1177 search results for Action Request Form

Section8.2V2-721cln

inspector must check cleanliness of the forms prior to each use. Check the form dimensions prior, of change(s), revise the QC Plan annually in the form of addenda or complete revision of the entire, Department Plant inspections. In the event that Department inspectors observe a product or action, -pour forms, reinforcing steel/fiber placement, concrete placement, curing, and post- placement, with the manufacturer’s instructions. Concrete Forms Provide concrete forms made of wood, metal, or other

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/materials-manual/section8-2v2-721cln.pdf?sfvrsn=a4b1391c_2

3550100.origind

 ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information ‐ incomplete forms will be returned) Contact the State Specifications Office for assistance in completing this form. Daniel Scheer 850‐414‐4130 daniel.scheer@dot.state.fl.us Debbie Toole 850‐414‐4114, for distresses and may require remedial action at any time. The Department may conduct a Pavement, to the Contractor for those conditions exceeding contract threshold values requiring remedial action

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/internal/3550100.origind.pdf?sfvrsn=e63946e8_0

TCAR_UpdatedGuidance_24may2024-2

and share data and software These groups may form into technical or advisory committees, the project financially infeasible. Physical constraints may come in the form of limited right of way, or request for proposals. Project sponsors should also consult the current state statutes, project development. A project champion is not a formal role and not all projects will have one,  Are competitive grants or formula  Are local, federal, or state  Are generated as a Public Private

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/transit/transit-planning-resources/tcar_updatedguidance_24may2024-2.pdf?sfvrsn=67a874a6_1

0020000SS

an application for qualification on forms furnished by the Department, giving detailed information, include with their bid proposal a copy of their Certification of Current Capacity (Form 375-020-22) and Status of Contracts On Hand (Form 375-020-21). 2-2 Proposals. 2-2.1 Obtaining Proposals: Obtain, Proposal file to be used by the Contractor to prepare the bid and print a proposal form, period prior to the letting, the request must be by Internet E-mail as specified in the Advertisement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2005/january-2005/workbook/0020000ss.pdf?sfvrsn=49d63d8c_0

0020000SS

an application for qualification on forms furnished by the Department, giving detailed information, include with their bid proposal a copy of their Certification of Current Capacity (Form 375-020-22) and Status of Contracts On Hand (Form 375-020-21). 2-2 Proposals. 2-2.1 Obtaining Proposals: Obtain, Proposal file to be used by the Contractor to prepare the bid and print a proposal form, prior to the letting, the request must be by Internet E-mail as specified in the Advertisement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2006/january-2006/workbook/0020000ss.pdf?sfvrsn=5dd0761d_0

MPOAC-Governing-Board-Meeting-Package-01-28-2021

for the Pledge of Allegiance. REQUESTED ACTION: None requested. ATTACHMENT: None. Item Number 2 Approval of Minutes: October 29, 2020 DISCUSSION: Review and comments from members. REQUESTED ACTION, action. FDOT assigned the task forces to study three specific corridors: The Suncoast Connector, is not adjusting their targets. No further action by MPOs Upcoming Activities:  November 02, compliance  FDOT must make evaluations available to FHWA upon request  February 27, 2021: MPOs set 2021

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2021/mpoac-governing-board-meeting-package-01-28-2021.pdf?sfvrsn=ca396dd9_1

2024FDM152ShopDrawings

for review and approval. For non-standard items, the Engineer (CEI) will typically request approval, hereinafter and • make distribution as described hereinafter. The original submittal forms, . When submittals require a Specialty Engineer, the original submittal forms Topic #625-000-002 FDOT, by the Reviewer must be indicated by one of the following designations: "APPROVED" (no further action, of the following designations: "APPROVED" (no further action required), "APPROVED AS NOTED" (make

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm152shopdrawings.pdf?sfvrsn=c22259df_1

2024FDM152ShopDrawings

(CEI) will typically request approval by the EOR regarding applicability. Material certification, as described hereinafter The original submittal forms the official Record Shop Drawing submittal, Engineer, the original submittal forms the official January 1, 2024 5 Topic #625-000-002 FDOT Design, action required), "APPROVED AS NOTED" (make corrections noted - no further submittal required, of the following designations: "APPROVED" (no further action required), "APPROVED AS NOTED" (make

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm152shopdrawings.pdf?sfvrsn=64803fb_2

2025FDM152ShopDrawings

Office for review and approval. For non-standard items, the Engineer (CEI) will typically request, , and • make distribution as described hereinafter. The original submittal forms the official Record, require a Specialty Engineer, the original submittal forms the official Topic #625-000-002 FDOT, : "APPROVED" (no further action required), "APPROVED AS NOTED" (make corrections noted - no further, must be indicated by one of the following designations: "APPROVED" (no further action required

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm152shopdrawings.pdf?sfvrsn=41ccee65_2

2025FDM152ShopDrawings

, the Engineer (CEI) will typically request approval by the EOR regarding applicability. Material, distribution as described hereinafter. The original submittal forms the official Record Shop Drawing, a Specialty Engineer, the original submittal forms the official January 1, 2025 5 Topic #625-000-002 FDOT, by one of the following designations: "APPROVED" (no further action required), "APPROVED AS NOTED, : "APPROVED" (no further action required), "APPROVED AS NOTED" (make corrections noted - no further

