2222 search results for bridge inspection

D4 Public Hearing Report 2027 - Districtwide

441310-3 - CONTINUING SERVICES FOR BRIDGE INSPECTION OF STATE BRIDGES (SOUTH) Type of Work, $500,425 Total for Project 441310-3 $500,425 441310-4 - CONTINUING SERVICES FOR BRIDGE INSPECTION, $78,502 449481-1 - DISTRICT 4 LOCAL GOVERNMENT BRIDGE INSPECTION SERVICES - OFF SYSTEM Type, - DISTRICT 4 LOCAL GOVERNMENT BRIDGE INSPECTION SERVICES Type of Work: BRIDGE OPERATIONS Phase Fund, $500,000 $500,000 451286-1 - DISTRICT 4 LOCAL GOVERNMENT BRIDGE INSPECTION SERVICES - ON SYSTEM Type

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d4_documents/d4-public-hearing-report-2027---districtwide.pdf?sfvrsn=37cee76d_3

ConsoliF

Manager from April 16,2001 to January 1, 2002. Primary duties include the supervision of inspection, duties included marketing of Construction Engineering and Inspection services to the Central Florida area. Performed project inspection of land development at Mt. Dora Country Club and Eastpointe subdivision. Inspection involved all areas of land development including bond issuance, permit, , change orders, asphalt paving and concrete inspection. Additional duties also included review

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/constadm/drb/resume/consolif.pdf?sfvrsn=4035457_5

SS5600000

Control Plan has been approved by the Engineer. 560-5.3 Inspection: Ensure that all inspection, inspector meeting the requirements of this Section. Maintain daily inspection reports at the job site for review by the Engineer. Provide all daily inspection reports upon completion of the project, to the Engineer that all personnel performing quality control inspections are certified at a minimum, Bridge Coating Inspector and that they report directly to a Quality Control Supervisor who

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2010/january-2010/workbook/ss5600000.pdf?sfvrsn=a64b7a0_0

SS5600000

specific Coating Quality Control Plan has been approved by the Engineer. 560-5.3 Inspection: Ensure that all inspection equipment is maintained in accordance with the manufacturer’s instructions, by a quality control coatings inspector meeting the requirements of this Section. Maintain daily inspection reports at the job site for review by the Engineer. Provide all daily inspection reports upon, : Provide documentation to the Engineer that all personnel performing quality control inspections

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/ss5600000.pdf?sfvrsn=36c9357f_0

Estimates Bulletin 15-03

Bridge Culvert Perform inspection and settlement monitoring during sheet pile installation 3 624, 34.1 General Protection of Existing Structures includes inspection and monitoring for vibration, . 34.3 Inspection and Settlement Monitoring A registered Geotechnical Engineer and Structural, Structures Evaluate the need for inspection and settlement monitoring of existing structures located, Proposed Miscellaneous Structures Evaluate the need for inspection and settlement monitoring

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/bulletins/fpc/2015/estimates-bulletin-15-03.pdf?sfvrsn=54085aae_1

4580000.impl

)isdeletedandthefollowingsubstituted: SECTION458 BRIDGEDECKJOINTS 458-1Description. Furnishandinstall bridge deck, applicable joint system supplied. For format and required details, follow the AASHTO/NSBA Steel Bridge, Fabrication: Furnish continuous heavy duty bridge deck elastomeric seals sized in accordance, to achieve required lengths. (c)Perform all shop welding in accordance with the Bridge Welding Code, edition of AASHTO LRFD Bridge Design Specifications or as required by the Contract Documents. Supply

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/implemented/4580000.impl.pdf?sfvrsn=5a9b2afa_0

FMPP January 2024 Meeting Summary_final

tractor-trailer maps. How do bridge inspections play in?  These relate to trucks that can cross, District 2 efforts to use cameras, automated inspections, and sampling to determine accurate projections, measuring?  The condition of the bridge deck area (FHWA)  Number of bridges (not miles, FDOT, at inspection reports and makes recommendations on how to handle needed repair or replacement. o FDOT collects condition data on decks, superstructures, and substructures using bridge inspectors and drones

