9274 search results for test

combinedpde-designscope-v-2022-02

the project and test the project components. The contract documents will be used by the DEPARTMENT or its, , DEPARTMENT or CONSULTANT or N/A.] [List types of borings and unique lab tests] 1.20 3D Modeling

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/project-management/scope/combinedpde-designscope-v-2022-02.docx?sfvrsn=5d82bc77_1

19-08-Zheng-EvolutionOfPavementTechnology

(2012-2014) NCAT Test Track Findings • Open-Graded Friction Courses are safer, but their long-term, Crack, Rut, Ride and Raveling o Forward Imaging o 25,000 lane miles tested per Year • Department

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2025-june/19-08-zheng-evolutionofpavementtechnology.pdf?sfvrsn=6da7a663_1

SPM7150000-724-i19433

during testing repaired circuits at no cost to the Department. 715-6.1.18 Poles : Replace pole caps, , materials, equipment, diagnostic services, and tests. No payment will be made until appropriate tests of the installation(s) have been completed. Payment will be made under the items specified

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/maintenance/finalized/spm7150000-724-i19433.pdf?sfvrsn=7654aa2f_1

SPM7150000-725-i19923

element, 600V 10 Amp, type FNQ or equivalent. Replace blown fuses caused during testing repaired, , equipment, diagnostic services, and tests. No payment will be made until appropriate tests

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/maintenance/finalized/spm7150000-725-i19923.pdf?sfvrsn=9a628e68_1

Procurement Guidance 2 2024 Final

Contracts over $2,000 CLEAN WATER >$150,000 >$150,000 >$150,000 >$150,000 >$150,000 BUS TESTING, Contracts over $2,000 DRUG AND ALCOHOL TESTING Transit operations Transit operations Transit, PROTECTIVE AGREEMENTS 49 U.S.C. § 5333; 29 CFR Part 215 DRUG AND ALCOHOL TESTING 49 U.S.C. § 5331

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/transit/procurement/procurement-guidance-2-2024-final_4dbe4e40-d6a4-4bfc-a9f5-32206a0c9d97.pdf?sfvrsn=c4a8364_1

6950000.FHWA

must be tested and approved. 695-2.2MarkingofApprovedEquipment: 695-2.2.1 M a n u f a c t u r e r ’ s, e m e n t s : P e r f o r m the manufacturer’s recommended on-site pre-installation test, sensors that pass the pre-installation test. Recordalltest results by lane on the warranty form provided, and replace any sensor that fails the test at no additional charge to the Department. 695-3.3 Non, andrepeatthevisualobservationtestuntilalllanescountcorrectly.Ifthesensorfailstoprovide accuratecounts after three test attempts, it must be replaced with a new unit

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/fhwa/6950000.fhwa.pdf?sfvrsn=9a863b0a_0

20160428_StaffDirMtgMinutesFinalApr2016

. A final report with results of the pilot test is expected to be completed by December 2016. For any, to test alternative revenue mechanisms to help sustain the long-term solvency of the Highway Trust, to test the design, implementation, and acceptance of user-based alternative revenue mechanisms, Task Force Working Group. Hillsborough MPO tested this tool, and Ms. Alden provided an overview, is currently compiling crash data, and by beta testing the tool. A prototype is expected by June 30

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2016/20160428_staffdirmtgminutesfinalapr2016.pdf?sfvrsn=67bb7803_1

460-470

. for the 1Ɓ" anchor bolts with 13" embedment; and 30,500 lbs. Section 416. The field testing proof, AND DOWELS: Adhesive Bonding Material Systems for Anchors APL). No proof testing is required. SCREW, ). design which has been successfully crash tested in accordance with NCHRP Report 350 TL-4 criteria

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/idx/460-470.pdf?sfvrsn=e7a8d8a4_1

Procurement Guidance 2025 Final_update_10132025

All All All All CLEAN WATER >$150,000 >$150,000 >$150,000 >$150,000 >$150,000 BUS TESTING All, EMPLOYEE PROTECTIVE AGREEMENTS 49 U.S.C. § 5333; 29 CFR Part 215 DRUG AND ALCOHOL TESTING 49 U.S.C

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/transit/procurement/procurement-guidance-2025-final_update_10132025.pdf?sfvrsn=d99c3565_1

