1087 search results for UNIT COST PER PAY ITEM

449655-1_Final_Technical_Safety_Scope

Total $429,302.95 SHOULDER COMPONENT User Input Data Description Value X-Items Pay item, $29.37 $3,524.40 Shoulder Component Total $81,098.31 DRAINAGE COMPONENT X-Items Pay item, . Structural Scope Items:  Per the FDM 261.7, an ancillary structures report shall be provided, - Miscellaneous Construction Net Length: 0.100 MI 528 LF Description: Safety ROADWAY COMPONENT X-Items Pay item Description Quantity Unit Unit Price Extended Amount 110-1-1 CLEARING & GRUBBING 0.25 AC

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26106/449655-1_final_technical_safety_scope.pdf?sfvrsn=a73f3abf_1

3340000.FHWA

, for the certified Superpave asphalt concrete pay item. Submit this certification to the Engineer no later than, by Certification and the tons produced for each asphalt pay item. 334-8 Basis of Payment. 334-8.1, by the bid price per ton. 334-8.4 Payment: Payment will be made under: Item No. 334- 1- Superpave, more than three mix designs per nominal maximum aggregate size per traffic level per binder grade per year, where the year starts at the Notice to Proceed. Exceeding this limitation will result

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/fhwa/3340000.fhwa.pdf?sfvrsn=a1af6039_0

Staff-Directors-Final-Packet-01-27-22-final

:14pm Item Number 3 Public Comments (non-agenda items) DISCUSSION: Recommendations or comments, . Approval of Minutes: October 28, 2021 Meeting 3. Public Comments (non-agenda items) 4. Executive, . Federal Highway Administration C. Federal Transit Administration 6. Business Items & Presentations, to mark.reichert@dot.state.fl.us. Item Number 1 Call to Order & Pledge of Allegiance DISCUSSION: The Chair, of Allegiance. REQUESTED ACTION: None requested. ATTACHMENT: None. Item Number 2 Approval of Minutes

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2022/staff-directors-final-packet-01-27-22-final.pdf?sfvrsn=5a393a38_1

Program Management Bulletin 22-03

items are to be included in the Final As-Built Plans. Pay item quantities shall be updated on the Summary of Pay Items in the appropriate Pay Item Summary Box as detailed in CPAM Section 5.13. (5, with conventional pay items from MAC based on the pay items on the contract and project specific, , and the applicable Pay Item Number(s). Certifications attesting to this must be submitted to the PA prior, use on the project before it is placed. d) Pay Reduction per Specifications – The Specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/bulletins/fpo/2022/program-management-bulletin-22-03.pdf?sfvrsn=875641be_1

BABA Bulletin- 12-5-2022 (FHWA Approved)

groups of pay items are to be included in the Final As-Built Plans. Pay item quantities shall be updated on the Summary of Pay Items in the appropriate Pay Item Summary Box as detailed in CPAM, . The JGS is generated for contracts with conventional pay items from MAC based on the pay items, the Federal Aid Project Number, the Financial Project Number, and the applicable Pay Item Number(s, on the project before it is placed. d) Pay Reduction per Specifications – The Specifications allow

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/resources/bulletins/2022/baba-bulletin--12-5-2022-(fhwa-approved).pdf?sfvrsn=cbcfe3c9_1

E6P36ScopeOfServices

3.27. Annual Cap on High-Cost Projects, This is a lump sum contract. Invoice the Department on a monthly basis in accordance with the item(s, , the Contractor’s Engineer of Record may be a Department approved Specialty Engineer. For items, per day. Clearly identify the primary responder and escalation levels should the primary not respond, or the event requires additional Contractor resources to respond per contract terms. 1.5

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/asset-main/e6p36/e6p36scopeofservices.pdf?sfvrsn=9d089462_1

Transit Transformation_8.31.20

that all purchases of vehicles, equipment or any other manufactured item be of U.S.- made, portable electronic device such as a tablet that allows transit riders to pay for and access public, in the progression from isolated agency-by-agency information and operations to a one-call/ one-click/one-pay, utilize smartphone applications and web- based platforms to allow users to book and pay for prearranged, application to access and pay for docked or dockless micromobility options or request a ride

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/transit/transit-planning-resources/transit-transformation_8-31-20_d47d22da-5048-451e-8055-ec348db13050.pdf?sfvrsn=4d5debda_2

