7209 search results for Pavement

SS3550400

 355 PAVEMENT EVALUATION AND REMEDIAL ACTION. (REV2-8-08)(FA2-19-08)(7-08) ARTICLE355-4, e neral: The Department’s Pavement Condition Survey Program and observation by the Engineer will be used as the basis for determining the extent and the magnitude of the pavement distresses, per lane. The Department may conduct a section by section Pavement Condition Survey of the value added pavement at intermediate times throughout the warranty period. The final survey, if determined

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2009/january-2009/workbook/ss3550400.pdf?sfvrsn=2abbbf4_0

SS7100200

 710 PAINTED PAVEMENT MARKINGS. (REV 7-9-09) (FA 7-20-09) (1-10) ARTICLE 710-2 (Page 796, Products List (QPL) meeting the following requirements: Raised Retro-reflective Pavement Markers, : 710-4.1 General: Remove existing pavement markings, such that scars or traces of removed markings will not conflict with new pavement markings, by a method approved by the Engineer. Payment, edges, over existing pavement markings such that not more than 2 inches on either end and not more

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/ss7100200.pdf?sfvrsn=964f6924_0

7020402.impl

 702 WETWEATHERPAVEMENTMARKINGS. (REV6-7-13)(FA8-6-13)(1-14) SUBARTICLE702-4.2(Page839)isdeletedandthefollowingsubstituted: 702-4.2ThicknessandDimensionsofMarkings:Forflatthermoplastic markings provide a thickness of 0.100 to 0.150 inches when measured above the pavement surface, . For profiled thermoplastic markings make profile measurements above the pavement surface. Provide, pavement markings in accordance with FM 5-541. TheEngineer will verify the thickness of the pavement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/implemented/7020402.impl.pdf?sfvrsn=df172988_0

SS1107000

 110-70 REMOVAL OF FLEXIBLE PAVEMENT. (REV 3-9-18) (1-20) The following new Section is added at the end of Section 110: SECTION 110-70 REMOVAL OF FLEXIBLE PAVEMENT 110-70.1 Description. Remove and dispose of existing flexible pavement (asphaltic concrete), base material. Provide backfill, by the Engineer. 110-70.2 Construction Requirements. Saw cut flexible pavement so that the portion, , at no additional cost to the Department. Dispose of all flexible pavement and base material in areas

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/january-2020/maintenance/ss1107000.pdf?sfvrsn=1689bad3_3

SS1107000

 110-70 REMOVAL OF FLEXIBLE PAVEMENT. (REV 3-9-18) (7-19) The following new Section is added at the end of Section 110: SECTION 110-70 REMOVAL OF FLEXIBLE PAVEMENT 110-70.1 Description. Remove and dispose of existing flexible pavement (asphaltic concrete), base material. Provide backfill, by the Engineer. 110-70.2 Construction Requirements. Saw cut flexible pavement so that the portion, , at no additional cost to the Department. Dispose of all flexible pavement and base material in areas

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/maintenance/finalized/ss11070009e273c2421e347309ee06704ebd3a6c4.pdf?sfvrsn=9ace8923_3

SS1107000

 110-70 REMOVAL OF FLEXIBLE PAVEMENT. (REV 3-9-18) (1-19) The following new Section is added at the end of Section 110: SECTION 110-70 REMOVAL OF FLEXIBLE PAVEMENT 110-70.1 Description. Remove and dispose of existing flexible pavement (asphaltic concrete), base material. Provide backfill, by the Engineer. 110-70.2 Construction Requirements. Saw cut flexible pavement so that the portion, , at no additional cost to the Department. Dispose of all flexible pavement and base material in areas

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/maintenance/finalized/ss1107000c71c6f70-1da0-499e-aca9-9be49b3e69aa.pdf?sfvrsn=2598ac8b_2

SS1107000

 110-70 REMOVAL OF FLEXIBLE PAVEMENT. (REV 3-9-18) (7-18) The following new Section is added at the end of Section 110: SECTION 110-70 REMOVAL OF FLEXIBLE PAVEMENT 110-70.1 Description. Remove and dispose of existing flexible pavement (asphaltic concrete), base material. Provide backfill, by the Engineer. 110-70.2 Construction Requirements. Saw cut flexible pavement so that the portion, , at no additional cost to the Department. Dispose of all flexible pavement and base material in areas

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/maintenance/finalized/ss1107000.pdf?sfvrsn=d7afbbe5_1

SS1107000

 110-70 REMOVAL OF FLEXIBLE PAVEMENT. (REV 8-1-13) (1-18) The following new Section is added at the end of Section 110: SECTION 110-70 REMOVAL OF FLEXIBLE PAVEMENT 110-70.1 Description. Remove and dispose of existing flexible pavement (asphaltic concrete), base material. Provide backfill, by the Engineer. 110-70.2 Construction Requirements. Saw cut flexible pavement so that the portion, , at no additional cost to the Department. Dispose of all flexible pavement and base material in areas

