2222 search results for bridge inspection

5210000.impl

the barrier wall. Do not use permanent precast concrete barrier wall on bridge or box culvert, and inspections required by Sections 346 and 400 for barrier wall construction. Perform all Quality Control Testing and inspections using CTQP qualified testing personnel. Perform compressive strength testing, . For barrier wall on bridge structures or approach slabs, space contraction joints as shown, joints. Barrier wall on bridge structures and approach slabs to be removed shall be included

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/implemented/5210000.impl.pdf?sfvrsn=63063946_0

6770000.FHWA

of the Standard Specifications for Road and Bridge Construction to the new Section 677 as part of an ongoing, that the extinguisher has a valid inspection tag and is refillablerechargeable. 677-2.2.12 Alarm Specification, . 677-4 Inspection and Verification. 677-4.1 General: The Department may Pperform an inspection, to completion of the installation to schedule the inspection. After installation of the shelter equipmentThe inspection will, verify in conjunction with the Engineer that all equipment

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/fhwa/6770000.fhwa.pdf?sfvrsn=cb8d6e11_0

OOM_20250722_DOT_FDC-Local-Agreement-25_26-Gainesville

-hours (MH) 10.65, 10.65 901 Bridge Inspection Man-hours (MH) 987 Traffic Control Man-hours (MH, Inspection & Service Man-hours (MH) 10.65 531 Attenuator Repair Man-hours (MH) 10.65 532 Pavement, ) 10.65 711 Emergency Bridge Repair Man-hours (MH) 10.65 713 Emergency Non-Pave Road Repair Man, Maintenance Man-hours (MH) 10.65 805 Bridge Joint Repair Man-hours (MH) 10.65 806 Bridge Deck Maintenance & Repair Man-hours (MH) 10.65 810 Bridge Handrail Maintenance & Repair Man-hours (MH

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/maintenance/fdc/local-agreements-2526/oom_20250722_dot_fdc-local-agreement-25_26-gainesville.pdf?sfvrsn=35040af2_1

Chapter5s7

Specifications for Road and Bridge Construction 5.7.4 Correspondence On Federal-Aid Projects, all, and Inspection administered projects and the Consultant Project Manager on Consultant Construction Engineering and Inspection administered projects make every effort to obtain from the FHWA, ." 5.7.11 FHWA Final Inspection Final inspection of a FHWA PODI project shall, whenever possible, include the FHWA Transportation Engineer for inspection conducted at the Department's semifinal

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/chapter5s7.pdf?sfvrsn=24874935_5

CM-680-01 Adaptive Signal Control System

the provisions of Sections 680 and 995 of the FDOT Standard Specifications for Road and Bridge Construction, FORMTEXT Applicant may provide comments in this field. Physical Inspection 2 995-13.1 Adaptive signal, information that shows the product meets this requirement. Document Review and Functional Inspection, . Document Review and Functional Inspection FORMTEXT Indicate location of requested information, and Functional Inspection FORMTEXT Indicate location of requested information in submittal. 5

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/traf_sys/compliance-matrices-2022/cm-680-01-adaptive-signal-control-system.docx?sfvrsn=bb5335ec_1

CM-706-01 Raised Pavement Marker Class F

the provisions of Section 970 of the FDOT Standard Specifications for Road and Bridge Construction and all, comments in this field. Physical Inspection TERL Test Cases (Steps): RPM002 (Step 1) FORMTEXT, information that shows the product meets this requirement. Document Review and Physical Inspection, meets this requirement. Document Review and Functional Inspection FORMTEXT Indicate location, provide comments in this field. Functional Inspection TERL Test Cases (Steps): RPM003 (Step 2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/traf_sys/compliance-matrices-2022/cm-706-01-raised-pavement-marker-class-f.docx?sfvrsn=140ef03c_1

4600101int

to be used in bridge machinery Other members as may be identified in the Contract Documents 1210.Other members as identified in the Contract Documents. Forgings and castings to be used in bridge, Fabrication Categories Structure Type Accepted Accreditation Program Simple Steel Bridge: Pedestrian bridge (prefabricated steel truss pedestrian bridges meeting the Category 1 conditions of FDOT Design Manual 266.4), bridge grid decking AISC Simple Bridge Steel Bridge: Vehicular bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/internal/4600101int05146ff4-3141-4300-9fa7-96a4e4dc97a6.pdf?sfvrsn=396cff93_1