6840100-724origind

FDOT Design Manual ConstructionProject Administration Manual Basis of Estimate/Pay Items, . A software-based DVD provided individually must be paid under the pay item below. 684-7 Basis of Payment, Ethernet connectivity at transmission rates of 100 megabits per second from the remote ITS device, a minimum of two optical 100 Base FX ports capable of transmitting data at 100 megabits per second, at transmission rates of both one and ten gigabits per second to and from adjacent MHES within the traffic

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/internal/6840100-724origind.pdf?sfvrsn=18edf1f2_1

3340000.origind

, for the certified Superpave asphalt concrete pay item. Submit this certification to the Engineer no later, represented by Certification and the tons produced for each asphalt pay item. 334-8 Basis of Payment, . The pay adjustment will be computed by multiplying a CPF for the LOT by the bid price per ton. Perform, , -1.20%of G (1) mm . No additional compensation, cost or time, shall be made. 334-8.2.3.1 Pay, )] The pay adjustment shall be computed by multiplying the CPF for the LOT by the bid price per

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/internal/3340000.origind.pdf?sfvrsn=cfa1037f_0

6300204-723origind

Basis of Estimate/Pay Items Structures Design Guidelines Approved Product List Materials Manual, . The Contract unit price per foot of conduit, furnished and installed, will include furnishing all hardware, will be made under: Item No. 630- 2- Conduit - per foot. Item No. 630- 2- Conduit, Under Pavement, Open Trench - per foot. Item No. 630- 3- Replace Route Marker for Existing Conduit - per each., a complete installation. When earth backfill and tamping is required, place backfill material as per

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/internal/6300204-723origind.pdf?sfvrsn=19003810_1

SCO BP RFP (Stand D-B) CLEAN version 2025-01b 8-11-25

: If there are any items that are not used/not applicable, delete it and renumber the Table of Contents, to developer of RFP: Typically, the PER, CSER, SHPO Concurrence, and USFWS Concurrence should be included, that the Design-Build Firm is responsible for all additional cost and time related to the acquisition, to consultant acquisition, appraisal services, court fees, attorney and any expert fees, property cost, etc, of Way shall be at no cost to the Department, and all costs associated with securing and making

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/designbuild/dbdocuments/rfpdocs/sco-bp-rfp-(stand-d-b)-clean-version-2025-01a-dated-5-9-2025.docx?sfvrsn=12a6f48b_2

44787815201 - DESIGN DOCUMENTATION

Summary of Pay Items 6/19/2025 2:29:01 PM 0002 SUMMARY OF SIGNING S ALT Item Number Description UNIT, Trnsport Proposal Summary of Pay Items 6/19/2025 2:29:01 PM 0003 SUMMARY OF LIGHTING S ALT Item, Proposal Summary of Pay Items 6/19/2025 2:29:01 PM 0004 SUMMARY OF SIGNALIZATION S ALT Item Number, include: A. Key Sheet B. General Notes/Pay Item Notes C. Plan Sheets (1” = 40’) D. Guide Sign Work, . General Notes/Pay Item Notes D. Signalization Plan Sheets (1” = 40’) E. Guide Sign Work Sheet F. Mast

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26111/44787815201---design-documentation.pdf?sfvrsn=4344aa37_1

1-BABA Implementation Plan- Construction Academy, May 2024

.) Aggregates and Binders (exempt: Wet Concrete, A sphalt) Te mporary Items (BABA exempt, APL listed per, % of the total cost of all components” •FHWA waiver may by applicable Per FDOT specifications, 6-5.2.2, and training Sample Login Contract/Project Pay Item Method of A c c eptance APL# Date, requirements See MAC instructions for pay items with multiple A P L#s Construction Engineer/CEI, Source items: •Current: MSP to change from “use any APL…” to “use the following APL item…” •Pending

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2024-spring-construction-academy/1-baba-implementation-plan--construction-academy-may-2024.pdf?sfvrsn=ceb4fb36_1

D6_ 2022 Truck Parking Supply & Demand Study

averages over $4,600 annually per driver.”18 According to the Transportation Research Board’s National, and logistics industry which requires cost-effective and just-in-time deliveries to feed e-commerce, chain would be the most feasible in Miami cost-wise instead of a publicly owned truck parking, . To meet this demand 1,177 acres of property would be needed under the assumption of 10 vehicles per

