9037 search results for test

SP7410000

specified in the Contract Documents. 741-4 Piezoelectric Axle Sensor Test Requirements. Perform the manufacturer’s recommended on-site pre-installation test to determine the sensor’s condition. Install only those sensors that pass the pre-installation test. Repeat the test, following, any sensor which fails the test at no additional cost to the Department. Record representative, of these vehicles are not in the traffic stream. Place a copy of the final test results, including

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/sp7410000.pdf?sfvrsn=5b8804f8_0

SP7410000

specified in the Contract Documents. 741-4 Piezoelectric Axle Sensor Test Requirements. Perform the manufacturer’s recommended on-site pre-installation test to determine the sensor’s condition. Install only those sensors that pass the pre-installation test. Repeat the test, following, any sensor which fails the test at no additional cost to the Department. Record representative, of these vehicles are not in the traffic stream. Place a copy of the final test results, including

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2012/january-2012/workbook/sp7410000.pdf?sfvrsn=51127507_0

447878-1_Utility_Conflict_Matrix-Phase IIR

(Material, Type, Number, Size) Conflict Description (Possible or Actual) VVH (Y/N) Test Hole VVH, , Type, Number, Size) Conflict Description (Possible or Actual) VVH (Y/N) Test Hole VVH # Suggested, (Possible or Actual) VVH (Y/N) Test Hole VVH # Suggested Conflict Resolution Resolved Status 1 City, Description (Material, Type, Number, Size) Conflict Description (Possible or Actual) VVH (Y/N) Test, , Size) Conflict Description (Possible or Actual) VVH (Y/N) Test Hole VVH # Suggested Conflict

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26111/447878-1_utility_conflict_matrix-phase-iir.pdf?sfvrsn=17b4bb99_1

D0090008.do

)TheContractorhasfurnishedallrequiredmill tests and analysis reports to the Engineer. (g)TheContractorhassubmitted the Form FHWA-47

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2003/files/d0090008.do.pdf?sfvrsn=ea186bc_0

SDB16-09

based on successful crash tests of 42" TL-5 traffic railings in November 2010 and December 2011

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/bulletins/sdb16-09.pdf?sfvrsn=7a59ec63_2

PD and E Manual Archive - 2019

OEM Bulletins and Memorandums CBT = Web Based training that cover the topic and tests

https://www.fdot.gov/environment/pde-manual/archive-2019
20 of 9037 results