9204 search results for test

Dev331BPM (9-20-21)

testing from a previous project showing the product demonstrates the following at the end of a one-year test: no rutting greater than 1/4 inch, no visible cracking, friction aggregate remaining

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/special-case/developmental/dev331bpm-(9-20-21).pdf?sfvrsn=c0af9b90_1

CM-660-02 Inductive Loop Detection System

TS-2. FORMDROPDOWN Provide the following: A third party test report that demonstrates compliance with this requirement. A completed Testing Laboratory and Report Checklist. A completed NEMA

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/traf_sys/compliance-matrices-2022/cm-660-02-inductive-loop-detection-system.docx?sfvrsn=a234d736_1

20240717_CTD_Business_Meeting_Presentation

to test the feasibility of collecting more disaggregated (detailed) data on trips, miles and bus passes, in testing the submission of their disaggregated data. THF submitted its second report in June 2024

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/meetingpackages/2024meetings/20240717_ctd_business_meeting_presentation.pdf?sfvrsn=98acc098_1

FDOT's Wrong-Way Driving (WWD) Program

of various countermeasures and test those countermeasures. Additional research conducted, Countermeasures for Mitigating Wrong-Way Entries onto Limited Access Facilities Testing and Evaluation

https://www.fdot.gov/traffic/teo-divisions.shtm/cmt/Wrong-Way-driving

D5SR44PrestressImpactSupplier

. Manufacturers seeking evaluation of their post-tensioning systems must submit test results to the Structures Design Office and include certified test reports from an independent laboratory audited, a letter to FDOT SS Larry Sessions, P.E., with their second submittal including the “outstanding tests, -Stress tells Steve that Dura-Stress must do the air test on the PT ducts. Dura-Stress indicates to FDOT Steve Voll they cannot pressure test corrugated metal duct as it will not hold air. Call to FDOT SS

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/construction/constadm/drb/decisions/d5/d5sr44prestressimpactsupplier.pdf?sfvrsn=10a30ac7_0

dcta 41003

the training contact information for the TQDBS. A proficiency walkthrough for ACI Concrete Field Testing, Strength Testing Technician or the two Concrete Laboratory Grade 1 and Grade 2 courses later, approve the course. The Field Testing Grade 1 materials from ACI will be used. Carl Bradshaw and Aubrey Graves will be the primary instructors for the Field Testing course. Currently it is a three day, in projectors and test them before sending them to the conference. Need to have some healthy choices

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/construction/publications/meetingminutes/trainingmeetings/2002to2004/dcta-41003.pdf?sfvrsn=db330334_0

BMRM Chapter 18

and severity of corrosion The following table lists some common test methods and standards used, Maintenance Course Series Reference Manual 18-15 Table 18.1 Test Methods and Their Uses Test Method Significance and Use ASTM D610, Standard Test Methods for Evaluating Degree of Rusting, D6677 Standard test method for evaluating adhesion by knife Knife cut and probe adhesion test. Does, . ASTM D3359 Standard test methods for measuring adhesion by tape test Knife cut test to evaluate

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/maintenance/maintenance/str/bi/reference-manual/bmrm-chapter-18.pdf?sfvrsn=b7d650c8_0

BMRM Chapter 18

and severity of corrosion The following table lists some common test methods and standards used, Maintenance Course Series Reference Manual 18-15 Table 18.1 Test Methods and Their Uses Test Method Significance and Use ASTM D610, Standard Test Methods for Evaluating Degree of Rusting, D6677 Standard test method for evaluating adhesion by knife Knife cut and probe adhesion test. Does, . ASTM D3359 Standard test methods for measuring adhesion by tape test Knife cut test to evaluate

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/maintenance/str/bi/reference-manual/bmrm-chapter-1847a8b332370e4a1285304698ed317d32.pdf?sfvrsn=36a6f912_0