4600101ind

to be used in bridge machinery Other members as may be identified in the Contract Documents 1210.Other members as identified in the Contract Documents. Forgings and castings to be used in bridge, Fabrication Categories Structure Type Accepted Accreditation Program Simple Steel Bridge: Pedestrian bridge (prefabricated steel truss pedestrian bridges meeting the Category 1 conditions of FDOT Design Manual 266.4), bridge grid decking AISC Simple Bridge Steel Bridge: Vehicular bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/4600101ind.pdf?sfvrsn=c300de54_1

D4650000.do

. Ensure that the design is in accordance with the AASHTO LRFD Movable Highway Bridge Design, that inspection may be arranged. Provide free access to all premises where preparation, manufacture, . Such inspections are to facilitate work and avoid errors, but it is understood that they do not constitute, and weld inspections of machinery in accordance with ANSI/AASHTO AWS D1.5, unless otherwise noted, , with inspection requirements stipulated in the plans) for approval before welding is begun. Perform all

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2004/january-2004/workbook/d4650000.doebb828309b024b559108d0c8179a1d57.pdf?sfvrsn=7b6a1f0b_0

D4650000.do

. Ensure that the design is in accordance with the AASHTO LRFD Movable Highway Bridge Design, that inspection may be arranged. Provide free access to all premises where preparation, manufacture, . Such inspections are to facilitate work and avoid errors, but it is understood that they do not constitute, and weld inspections of machinery in accordance with ANSI/AASHTO AWS D1.5, unless otherwise noted, , with inspection requirements stipulated in the plans) for approval before welding is begun. Perform all

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2004/january-2004/workbook/d4650000.do.pdf?sfvrsn=1e9ef2ed_0

4580100ind

and Workbook are effective July 1st every year. BRIDGE DECK JOINTS (REV 6-24-25) SECTION 458 is deleted and the following substituted: 458-1 Description. Furnish and install bridge deck joints, /NSBA Steel Bridge Collaboration “Guideline for Shop Detail Drawing Presentation”. The following, , and sidewalk cover plates (as required). 458-4.3.1 Casting Joint Opening: When casting the bridge deck, and strip seal glands. 458-4.4.1 Glands for Joint Seal: Seals must be continuous heavy duty bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/4580100ind.pdf?sfvrsn=449ee3a7_1

DEV564DCSS (5-21-20)

on structural steel, 2.3years of experience in the inspection of TSC application on structural steel, and 3. Valid SSPC Bridge Coatings Inspector II, or SSPC Protective Coatings Inspector Level III, or NACE, : Personnel performing QC inspections must report directly to a QC Supervisor and are required to possess, on structural steel, 2.1year of experience in inspection of TSC application on structural steel, and 3.Valid SSPC Bridge Coatings Inspector I, or SSPC Protective Coatings Inspector Level I, or NACE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/special-case/developmental/dev564dcss-(5-21-20).pdf?sfvrsn=116790cd_1

SDO - Structures Design Office - Completed Research Projects

International University Freeman, Christina BED29-977-09 12/14/2023 Inspection of Flexible Filler Tendons, BDV31-977-134 2/1/2023 Temperature Effects in Match-Cast Segmental Bridge Construction Riding, Kyle, Development of GFRP Reinforced Single Slope Bridge Rail Consolazio, Gary University of Florida Freeman, Evaluation of Tapered Bridge Bearing Pads Gary R. Consolazio University of Florida Freeman, Christina, Bridge with Ultra-High Performance Concrete Joint Connections Garber, David Florida International

https://www.fdot.gov/structures/structuresresearchcenter/completedresearch.shtm

TIDC2021_FDOT_FRP_implementation

Composites – TIDC Conference 2021 • Florida maintains more than 150 million sq.ft. of bridge area, Bridge “New” and Old (Florida Keys) Seawall bulkhead (Tampa Bay) Waterway splash & spray (FL) Lower, (2) FDOT Bridge Inventory – 2020 Annual Report (3) Estimates from Gittman et al. (2015) 1912 1938, Filled FRP Tubes Mirmiran, A. UCF 1997 Flexural Reliability of RC Bridge Girders Strengthened with CFRP Laminates Okeil, A. UCF 1998 Studies of CFRP Prestressed Concrete Bridge Columns and Piles

