9204 search results for test

3520800-723impl

 352 GRINDING CONCRETE PAVEMENT. (REV 8-30-22) (FA 10-11-22) (FY 2023-24) ARTICLE 352-8 is deleted and the following substituted: 352-8 Basis of Payment. Price and payment will be full compensation for all work and materials specified in this Section, including furnishing all labor, materials, tools, equipment, testing, and incidentals and for doing all work involved in grinding existing or new concrete pavement, removing residue, and cleaning the pavement, including necessary disposal

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/implemented/3520800-723impl.pdf?sfvrsn=de62aa65_2

3390700-722resp

 3390700 MISCELLANEOUS ASPHALT PAVEMENT COMMENTS FROM INTERNAL/INDUSTRY REVIEW Deborah Ihsan (954) 777-4387 deborah.ihsan@dot.state.fl.us Comments: (1-18-22, Industry) why are we allowing Misc asphalt to receive a quality bonus, when this asphalt type is typically used as a secondary item to guardrail and any type of mix can be utilized except FC-5, does not require asphalt plant testing, and density Response: They are not receiving a quality bonus. It is payment for the quantity

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/comments-responses/3390700-722resp.pdf?sfvrsn=73ee1b08_2

0060401-122FHWA

at a minimum: 1. Description of the defective materials. 2. Supporting information, testing or inspection, testing laboratories, qualified in accordance with Section 105- 7. Upon approval of the Engineering, of the defective materials. 2. Supporting information, testing or inspection reports with nonconformities, of Record who will perform the engineering analysis. 5. Proposed testing laboratories, qualified

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/fhwa/0060401-122fhwa.pdf?sfvrsn=6e3e3d51_2

0060400.FHWA

information, testing or inspection reports with nonconformities, pictures, drawings, and accurately, the engineering analysis. 5. Proposed testing laboratories, qualified in accordance with Section 105- 7. Upon, of the defective materials. 2. Supporting information, testing or inspection reports, of Record who will perform the engineering analysis. 5. Proposed testing laboratories, qualified

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/fhwa/0060400.fhwa.pdf?sfvrsn=4e9d0744_0

1050808.impl

 105 CONTRACTOR QUALITY CONTROL GENERAL REQUIREMENTS. (REV 11-29-16) (FA 11-29-16) (7-17) SUBARTICLE 105-8.8 is deleted and the following substituted: 105-8.8 Prestressed Concrete Plant Quality Control Personnel: Ensure each prestressed concrete plant has an onsite production manager, an onsite plant quality control manager, a plant engineer, and adequate onsite QC inspectors/technicians to provide complete QC inspections and testing. Ensure the plant manager for QC has at least five

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/implemented/1050808.impl.pdf?sfvrsn=73a50e6a_0
20 of 9204 results