3723 search results for fla

9920000.impl

of thermosetting synthetic polymer which is non-flame supporting and which remains flexible over a temperature, : Flammability tests shall be conducted on the cable, the molded body of the connectors, and the molded protective caps. These materials shall be subjected to five flame application, on for 15 seconds and off for 15 seconds. The materials shall self-extinguish within one minute upon removal of the flame, the connectors are subjected to an impact caused by dropping a cylindrical 10 pound weight having a flat

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/implemented/9920000.impl.pdf?sfvrsn=70edb14e_0

4501105.impl

 450 PRECAST PRESTRESSED CONCRETE CONSTRUCTION. (REV 7-21-14) (FA 8-12-14) (1-15) SUBARTICLE 450-11.5 is deleted and the following substituted: 450-11.5 Cutting Strands and Bars: Upon completion of the detensioning operation, cut strands to required length, using an oxygen flame or mechanical cutting device. Do not use electric arc welders to cut bars or strands. 450-11.5.1 Beams, and form a vertical flat plane without deviations or localized depressions from recessed strands

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/implemented/4501105.impl.pdf?sfvrsn=aea7d6be_0

CM-676-05 Caltrans ATC Cabinet (Dev)

: 1. Auto/Flash switch, 2. Manual On/Off switch, 3. Manual Jack, The service panel shall have the following: 1. AUTO FLASH, 2. SIGNALS ON/OFF, in this field. Physical Inspection and Functional Inspection 12 Cabinet doorframes are double flanged on all 4, , with screw terminals on the bottom flange, is mounted on each side of the cabinet for connection of AC, ). The following compliance matrix criteria are for all ATC cabinets. 60 (995-11.4) When a non-emergency flashing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/traf_sys/compliance-matrices-2022/cm-676-05-caltrans-atc-cabinet-(dev).docx?sfvrsn=ccfeaf63_1

September 27, 2023

T5801 Flagler Resurfacing / Traffic Signals / Sidewalk T5805 Brevard Resurfacing / Basework / Drainage Improvements T5806 Lake Resurfacing 1 T5809 Flagler Roundabout / Milling & Resurfacing

https://www.fdot.gov/contracts/district-offices/d5/lettings/dist-letting-project-info.shtm/lists/contracts-co-lettings-2023/3a8070fc-ba64-4daa-800c-55083419cc23

44737915201-PLANS-03-SIGNALIZATION

MOVEMENTS SHALL FLASH RED. WHEN SIGNAL IS IN FLASHING MODE, MOVEMENTS 2 AND 6 SHALL FLASH YELLOW, THE 5-SECTION HEADS AS THE WHEN SIGNAL IS IN FLASHING MODE, MOVEMENTS 2 AND 6 SHALL FLASH YELLOW. ALL, SIGNAL IS IN FLASHING MODE, MOVEMENTS 2 AND 6 SHALL FLASH YELLOW. ALL 6. PER THE TIMINGS PROVIDED, FLASHER, WARNING FLASHER, ROADWAY LIGHTING, COUNT STATIONS, PAVEMENT MODIFICATIONS, PEDESTRIAN, CROSS STEADY TIMER FLASHING 13 TH AVE TO CROSS PUSH BUTTON Vehicles Watch For START

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25127/44737915201-plans-03-signalization.pdf?sfvrsn=39c67542_1

700-120

' - 0 " Solar Panel Compartment Solar Battery Beacon Flashing 12" Yellow Beacon Flashing 12" Yellow 1 ' - 0 " Beacon Flashing 12" Yellow Sheet 2 See DETAIL "A", Sheet 2 See, powered) is shown. 12" Yellow Flashing Beacon Sign Panel (48" x 48") 1 ' - 0 " S e e I n, 11/01/24 M i n . ROADSIDE SIGN ASSEMBLY-1 FRONT ELEVATION SIDE ELEVATION FLASHING WHEN SIGN, ) is shown. 20 12" Yellow Flashing Beacon S5-1 (24" x 48") Sign 1 ' - 0 " 1 " M i n . 15