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/policy/metrosupport/fmpp/2024_1-january/fmpp-january-2024-meeting-summary_final.pdf?sfvrsn=217f6424_1

PublicHearing_FLAGLER COUNTY_Summary

5/US 1 OVER PELLICER CREEK BRIDGE REPLACEMENT Type of Work: BRIDGE REPLACEMENT Phase Funding Source, 447865-1 - I-95 FLAGER WEIGH STATION - INSPECTION BARN UPGRADES Type of Work: MCCO WEIGH STATION, : ROUTINE MAINTENANCE Phase Funding Source 2026 2027 2028 2029 2030 Bridge/Roadway/Contract, AGREEMENTS Type of Work: LIGHTING Phase Funding Source 2026 2027 2028 2029 2030 Bridge/Roadway, 2027 2028 2029 2030 Bridge/Roadway/Contract Maintenance State $175,000 Total for Project 414979-1

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_flagler-county_summaryfae58c14-503c-4d0a-8e4a-c28d4cd487b1.pdf?sfvrsn=a86d6be5_2

Section113V2-724

) sStructural sSteel bridge Fabrication Pprojects. 11.3.2 AUTHORITY Section 20.23(3, for Personnel Qualification and Certification in Nondestructive Testing AASTHO/AWS D1.5 Bridge Welding, in bridge componentsProjects. These requirements and activities pertain to the procedure equipment/ instrumentation, personnel requirements, calibration, equipment verification, inspection technique, , and inspection process. Provide this information to the Department for review and approval for initial use

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/materials-manual/redline/section113v2-724.pdf?sfvrsn=8618b58c_1

1. TSMCA Full April 2023 PDF

Specifications fo r Road and Bridge Construction. 3. If Traffic Signals and Devices are damaged, (periodic inspection, service, and routine repairs), restoration of services, and emergency maintenance, damage inspection report forms completed and submitted to the Department within twelve (12) weeks, to conduct a structural inspection of the mast arm structures every sixty (60) months. The inspection, conform to the current Department Standard Specifications for Road and Bridge Construction

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/1-tsmca-full-april-2023-pdf.pdf?sfvrsn=4ab12023_1

E1X59-R0

Inspection, Cleaning, Repair and Ditch Pavement Repairs Limits: Midpoint Project(s): 43272927214(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000 Miles, the full advertisement Description: The work under this Contract consists of Pipe Inspection, Cleaning, E432- 4- STORM SEWER INSPECTION (VIDEO CAMERA) LF 5,530.000 E570- 5- FERTILIZER TN 1.000 E570- 9- 1

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2025/jan16/e1x59-r0.pdf?sfvrsn=c5e7c270_1

Section93V2-725

Operations, Part 637 – Construction Inspection and Approval, Subpart B – Quality Assurance, Standard Specifications for Road and Bridge Construction. American Concrete Institute (ACI), Farmington, frequency for the Department’s Plant inspections from the District Materials and Research Engineer, : Concrete Production Facilities Guide 9-3-3 X ̅ = mean. (3) Previous Plant inspections, correction, criteria, the Department may reduce the Plant inspection frequency. If approved by the DMRE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/review/material-manual/section93v2-725.pdf?sfvrsn=420ddf86_1

Section93V2cln

, Part 637 – Construction Inspection and Approval, Subpart B – Quality Assurance Procedures, Specifications for Road and Bridge Construction. American Concrete Institute (ACI), Farmington Hills, Michigan, ’s Plant inspections from the District Materials and Research Engineer (DMRE). The reduced, X ̅ = mean. (3) Previous Plant inspections, correction of any deficiencies noted, failing samples, the Plant inspection frequency. If approved by the DMRE, the inspection frequency will be reduced

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/materials-manual/section93v2cln.pdf?sfvrsn=8a6a6ab8_2

