which test results are most accurate. The Department will pay for the cost of the resolution
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/3460100ind.pdf?sfvrsn=d5ff5d7d_1E1W47RFP
and any expert fees, property cost, etc. The Department will have sole Request for Proposal-Addendum, such Right of Way shall be at no cost to the Department, and all costs associated with securing and making, at the existing intersection of Fruitville Road and Lakewood Ranch Blvd. The following items are required, Uninterrupted Power Supply Unit CCTV with ethernet capability piggyback mounted to the cabinet CCTV IP, ” subpanel, per the TEM. Additionally, construct “PED XING” pavement messages 150 feet in advance
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1w47/e1w47rfp.pdf?sfvrsn=fd0af1fb_916140000 - MP 0.345 - Intersection Safety Study - FINAL_10-27-2020
.xlsm 10/16/2020 PAY ITEM # ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST 0101 1, 544_Updated.xlsm 10/16/2020 PAY ITEM # ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST 0700 1, .xlsm 10/16/2020 PAY ITEM # ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST 0650 2102 VEH SIGNAL, year. Service life: 20 years SR 544 at Derby Avenue Lighting Cost Calculation Sheet Pay Item No. Item Description Unit Quantity Unit Cost 0715 21 2 LIGHTING REPAIRS AND RETROFITS, LED RETROFIT KIT
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26106/16140000---mp-0-345---intersection-safety-study---final_10-27-2020.pdf?sfvrsn=9b4fb9bf_1D4-07-11-25BSN
and Approximate Quantities Call Order: 001 Proposal: E4X82 ALT Item Description Unit Quantity, -Insured Retention Call Order: 002 Proposal: E4X83 ALT Item Description Unit Quantity Section 0001, Quantities Call Order: 002 Proposal: E4X83 ALT Item Description Unit Quantity 0104- 18- INLET, ALT Item Description Unit Quantity 0711- 11-123 THERMOPLASTIC, STANDARD, WHITE, SOLID, 12, . Call Order: 003 Proposal: E4Y10 ALT Item Description Unit Quantity Section 0001 Signing 0101- 1
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2025/jul11/d4-07-11-25bsn.pdf?sfvrsn=ba9dd01c_13460203-723D01impl
will pay for cost of the resolution testing. 2.When only the QC result is within the established, . The Department will pay for the cost of the resolution testing. 3. When only the VT result is within, the LOTs. The Department will assess a $1,000 pay reduction for the cost of the Resolution Investigation, are most accurate. The Department will pay for the cost of the resolution testing. When the Engineer, (f′c) (psi) Maximum Water to Cementitious Materials Ratio (pounds per pounds) Target Slump Value
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/implemented/3460203-723d01impl.pdf?sfvrsn=74e90872_1E1W47Addendum003
utility work shall be broken out per utility type within the bid documentation (Water, Sewer, process. Department approval of an ATC proposal that is related to the items listed below, : In general, match the existing as per the Department Structures Manual. c. Critical Temporary, for items not addressed by Department Specifications, and shall not be used as a means of changing, , appraisal services, court fees, attorney and any expert fees, property cost, etc. The Department
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1w47/e1w47addendum003.pdf?sfvrsn=d5100908_16460000-722origind
Basis of Estimate/Pay Items Structures Design Guidelines Approved Product List Materials Manual, . The Contract unit price per each for aluminum pedestals and posts, furnished and installed, in this Section. Payment will be made under: Item No. 646- Aluminum Poles - per each., , with double nuts per ASTM F1554 Grade 55. For each bolt, provide two 3/4- inch ASTM A563 Grade A or higher, of this Specification at no cost to the Department. Such remedial work shall be performed within 180 days
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/6460000-722origind.pdf?sfvrsn=c07c6683_2SP4550100DTwoTP
this requirement, the Department will pay for this work as described in 455-5.9.3. If not otherwise provided, failure, test pile/shaft failure, or any other cause. Include in the bid the cost of transporting load, to the job site and back. Handle these items with care. The Contractor is responsible for the safe return of these items. After completion of the static load tests, return all Department furnished equipment, by the Department to the satisfaction of the Engineer. Clean all areas of rust on structural steel items
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2013/january-2013/workbook/sp4550100dtwotp.pdf?sfvrsn=280a30f5_0SP4550100DTwTP