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/700-120.pdf?sfvrsn=85b86a3b_1

450-299

FLANGE) (CASE 4) - CONTROL AT BEGIN OR END SPAN BUILD-UP DIAGRAM FOR CREST VERTICAL CURVE SPANS (LOOKING AHEAD STATION) BUILD-UP OVER BEAMS SECTION A-A (ALONG � FLANGE) (CASE 1) BUILD-UP DIAGRAM FOR TANGENT SPANS (ALONG � FLANGE) (CASE 2) BUILD-UP DIAGRAM FOR SAG VERTICAL CURVE & HORIZONTAL CURVE SPANS (ALONG � FLANGE) (CASE 3) - CONTROL AT � SPAN BUILD-UP DIAGRAM FOR CREST VERTICAL CURVE, ) ( S e e B e a m S h e e t s ) ( S e e B e a m � Span � Left Top Flange

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/idx/450-299.pdf?sfvrsn=8523c6dc_1

450-299

in the Data Table* are based on theoretical beam cambers. BEAM CAMBER AND BUILD-UP NOTES: (ALONG � FLANGE, (LOOKING AHEAD STATION) BUILD-UP OVER BEAMS SECTION A-A (ALONG � FLANGE) (CASE 1) BUILD-UP DIAGRAM FOR TANGENT SPANS (ALONG � FLANGE) (CASE 2) BUILD-UP DIAGRAM FOR SAG VERTICAL CURVE & HORIZONTAL CURVE SPANS (ALONG � FLANGE) (CASE 3) - CONTROL AT � SPAN BUILD-UP DIAGRAM FOR CREST VERTICAL CURVE, e e B e a m S h e e t s ) ( S e e B e a m � Span � Left Top Flange � Beam

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/450-299.pdf?sfvrsn=43c84dfc_1

9710701.origind

ASTM D256, Method A 1.0 N·m - Flash Point ASTM D92 475ºF - *The durometer and panel shall, flattening of the profile or raised portions of the line. The flattening of the profile or raised

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/internal/9710701.origind.pdf?sfvrsn=ac7fb1e0_0

9710701.FHWA

A Durometer 40 - Impact Resistance ASTM D256, Method A 1.0 N·m - Flash Point ASTM D92 475ºF, , durability shall include flattening of the profile or raised portions of the line. The flattening

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/fhwa/9710701.fhwa.pdf?sfvrsn=75689fa0_0

1020000.origind

All Jobs 102-5.7 Flagger: Provide flaggers to control traffic when traffic in both directions must, , or by a separate flagger near each device location. Use only flaggers trained in accordance with Section 105, times by, the flagger operating the device. Provide two flaggers on-site and use one of the following, AFAD, the AFAD and the flagger are less than 800 feet apart. 4. Two flaggers are available on-site, , locate the flaggers within view of each other when possible. When visual contact between flaggers

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/internal/1020000.origind.pdf?sfvrsn=4a9fdaf9_0

CM-700-02 Highlighted Sign

information in submittal. 7 MUTCD Section 2A.12.10 If flashed, all LED units flash simultaneously, (chasing) or variable flash rates (dancing), FORMDROPDOWN FORMTEXT Applicant may provide comments, Section 2A.12.11 STOP and YIELD flashing LED units are not actuated and operate continuously

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/traf_sys/compliance-matrices-2022/cm-700-02-highlighted-sign.docx?sfvrsn=ba182413_1

All-Aboard-Florida_2APRIL2017

 MPOAC Meeting Rusty Roberts, VP of Government Affairs April 6, 2017 2 Florida East Coast Industries has deep roots in rail transportation dating back to the late 1800’s with American pioneer, Henry Flagler. Credited with the development of Florida’s east coast, Mr. Flagler, ) INTERCITY PASSENGER RAIL & REAL ESTATE DEVELO PMENT NEW TRAINS FOR A NEW EXPERIENCE FLAGLER’S, Plug in and connect FLAGLER’S LEGACY REBORN MOST INNOVATIVE TRAIN IN AMERICA Virtually touchless