SectionMM93V2

637 – Construction Inspection and Approval, Subpart B – Quality Assurance Procedures, , D.C. Florida Department of Transportation Standard Specifications for Road and Bridge Construction, months. The Plant may request a reduced scheduling frequency for the Department’s Plant inspections, ) Previous Plant inspections, correction of any deficiencies noted, failing samples attributed, of this information. Upon meeting all above criteria, the Department may reduce the Plant inspection

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/materials-manual/sectionmm93v2.pdf?sfvrsn=2122f41_4

Section93V2-724cln

Operations, Part 637 – Construction Inspection and Approval, Subpart B – Quality Assurance Procedures, Specifications for Road and Bridge Construction. American Concrete Institute (ACI), Farmington Hills, for the Department’s Plant inspections from the District Materials and Research Engineer (DMRE). The reduced, Guide 9-3-3 X ̅ = mean. (3) Previous Plant inspections, correction of any deficiencies noted, failing, reduce the Plant inspection frequency. If approved by the DMRE, the inspection frequency

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/materials-manual/section93v2-724cln.pdf?sfvrsn=e39c8fb7_1

Section93V2-725cln

– Construction Inspection and Approval, Subpart B – Quality Assurance Procedures for Construction American, and Bridge Construction. American Concrete Institute (ACI), Farmington Hills, Michigan. Reports, request a reduced scheduling frequency for the Department’s Plant inspections from the District, : Concrete Production Facilities Guide 9-3-3 X ̅ = mean. (3) Previous Plant inspections, correction of any, criteria, the Department may reduce the Plant inspection frequency. If approved by the DMRE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/materials-manual/section93v2-725cln.pdf?sfvrsn=e61bb836_1

Section93V2-725redln

Operations, Part 637 – Construction Inspection and Approval, Subpart B – Quality Assurance, Standard Specifications for Road and Bridge Construction. American Concrete Institute (ACI), Farmington, frequency for the Department’s Plant inspections from the District Materials and Research Engineer, : Concrete Production Facilities Guide 9-3-3 X ̅ = mean. (3) Previous Plant inspections, correction, criteria, the Department may reduce the Plant inspection frequency. If approved by the DMRE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/materials-manual/redline/section93v2-725redln.pdf?sfvrsn=b1b1e021_1

Section93V2redln

Operations, Part 637 – Construction Inspection and Approval, Subpart B – Quality Assurance Procedures, Specifications for Road and Bridge Construction. American Concrete Institute (ACI), Farmington Hills, a reduced scheduling frequency for the Department’s Plant inspections from the District Materials, : Concrete Production Facilities Guide 9-3-3 Table 4.1). X ̅ = mean. (3) Previous Plant inspections, meeting all above criteria, the Department may reduce the Plant inspection frequency. If approved

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/materials-manual/redline/section93v2redln.pdf?sfvrsn=7669e4c4_1

Section93V2

637 – Construction Inspection and Approval, Subpart B – Quality Assurance Procedures, , D.C. Florida Department of Transportation Standard Specifications for Road and Bridge Construction, months. The Plant may request a reduced scheduling frequency for the Department’s Plant inspections, ) Previous Plant inspections, correction of any deficiencies noted, failing samples attributed, of this information. Upon meeting all above criteria, the Department may reduce the Plant inspection

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/materials-manual/redline/section93v2.pdf?sfvrsn=9d06f86e_1

CTQM Ch 4

for the manufacture, testing, placement, and inspection of concrete material on Florida Department of Transportation, for the quality of the concrete being placed on major bridge projects. These responsibilities, bridge structure must have this qualification. The ACI Concrete Transportation Construction Inspector, , will be required on complex bridge jobs. 4.3.6 Concrete Laboratory Technician – Level 1, as the individual who is responsible for precast prestressed concrete inspections

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/ctqm/new_files/ctqm-ch-4.docx?sfvrsn=793d517d_5
20 of 2222 results