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm152shopdrawings.pdf?sfvrsn=be9eaa0a_1

OIT-Manual-Full

the request is responsible for maintaining the information within the necessary forms and documents, REQUESTS 2.1.1 All exception requests must be submitted through the information resource request, . FDOT 8 OIT Manual 3.3.6 Users requiring a Certified Digital Certificate must request, submit a request for removal via the identity access management system. 3.3.10 Digital certificates, Disciplinary Action Procedure, Topic No. 250-012-011, and the Disciplinary Standards contained in Rule

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/it/oitmanual/oit-manual-full.pdf?sfvrsn=64a7d686_2

CH 8_redline_2025-02

every three years or at the request of the Department or the FHWA (see Chapter 7.2.2). 8.2 TITLE, executes and provides an assurance in the form of the Title VI/Nondiscrimination Assurance per 49 CFR 21, Terms for Federal-Aid Professional Services Contracts (FDOT Form No. 375-040-84) and by reference in Form FHWA-1273, “Required Contract Provisions Federal-Aid Construction Contracts” revised July 5, 2022October 23, 2023 the latest version of the form is applicable. 8.4 IMPLEMENTATION PROCEDURES (23

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/lap/manual/review/fy-2024-25/ch-8_redline_2025-02.pdf?sfvrsn=c81766b_1

Software User's Manual_8.2

........................................................ 141 Figure 3-185 – GPIO DMS Message Action Configuration Dialog, – Operator Interaction Request, Figure 3-209 – Managed Lane Action Template Configuration Dialog..................................... 162 Figure 3-210 – Managed Lane Gate Action Template Configuration Dialog, ................... 163 Figure 3-212 – Managed Lane Action List Template Configuration Dialog

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/cmtp/sunguide/releases/8.2/software-user's-manual_8-2.pdf?sfvrsn=d1768ad3_1

Webinar 2 Traffic Forecasting 11.12.24

22 Project Traffic Forecasting Project Traffic Forecasting Request Data Collection and Processing, of Traffic Monitoring Sites  Continuous Traffic Monitoring Site (Continuous) (formerly TTMS)  Statewide, Monitoring Site (Short-term) (formerly PTMS)  Cover both state highways and local roads  Used, Structure (FSUTMS)  FSUTMS is a set of standardized computer programs, data formats, and operating procedures that form the basis for regional models in Florida.  FSUTMS standards have been evolving

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/systems/systems-management/training/access-management/sam-and-tsi-webinar-series/sam-and-tsi-2024-25/webinar-2-traffic-forecasting-11-12-24.pdf?sfvrsn=cef400a2_1

Software User's Manual_9.0

.................................................................................................. 18 Figure 30 – Schedule Action Menu, ........................................................... 142 Figure 196 – GPIO DMS Message Action Configuration Dialog, – Operator Interaction Request, Figure 227 – Managed Lane Action Template Configuration Dialog ........................................ 172 Figure 228 – Managed Lane Gate Action Template Configuration Dialog

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/cmtp/sunguide/releases/9.0/software-user's-manual_9-0.pdf?sfvrsn=f76b38c8_1

SunGuide and Lonestar Review

.....................................................................................................................49 5.13 Scheduled Action, ....................................... 50 Table 5.14 – Scheduled Action Features, ........................................................................................................................... Change Request CSD, that the best course of action would be to develop a tailored ATMS software for Florida. FDOT started, and formal vote in the change management board meeting. Past agendas and meeting minutes

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/cmtp/sunguide/whitepapers/sunguide-and-lonestar-review.pdf?sfvrsn=a68c2888_1

Section121V2-724cln

request. The producer’s training must be approved by the Department. 12.1.17 FORMS 12.1.17.1., but are strongly dependent upon the resin formulation. Therefore, test methods adapted to each material, in formulation. A representative of the Department may obtain verification samples at the Topic, the acceptable limits and the appropriate action to be taken when such limits are exceeded. For example, , including composite forming machines and test equipment H. LOT numbers for the materials and composites

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/materials-manual/section121v2-724cln.pdf?sfvrsn=b3a2ba07_1

SS0040309

the Department’s execution of a formal supplemental agreement implementing an approved Proposal, extension request, and the proposed change, and the comparative advantages and disadvantages. (2, a Proposal in the estimate. However, the Department reserves the right, where it deems such action, and all forms of intellectual property rights that either the Contractor or any officer, shareholder, by or for the Department) a royalty-free and perpetual license under all forms of intellectual

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/ss0040309.pdf?sfvrsn=bb4bee8f_0

SS0040301

. Pending the Department’s execution of a formal supplemental agreement implementing an approved, any time extension request, and the proposed change, and the comparative advantages, such action appropriate, to require the Contractor to pay the Department's cost of investigating, Interests: The Contractor’s Proposal submittal shall identify with specificity any and all forms, by or for the Department) a royalty-free and perpetual license under all forms of intellectual property rights

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2012/january-2012/workbook/ss0040301.pdf?sfvrsn=38d49179_0

D4550000.do

the soil surface on which concrete is to be placed or which will support the forming system, for excavations made below water for seals or when the footing or cap or forming system (including, for the level and to protect it against wave action interfering with level measurements. Provide

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2003/january-2003/workbook/d4550000.do629e031f95d84a48930db5c06e373b1d.pdf?sfvrsn=19a57107_0
20 of 1177 results