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2017/all-aboard-florida_2april2017.pdf?sfvrsn=a996745f_1

CM-676-06 NEMA ATC Cabinet (Dev)

switches are supplied with the following: 1.Auto/Flash switch 2. Manual On/Off switch, 3. Manual, 995-11.8.3 The service panel switches are supplied with the following: 1.Auto Flash 2.Signals on/off, in this field. Functional Inspection 18 995-11.8.4 Cabinet doorframes are double flanged on all 4, for attaching the top and bottom half of the cabinet onto a flat or round surface. FORMDROPDOWN, to a concrete base: (a) Galvanized anchor bolts, nuts, lock washers, and flat washers

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/traf_sys/compliance-matrices-2022/cm-676-06-nema-atc-cabinet-(dev).docx?sfvrsn=a0bba379_1

SFTY-26-08

Understanding of Flashing Yellow Arrow Justification The Flashing Yellow Arrow (FYA, of the Combined Effect of Offset Left-Turn Lanes and Flashing-Yellow-Arrow Signals at Signalized, , and Rahman, 2024) 2. Evaluation of Driver Comprehension and Visual Attention of the Flashing Yellow Arrow Display for Permissive Right Turns (Jashami et al., 2019) 3. Safety Performance of Flashing, , & Hanson, 2017) 4. Safety Evaluation of Flashing Yellow Arrows for Protected/Permissive Left-Turn

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/program_information/contract.development/ballot/sfty-26-08.pdf?sfvrsn=59278086_1

2025FDM213ModRoundabout

should be as flat as practical to allow the circulatory roadway pavement to slope to the outside, and receiving lane as shown in Figure 213.4.1 . Providing a flat exit radius also helps drivers, . The potential for increased speeds associated with a flatter exit design should be considered when, and flattest path possible for a single vehicle (assumed 6 feet wide) traversing the roundabout, . Provide flat exit geometry when no pedestrian facilities are present. 213.8 Bicycle and Pedestrian

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm213modroundabout.pdf?sfvrsn=42297d2c_3

2025FDM213ModRoundabout

be as flat as practical to allow the circulatory roadway pavement to slope to the outside. See FDM, the circulatory roadway and receiving lane as shown in Figure 213.4.1 . Providing a flat exit, the potential for path overlap. The potential for increased speeds associated with a flatter exit, is defined as the radius (R1, R2, R3, R4, and R5) that provides the smoothest and flattest path possible, of accommodating the design vehicle and providing a safe environment for pedestrians. Provide flat exit

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm213modroundabout.pdf?sfvrsn=4e4b4830_1

E50D9

 Florida Department of Transportation Bid Solicitation Notice and Approximate Quantities Letting:05240507Call Order:009Proposal:E50D9-R0District:05 Counties:FLAGLER, VOLUSIA Road Name:SR A1A Sand & Sea Oats Replenishment Limits:Midpoint Project(s):42795717264(*)Federal Aid No:N/A Total, Counties: Volusia & Flagler Calendar Days: 365 This is a maintenance Work Document driven Contract, of the replenishment of sand and vegetation in various locations on SR A1A in Volusia and Flagler Counties

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2024/may07/e50d9.pdf?sfvrsn=599d4a49_1

4000404.resp2

supporting this falsework can experience excessive web plate deformations, top and bottom flange, the following: "Where practical, forming brackets should be carried to the intersection of the bottom flange, Specifications: "Wherever practical, overhang brackets should bear ear the bottom flange and be attached to the top flange. If overhang brackets bear against the web, the Contractor’s Engineer shall ensure, of the wet slab and forms. The lateral force on the top flange due to overhang brackets shall

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/comments-responses/4000404.resp2.pdf?sfvrsn=4051c715_0
20 of 3723 results