0050104.impl

Department Shop Drawing Review Office. Provide copies of material certifications and material tests, of Record. Provide copies of material certifications and material tests to the Resident Engineer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul12/files/0050104.impl.pdf?sfvrsn=9c9f7589_0

4000200.fhwa

(of the Supplemental Specifications) is deleted. 400-15.2.6.6 Material Tests and Certification: Before, to the same formula as that previously subjected to the tests specified in Section 975. In addition

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan10/files/4000200.fhwaec4f8044117b42b9886c93ad04eeae1f.pdf?sfvrsn=5b338e48_0

4000200.FHWA

(of the Supplemental Specifications) is deleted. 400-15.2.6.6 Material Tests and Certification: Before, to the same formula as that previously subjected to the tests specified in Section 975. In addition

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan10/files/4000200.fhwa.pdf?sfvrsn=ae13de14_0

SS5800000PBcomm&resp

possible stress of the plant material, health, etc., require where the tests would have, with some degree of measurement (tenths, hundredths, etc), location the soil moisture tests were taken

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/maintenance/comments-responses/ss5800000pbcomm-resp.pdf?sfvrsn=ffbb6c54_2

0090801.FHWA

required mill tests and analysis reports to the Engineer. 7.TheContractorhasfurnishedthe Construction, provisions. 6.TheContractor has furnished all required mill tests and analysis reports to the Engineer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/fhwa/0090801.fhwa.pdf?sfvrsn=5ae64036_0

4550510.FHWA

by the Engineer, dynamic load tests will be useding toat least 6 hammer blows will determine whether, by the Engineer, dynamic load tests using at least 6 hammer blows will determine whether the pile bearing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/fhwa/4550510.fhwa.pdf?sfvrsn=9a36bafb_0

6800000.FHWA

, and shock tests described in National Electrical Manufacturers Association TS2, 2.2.7, 2.2.8, and 2.2.9., subjected to the transients, temperature, voltage, humidity, vibration, and shock tests described

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/fhwa/6800000.fhwa.pdf?sfvrsn=26d602e0_0

0090801.FHWA

pertaining to any wage-rate provisions. (f) The Contractor has furnished all required mill tests, to any wage-rate provisions. (f) The Contractor has furnished all required mill tests and analysis

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/fhwa/0090801.fhwa.pdf?sfvrsn=c1ca4e2c_0

Design Build Boilderplate7-21

ASME American Society of Mechanical Engineers ASTM American Society for Testing and Materials, , designates a specification, test method, or other code or recommendation of the particular authority or organization shown. Use standards, specifications, test methods, or other codes as specified, by the Contractor. Laboratory. The official testing laboratory used by the Department. Low Bid Design, in the construction of the work, together with samples that may be subjected to the tests provided

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/design-build/design-build-boilderplate7-21.pdf?sfvrsn=c9a57b1d_2

Design Build Boilerplate

ASME American Society of Mechanical Engineers ASTM American Society for Testing and Materials AWG, designation, or combination of numbers and letters, designates a specification, test method, or other, , specifications, test methods, or other codes as specified in the current edition at the time of the bid, of the materials furnished and of the work performed by the Contractor. Laboratory. The official testing, in the construction of the work, together with samples that may be subjected to the tests provided

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/design-build/db-boilerplate-7-20.docx?sfvrsn=3bca4656_2

Design Build BoilerPlate FY 2023-24 REV 6-20-23

Society of Mechanical Engineers ASTM American Society for Testing and Materials AWG American Wire, a specification, test method, or other code or recommendation of the particular authority or organization shown. Use standards, specifications, test methods, or other codes as specified in the current edition, . Laboratory. The official testing laboratory used by the Department. Low Bid Design Build. A Design/Build, of the work, together with samples that may be subjected to the tests provided

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/design-build/design-build-boilerplate-fy-2023-24-rev-6-20-23.pdf?sfvrsn=26450382_3
20 of 9204 results