7-14WorkbookFINAL

Use when requested by districts PORTLAND CEMENT CONCRETE – ACCEPTANCE SAMPLING AND TESTING, ) Changes to 455-1 through 455- 12. SP4550100DTwTP Projects with 100% Dynamic Testing of Pile Foundations WITH Test Piles. . STRUCTURES FOUNDATIONS. (REV 6-26-12) (7-14) Changes to 455-1 through 455- 12. SP4550100DTwoT P Projects with 100% Dynamic Testing of Pile Foundations WITHOUT Test Piles INTEGRAL PILE JACKETS. (REV 11-16-11) (FA 12-8-11) (7-14) Changes to: 457

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2014/files/7-14workbookfinal.pdf?sfvrsn=74dc2731_0

7-14WorkbookREDLINE

Use when requested by districts PORTLAND CEMENT CONCRETE – ACCEPTANCE SAMPLING AND TESTING, ) (1-147-14) Changes to 455-1 through 455- 12. SP4550100DTwTP Projects with 100% Dynamic Testing of Pile Foundations WITH Test Piles. . STRUCTURES FOUNDATIONS. (REV 6-26-12) (1-147-14) Changes to 455-1 through 455- 12. SP4550100DTwoT P Projects with 100% Dynamic Testing of Pile Foundations WITHOUT Test Piles INTEGRAL PILE JACKETS. (REV 11-16-11) (FA 12-8-11) (1-147-14) Changes

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2014/files/7-14workbookredline.pdf?sfvrsn=a3dbad90_0

0090103SLPQ.ind

for a deduction due to test results falling outside of the allowable specified tolerances. (3) To payment, mill tests and analysis reports to the Engineer. (g) The Contractor has furnished the Construction, under the bond. (e) The Contractor has furnished all required mill tests and analysis reports

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul10/files/0090103slpq.ind.pdf?sfvrsn=34136f4e_0

SS4520000

and repair in an approved manner. 452-6.9 Test Samples: Provide additional test samples and testing, . Provide the results of the compression testing of one or more test cylinders for controlling, the Specification requirements on casting, curing and testing of concrete test cylinders, for form removal as specified on the plans, in this Section, or as approved by the Engineer. Test, and assembly. Make test cylinders, in accordance with Section 346, cured in the same manner

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2012/files/ss4520000.pdf?sfvrsn=aeb00279_0

SS4520000

and repair in an approved manner. 452-6.9 Test Samples: Provide additional test samples and testing, . Provide the results of the compression testing of one or more test cylinders for controlling, the Specification requirements on casting, curing and testing of concrete test cylinders. No direct, for form removal as specified on the plans, in this Section, or as approved by the Engineer. Test, and assembly. Make test cylinders, in accordance with Section 346, cured in the same manner

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2011/files/ss4520000.pdf?sfvrsn=23fa0f1b_0

4520000IMP

the Engineer of any damage which occurs and repair in an approved manner. 452-56.9 Test Samples: Provide additional test samples and testing for compressive strength on precast segments and field closure, and testing of concrete test cylinders. No direct payment will be made for the concrete testing. All costs, , or as approved by the Engineer. 9 Test cylinders, made and cured in the same manner as the segment, at various stages of their manufacture and assembly. Make test cylinders, in accordance with Section

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul03/files/4520000imp.pdf?sfvrsn=3d32e4ba_0

SS4520000

and repair in an approved manner. 452-6.9 Test Samples: Provide additional test samples and testing, . Provide the results of the compression testing of one or more test cylinders for controlling, the Specification requirements on casting, curing and testing of concrete test cylinders, for form removal as specified on the plans, in this Section, or as approved by the Engineer. Test, and assembly. Make test cylinders, in accordance with Section 346, cured in the same manner

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2012/january-2012/workbook/ss4520000.pdf?sfvrsn=2c649539_0

20250708_451236-1_SR 35_14050

/ 700 Name:4 to 6 Lane Urban Principal Arterial Roadway NONE PAVED Beg MP: To: From: TEST LAB, Roadway NONE PAVED Beg MP: To: From: TEST LAB, INC Coring Completion Date: SR 35 / SR 700 / US 98, PAVED Beg MP: To: From: TEST LAB, INC Coring Completion Date: SR 35 / SR 700 / US 98 / US 301, : To: From: TEST LAB, INC Coring Completion Date: SR 35 / SR 700 / US 98 / US 301 Cored, Roadway NONE PAVED Beg MP: To: From: TEST LAB, INC Coring Completion Date: SR 35 / SR 700 / US 98

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/coringdata/d7/14/20250708_451236-1_sr-35_14050.pdf?sfvrsn=d1a5460c_1
20 of 9274 results
Top