9037 search results for test

5700000ORGIN

to biodegradable erosion control blankets (ECBs). Provide documentation of manufacturer’s testing, or turbidity tests show the need for an additional application. The work and materials for reapplication, performance testing, manufacturer’s certification of training and material samples to the Engineer, by the Engineer. 570-3.7 Fertilizing: Based on a soil test performed in accordance with Section 162, spread, testing laboratory. Refer to Section 982 for fertilizer rate calculations. For bid purposes, base

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan07/files/5700000orgin.pdf?sfvrsn=681d8c81_0

CADDManual

7.6 SOFTWARE TESTING, applications, procedures, testing, training, and implementation. Engineering Data - Those digital files, the Department’s CADD software is developed, tested, approved and distributed. Chapter 8 Quality

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cadd/downloads/archived-documentations/caddmanual.pdf?sfvrsn=3af4f2a0_2

CADDManual-387877557

7.6 SOFTWARE TESTING, applications, procedures, testing, training, and implementation. Engineering Data - Those digital files, the Department’s CADD software is developed, tested, approved and distributed. Chapter 8 Quality

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cadd/downloads/archived-documentations/caddmanual-387877557.pdf?sfvrsn=ffafdfa8_2

CM-102-06 Truck Mounted Changeable Message Sign

the environmental requirements of NEMA TS- 4 FORMDROPDOWN Provide the following: A third party test report that demonstrates compliance with this requirement. A completed Testing Laboratory and Report, testing procedures. R. Brooks J. Morgan J. Morgan 09/18/2018 No 5.0 Updated to reflect the latest FA approval date of 10-31-19. Updated NEMA testing procedures. W. Geitz M. DeWitt J. Morgan D

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/traf_sys/compliance-matrices-2022/cm-102-06-truck-mounted-changeable-message-sign.docx?sfvrsn=9e86bea3_1

SunGuide-CSE-3.0.0

as the database requires a significant computing platform and testing has demonstrated that the use, of this testing, the following configuration is recommended if SunGuide is to be used as a PTMC (note, to 400 loop (or acoustic) detectors being monitored. • Incident Management: Load testing was performed on a test server and the CPU impact of handling of concurrent incidents was evaluated

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/cmtp/sunguide/documents/training/operator/sunguide-cse-3-0-0.pdf?sfvrsn=bb3243d2_1

SunGuide-CSE-3.0.0

as the database requires a significant computing platform and testing has demonstrated that the use, of this testing, the following configuration is recommended if SunGuide is to be used as a PTMC (note, to 400 loop (or acoustic) detectors being monitored. • Incident Management: Load testing was performed on a test server and the CPU impact of handling of concurrent incidents was evaluated

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/cmtp/sunguide/documents/training/deployment/sunguide-cse-3-0-0.pdf?sfvrsn=97d87b_1

4300000.D01.FHWA

testing of the pipe. If directed by the Engineer, test pipe using a mandrel. The mandrel shall, as the means of further testing, the mandrel’s diameter, length, and other requirements shall conform, for the type of pipe installed, at no cost to the Department. Should the deflection test prove that the pipe met specifications, the Department will bear the cost of the deflection testing, than the allowed percent deflection of the certified actual mean diameter of the pipe being tested

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul08/files/4300000.d01.fhwa.pdf?sfvrsn=82ee4ae8_0

4300000FHWA

further testing of the pipe. If directed by the Engineer, test pipe using a mandrel. The mandrel shall, as the means of further testing, the mandrel’s diameter, length, and other requirements shall conform, requirements for the type of pipe installed, at no cost to the Department. Should the deflection test prove that the pipe met specifications, the Department will bear the cost of the deflection testing, tested. The mandrel shall be fabricated of metal, fitted with pulling rings at each end, stamped

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan07/files/4300000fhwa.pdf?sfvrsn=c73020dc_0

4300000.d01.fhwa

testing of the pipe. If directed by the Engineer, test pipe using a mandrel. The mandrel shall, as the means of further testing, the mandrel’s diameter, length, and other requirements shall conform, for the type of pipe installed, at no cost to the Department. Should the deflection test prove that the pipe met specifications, the Department will bear the cost of the deflection testing, than the allowed percent deflection of the certified actual mean diameter of the pipe being tested

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul08/files/4300000.d01.fhwa73ce53de16514898a7d2af8cc2de4b98.pdf?sfvrsn=282c3c82_0

FINAL_Workbook_7-12_7-16-12

Projects with 100% Dynamic Testing of Pile Foundations WITH Test Piles. Issued as Mandatory No. 3 to the 7-12WB. The Special Provisions for 100% Dynamic Testing provide a means for the Department, 455-12 SP4550100DTwoT P Projects with 100% Dynamic Testing of Pile Foundations WITHOUT Test, requested by districts PORTLAND CEMENT CONCRETE – ACCEPTANCE SAMPLING AND TESTING. (REV 6-25-10) (FA, to seal the jackets, and extend the re- testing time for the fiberglass forms. It also expands

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2012/files/final_workbook_7-12_7-16-12.pdf?sfvrsn=6c66dc9a_0

FINAL_Workbook_7-12-REDLINE_7-16-12

% Dynamic Testing of Pile Foundations WITH Test Piles. Issued as Mandatory No. 3 to the 7-12WB. The Special Provisions for 100% Dynamic Testing provide a means for the Department to accept, SP4550100DTwoTP Projects with 100% Dynamic Testing of Pile Foundations WITHOUT Test Piles Issued, PORTLAND CEMENT CONCRETE – ACCEPTANCE SAMPLING AND TESTING. (REV 6-25-10) (FA 7-8-10) (1-11, , and extend the re- testing time for the fiberglass forms. It also expands on minor construction

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2012/files/final_workbook_7-12-redline_7-16-12.pdf?sfvrsn=74a7b86d_0

DCE17-09

): 6-1.3.3 urn u Project General Requirements: Material is accepted by material sampling and testing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/construction/memos/2009/dce17-09.pdf?sfvrsn=c1874d_0
20 of 9037 results