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/rail/publications/d6/d6_-2022-truck-parking-supply-demand-study.pdf?sfvrsn=61630210_1

6650000-722FHWA

their respective pay item numbers. 665-6 Basis of Payment. Price and payment will be full compensation for all, : The housing must be a two piece unit consisting of a base housing and a removable cover. The housing must, controller cabinet must allow the use of up to 16 pushbuttons (4 maximum per channel) with a single, Beaconing features. The Wait message must only annunciate once per actuation. 665-2.2.1.2 Pushbutton, Control Unit (CCU): The accessible pedestrian pushbutton detector may include a CCU for interfacing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/fhwa/6650000-722fhwa.pdf?sfvrsn=aa34f2e9_2

4550502.FHWA3

under Pay Item No. 455-34. No payment will be made for dynamic load tests on test piles, with dynamic load tests in the pay items for test piles. 455-12.5.2 Dynamic Load Tests/ Production, splices under Pay Item No. 455-34. No payment will be made for dynamic load tests on test piles, associated with dynamic load tests in the pay items for test piles. 455-12.5.2 Dynamic Load Tests, driving equipment which provides the required resistance at a blow count ranging from 3 blows per inch

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/fhwa/4550502.fhwa3.pdf?sfvrsn=c6427efa_0

CRANE BLVD ROADWAY PLANS 451637-1-38-01

, AND THE DISTRICT'S LANDSCAPE ARCHITECT A UNIT COST BREAKDOWN FOR EVERY ITEM OF WORK INCLUDED, TEMPORARY FENCE, CONCRETE BARRIER WALL OR APPROVED HANDRAIL. COST SHALL PAY ITEM 102-7, MAINTENANCE, AND GRUBBING", PAY ITEM 110-1- 3. ALL PUBLIC LAND CORNERS AND PRIMARY NETWORK CONTROL SURVEY, . COST TO BE INCLUDED IN RELATED BID ITEMS 15.THE EXISTING SOIL CONSISTS OF HARD MATERIALS, EROSION CONTROL DEVICES. COST TO BE INCLUDED IN THE RELATED BID ITEM. 3. ALL TREES ARE TO REMAIN

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd6/26615/crane-blvd-roadway-plans-451637-1-38-01.pdf?sfvrsn=c37117cb_1

Special Provision Workbook FY 2025-26

2025-26) SP0080306 Jobs with 999-16 Pay Item. PROSECUTION AND PROGRESS - PROSECUTION OF WORK, ) (FA 3-13-24) (FY 2025-26) SP0080307RDRB Jobs without 999-20 Pay Items. PROSECUTION AND PROGRESS, ) SP0080308SDRB Jobs with 334, 337, 350, 570 or 649 Pay Items. SPECIAL PROVISIONS Spec Name Usage, ). (REV 7-10-95) (FA 6-21-99) (FY 2025-26) SP1101107 Jobs with 110-84 Pay Item. EXCAVATION, 2025-26) SP3500200 Use when the Plan pay item 350-30 is included or colored structural concrete

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/workbook/special-provision-workbook-fy-2025-26.pdf?sfvrsn=af3d2c4_1

Agency Term Contract - Steel Flanged Channel Posts

is reserved to make award(s) by individual item, group of items, all or none, or a combination thereof, of all items found defective shall be made without cost to the Department, i n cluding transportation, quantity and minimum order quantity acceptable for each item or group of items bid. Excessive minimum, -paid by the vendor and actual charges added to the invoice as a separate item. The contract vendor, multiple (#’s) items be combined to make up the minimum order? X yes / no ALTERNATE BRANDS

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procurement/files_agency_term_contracts/cr13998---contract-document.pdf?sfvrsn=1678b1fa_7

D5570000.do

submittal of As-Built Plans, in accordance with 557-6.2. Payment will be made under: Pay Item No. 557-1 Vibratory Plowing - per foot of aggregate product pull diameter Pay Item No. 2557-1 Vibratory, any damage caused by cutting, heaving, settlement or separation of pavement at no cost, . Theinstallationoftrackingconductors will be included in the cost of the plow and will not be paid for separately, materials installed in a failed plow path will be at no cost to the Department. Nopayment will be made

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2003/january-2003/workbook/d5570000.do.pdf?sfvrsn=4c6cffd1_0
20 of 1087 results