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/structures/innovation/frp/tidc2021_fdot_frp_implementation.pdf?sfvrsn=e67358c2_1

4580000.FHWA

as an allowable bridge deck joint. Please review and transmit your comments, if any, within two weeks, . StateConstructionEngineer 4580000.D01 All Jobs BRIDGE DECK JOINTS. (REV 6-11257-31-13) SECTION 458 (Pages 593 – 593) is deleted and the following substituted: SECTION 458 BRIDGE DECK JOINTS 458-1 Description. Furnishandinstall bridge deck joints of the types and at the locations shown in the Plans. This Section, on the bridge. 458-2.2 Poured Joint: Furnish joint sealer or a Type A, B, or C silicone sealant material

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/fhwa/4580000.fhwa.pdf?sfvrsn=8b64ce89_0

William_R_Adams_DRB

, construction engineering and inspection (CEI), and dispute resolution. Proven leadership in high, rebuild • Memorial Causeway Bridge – $47M segmental bridge replacement • SR 56/I-75 Interchange, Contracting Firm (Clearwater, FL) – Estimator & Project Manager • Marine & Bridge Contractor (Tampa

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/constadm/drb/resume/william_r_adams_drb.pdf?sfvrsn=9dcd5192_1

BridgeAnalysisReport_February2025

ENVIRONMENTAL MANAGEMENT 08/22 BRIDGE ANALYSIS REPORT Florida Department of Transportation District, 26, 2022 and executed by the Federal Highway Administration and FDOT. Bridge Analysis Report I-95, .................................................................................................................29 4.2. Bridge 2 – Northbound Ramp from Northbound, . ........................................... 41 4.5. Bridge 5 – Southbound Ramp from I-95 Southbound to Pembroke Road over, . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 6 Bridge Analysis Report I-95 (SR 9) PD&E Study P a g e 3 4 . 9 . W a l l s 47

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/i95-858-820-docs/final-documents/bridgeanalysisreport_february2025.pdf?sfvrsn=7d241288_1

Mark E (DRB)

a successful track record in providing construction contract administration, on-site field inspection, and verification of state and federal requirements on m ajor road and bridge improvement projects, contract administration; overseeing daily inspection assignments and documentation; preparation of monthly, ; Documentation; Inspection; and Claims Avoidance. Parsons Brinckerhoff Construction Services (August 1998 to May, FDOT PE Training Program and served as a Project Engineer on major road and bridge projects. North

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/constadm/drb/resume/mark-e-(drb).pdf?sfvrsn=2777babf_1

E4X33

No: N/A Total Roadway Length: 0.320 Miles Contract Days: 262 Total Bridge Length: 0.315 Miles, turbidity barrier), and monitor existing structures (inspection, settlement) along State Road 716 (Port St. Lucie Boulevard) at Long Creek and North Fork St. Lucie River Bridges (Bridge Nos. 940139, 940140, AND BRIDGE CONSTRUCTION FY2024-25 (SECTION 7-13) FOR INSURANCE LIMITS. Page 6 Bid Solicitation Notice, EXISTING STRUCTURES- INSPECTION AND SETTLEMENT MONITORING (44359525201) LS 1.000 0110- 1- 1 CLEARING

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2024/sep06/e4x33.pdf?sfvrsn=201126cf_1

FHWA Emergency Relief DDIR Final Closeout (Emergency Repair)

)  ☐ Bridge inspection report (if applicable to emergency or permanent repairs) C. Quantities & Scope, Damage photos + photo log o For Bridge-related DDIR, include Bridge Inspection Report (pre- and post

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/emergencymanagement/library/documents/fhwa-emergency-relief-ddir-final-closeout-(emergency-repair).pdf?sfvrsn=642db5d0_1
20 of 2222 results