13214 search results for DESIGN

SPM4250600

except the volume included in the measurement designated to be paid for under the items, of such structures designated to be paid for under separate items, and which are satisfactorily

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/maintenance/review-package/spm4250600.pdf?sfvrsn=f3feb7f2_1

D5560000.do

excavated areas in accordance with the specifications and Design Standards. (d)Provide MOT in accordance with the Department Design Standards and the MUTCD when and where the former is silent. (e, such that their location can be readily determined by electronic designation after installation, mm] from design alignment. (c)Allfunctionsarecontrolledremotely from a surface control unit. (d, blocks designed to distribute loads in a uniform manner so that any deflection of the thrust block

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2003/january-2003/workbook/d5560000.do.pdf?sfvrsn=a9cb04cb_0

D5560000.do

excavated areas in accordance with the specifications and Design Standards. (d)Provide MOT in accordance with the Department Design Standards and the MUTCD when and where the former is silent. (e, such that their location can be readily determined by electronic designation after installation, mm] from design alignment. (c)Allfunctionsarecontrolledremotely from a surface control unit. (d, blocks designed to distribute loads in a uniform manner so that any deflection of the thrust block

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2003/january-2003/workbook/d5560000.doa2c1e3533b414c8eba93cc5719ef61ed.pdf?sfvrsn=24dda4b1_0

5560000.impl

excavated areas in accordance with the specifications and Design Standards. (d) Provide MOT in accordance with the Department Design Standards and the MUTCD when and where the former is silent. (e, be readily determined by electronic designation after installation. For non-conductive installations, to a tolerance of plus or minus 1 inch from design alignment. (c) All functions are controlled remotely from, and lubricants. Use thrust blocks designed to distribute loads in a uniform manner so that any deflection

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/implemented/5560000.impl.pdf?sfvrsn=7f54dffa_0

Agency Term Contract - Arrow and Message Boards

by the contract vendor at their designated ordering location. If more time is needed, the bidder should state, upon receipt of a purchase order by the contract vendor at their designated ordering location. If m, notify FDOT personnel designated on purchase order no less than twenty-four (24) hours prior, to contractors, consultants, designers and the department that certain products and m aterials have

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procurement/files_agency_term_contracts/agency-term-contract---arrow-and-message-boards.pdf?sfvrsn=4b96d159_4

SP4550000DB-723origind

Index Traffic Engineering Manual FDOT Design Manual Construction Project Administration Manual Basis of Estimate/Pay Items Structures Design Guidelines Approved Product List Materials Manual, : Design Bulletin Construction Bulletin Estimates Bulletin Materials Bulletin Have all references, requested and approved by the District Construction Engineer. STRUCTURES FOUNDATIONS (DESIGN BUILD, Materials Office or designated storage location. 455-1.1 Monitor Existing Structures: Monitor

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/internal/sp4550000db-723origind.pdf?sfvrsn=46e182f7_1

4550201FHWA

designed to accommodate the maximum load plus an adequate safety factor. While performing the load, distribution between side friction and end bearing to provide evaluation of the preliminary design calculations and settlement estimates and to provide information for final pile/shaft length design. Ensure, is capable of driving to a resistance equal to at least 2.0 times the factored design load plus the scour, piles. The required driving resistance is equal to the sum of the factored design load plus the scour

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/fhwa/4550201fhwa.pdf?sfvrsn=1088a38c_1

2024 Nonmetropolitan Process Report_Update

Improvement Program (STIP). Nonmetropolitan areas are geographic areas located outside designated, , during planning, development, design, and construction of transportation projects. Additionally, information for local governments to effectively partner with FDOT to plan, design, construct, and communities within a rural area of opportunity community designated under Section 288.0656(7, § 208 and Section 335.066, F.S. State Safety Office Funds planning, design, and construction

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/rural-nonmetropolitan/2024-nonmetropolitan-process-report_update.pdf?sfvrsn=74e7f598_6

550-013

~ (includes post or loop caps, horizontal and brace rail ends, DESIGNATION ASTM DESIGNATION ASTM

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/idx/550-013.pdf?sfvrsn=6d408cb2_1

550-013

, DESIGNATION ASTM DESIGNATION ASTM A709 Grade 36 A36 or A709 Grade 36 A36 or or B221 Alloy

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/idx/550-013.pdf?sfvrsn=aa6aa483_1

0080032SP

. Designate all activities that are controlling work items as determined by the currently accepted Contract

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2005/january-2005/workbook/0080032sp.pdf?sfvrsn=d9ce1066_0

0080032SP

. Designate all activities that are controlling work items as determined by the currently accepted Contract

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2006/january-2006/workbook/0080032sp.pdf?sfvrsn=7bf53500_0

SS0080303

 008 PROSECUTION AND PROGRESS. (REV 5-9-11) (FA 8-16-11) (1-12) SUBARTICLE 8-3.3 (Page 82) is deleted and the following substituted: 8-3.3 Beginning Work: Notify the Engineer not less than five days in advance of the planned start day of work. Upon the receipt of such notice, the Engineer may give the Contractor Notice to Proceed and may designate the point or points to start the work. In the Notice to Proceed, the Engineer may waive the five day advance notice and authorize

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2012/january-2012/workbook/ss0080303.pdf?sfvrsn=2a51fbc8_0
20 of 13214 results