this requirement, the Department will pay for this work as described in 455-5.9.3. If not otherwise provided, , test pile/shaft failure, or any other cause. Include in the bid the cost of transporting load, site and back. Handle these items with care. The Contractor is responsible for the safe return of these items. After completion of the static load tests, return all Department furnished equipment, by the Department to the satisfaction of the Engineer. Clean all areas of rust on structural steel items
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/workbook/sp4550100dtwtp.pdf?sfvrsn=92739f08_0D5-12-05-23BSN
the above requirements. Call Order: 001 Proposal: E50F3 ALT Item Description Unit Quantity, Time: 14 Days This is a Maintenance Pay Item Contract. Intent: The work under this Contract, requirements. Call Order: 002 Proposal: E53C0 ALT Item Description Unit Quantity Section 0001 PAVEMENT, Notice - Proposal Item Quantities Call Order: 002 Proposal: E53C0 ALT Item Description Unit Quantity, Quantities Call Order: 002 Proposal: E53C0 ALT Item Description Unit Quantity 0711- 15-102
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2023/dec05/d5-12-05-23bsn.pdf?sfvrsn=2579d0cb_16300204-723FHWA
box and a new pay item option has been added to address under pavement, open trench. Please, substituted: 630-4 Method of Measurement. The Contract unit price per foot of conduit, furnished, will be considered incidental to their related items of work. Payment for replacement of route markers, per, for new conduit installation. Payment will be made under: Item No. 630- 2- Conduit - per foot. Item No. 630- 3- Replace Route Marker for Existing Conduit - per each. 6300204D01 All Jobs
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/fhwa/6300204-723fhwa.pdf?sfvrsn=d10841e9_1E1W50Addendum002
of items or for other actions on the part of a Proposer shall constitute absolute deadlines for those, embankments. The new bridge shall consider wildlife connectivity per the draft 2023 Florida, of items or for other actions on the part of a Proposer shall constitute absolute deadlines, on the Project. During and after the meeting, it is the responsibility of the Project Manager/Contracting Unit, by the Contracting Unit or the Project Manager. E. Question and Answer The Design-Build Firm shall submit
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1w50/e1w50addendum002.pdf?sfvrsn=b0462ea3_1D3-04-10-25BSN
: 002 Proposal: E3Y09 ALT Item Description Unit Quantity 0334- 1- 52 SUPERPAVE ASPHALTIC CONCRETE, - Proposal Item Quantities Call Order: 002 Proposal: E3Y09 ALT Item Description Unit Quantity 0711, TO BID ON THIS CONTRACT Call Order: 003 Proposal: E3Y19 ALT Item Description Unit Quantity Section, Call Order: 003 Proposal: E3Y19 ALT Item Description Unit Quantity 0515- 1- 2 PIPE HANDRAIL, : 003 Proposal: E3Y19 ALT Item Description Unit Quantity 0711- 11-123 THERMOPLASTIC, STANDARD, WHITE
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2025/apr10/d3-04-10-25bsn.pdf?sfvrsn=b5091733_1D3-12-12-24BSN
: E3Y08 ALT Item Description Unit Quantity Section 0001 Landscape / Peripheral 0999- 2- LUMP SUM, ALT Item Description Unit Quantity Section 0001 Landscape / Peripheral 0999- 2- LUMP SUM, of pay items for each work order is listed in the Plans. EXPENDITURE OF AVAILABLE FUNDS The budgetary, Call Order: 003 Proposal: E3Y15 ALT Item Description Unit Quantity Section 0001 Roadway 0102- 3, Quantities Call Order: 003 Proposal: E3Y15 ALT Item Description Unit Quantity 0102- 74- 1
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2024/dec12/d3-12-12-24bsn.pdf?sfvrsn=8466601c_1E1W50Addendum003
embankments. The new bridge shall consider wildlife connectivity per the draft 2023 Florida Greenbook, on the sloped embankments. The new bridge shall consider wildlife connectivity per the draft 2023, otherwise notified in writing by the Department, the dates indicated below for submission of items, . During and after the meeting, it is the responsibility of the Project Manager/Contracting Unit, Unit or the Project Manager. E. Question and Answer The Design-Build Firm shall submit questions
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1w50/e1w50addendum003.pdf?sfvrsn=99177843_1D3-09-12-24BSN
Order: 001 Proposal: E3W03 ALT Item Description Unit Quantity Section 0001 Structures 0457- 1- 22, . Call Order: 003 Proposal: E3X99 ALT Item Description Unit Quantity Section 0001 Roadway 0101- 1, Quantities Call Order: 003 Proposal: E3X99 ALT Item Description Unit Quantity 0327- 70- 6 MILLING, Item Quantities Call Order: 003 Proposal: E3X99 ALT Item Description Unit Quantity 0706- 1- 3, drainage function. Mobilization and Maintenance of Traffic are incidental to the pay items listed
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2024/sep12/d3-09-12-24bsn.pdf?sfvrsn=f46943fa_1