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/maintenance/finalized/ss1107000.pdf?sfvrsn=582c9a42_1

SS1107000

 110-70 REMOVAL OF FLEXIBLE PAVEMENT. (REV 8-1-13) (7-17) The following new Section is added at the end of Section 110: SECTION 110-70 REMOVAL OF FLEXIBLE PAVEMENT 110-70.1 Description. Remove and dispose of existing flexible pavement (asphaltic concrete), base material. Provide backfill, by the Engineer. 110-70.2 Construction Requirements. Saw cut flexible pavement so that the portion, , at no additional cost to the Department. Dispose of all flexible pavement and base material in areas

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/maintenance/finalized/ss1107000.pdf?sfvrsn=b02cc518_1

SS1107000

 110-70 REMOVAL OF FLEXIBLE PAVEMENT. (REV 8-1-13) (1-17) The following new Section is added at the end of Section 110: SECTION 110-70 REMOVAL OF FLEXIBLE PAVEMENT 110-70.1 Description. Remove and dispose of existing flexible pavement (asphaltic concrete), base material. Provide backfill, by the Engineer. 110-70.2 Construction Requirements. Saw cut flexible pavement so that the portion, , at no additional cost to the Department. Dispose of all flexible pavement and base material in areas

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/january-2017/maintenance/finalized/ss1107000.pdf?sfvrsn=d6daee55_2

SPI-160-001

(Specifications) , Section 160; FDOT Flexible Pavement Design Manual (FPDM) ; and FDOT Rigid Pavement Design Manual (RPDM) Design Assumptions and Limitations Index 160-001 provides minimum, separators. For additional information about stabilized subgrade, refer to the Flexible Pavement Design Manual (FPDM) and FDOT Rigid Pavement Design Manual (RPDM) . Plan Content Requirements Provide

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/spi/spi-160-001.pdf?sfvrsn=50d71d6b_1

SPI-370-001

 Standard Plans Instructions Topic No. 625-010-003 Index 370-001 Bridge Approach Expansion Joint Concrete Pavement with Special Select Soil Base FY 2026-27 1 Index 370-001 Bridge Approach Expansion Joint Concrete Pavement with Special Select Soil Base Design Criteria Rigid Pavement Design Manual (RPDM), Structures Manual Design Assumptions and Limitations It should be noted, Approach Expansion Joint for Concrete Pavement LF See the BOE and Specification 370 for additional

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/spi/spi-370-001.pdf?sfvrsn=b0864b04_1

SP3500200-i19820

 CEMENT CONCRETE PAVEMENT (COLORED CONCRETE). (REV 5-11-16) (FA 5-12-16) (FY 2026-27) ARTICLE 350-1 is expanded by the following: Construct colored portland cement concrete pavement as shown, General: Meet the following requirements: Concrete, Class I or Class I (Pavement) .............Section 346 Grinding Concrete Pavement ..............................Section 352 Curing Materials, .............................................................Section 932 For concrete pavement placed using the slip-form method of construction, utilize

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/workbook/sp3500200-i19820.pdf?sfvrsn=a15de6c3_1

7100402-724FHWA

Pavement Markings. Dear Mr. Nguyen: We are submitting, for your approval, two copies of the above, . State Construction Engineer 7100402 All Jobs PAINTED PAVEMENT MARKINGS. (REV 7-10-23, existing pavement markings, such that scars or traces of removed markings will not conflict with new pavement markings, by a method approved by the Engineer. Before applying pavement markings, remove any material that would adversely affect the bond of the pavement markings by a method approved

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/fhwa/7100402-724fhwa.pdf?sfvrsn=b3067fa0_1

7100402-724IMPL

 710 PAINTED PAVEMENT MARKINGS. (REV 7-10-23) (FA 12-5-23) (FY 2024-25) ARTICLE 710-4 is deleted and the following substituted: 710-4 Application. 710-4.1 General: Remove existing pavement markings, such that scars or traces of removed markings will not conflict with new pavement markings, by a method approved by the Engineer. Before applying pavement markings, remove any material that would adversely affect the bond of the pavement markings by a method approved by the Engineer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/implemented/7100402-724impl.pdf?sfvrsn=439ee1c8_1

BOW

Pavement Inspections Airport Directory Information Please explore the data, License 07-01-1969 Airport License 07-01-1968 Pavement Inspections Pavement condition is assessed utilizing the pavement, methodology provides a means for systematically assessing pavement condition, , or reconstruction efforts required to sustain functional pavement

https://www.fdot.gov/aviation/airportslist/BOW

Dev331BPM (9-20-21)

, potholes, rumble strips, and/or joints on asphalt pavements using a polymer modified bituminous patching, will be the final driving pavement surface. 331-2 Materials. 351-2.1 Patching Material: Provide a hot, capable of effectively repairing or alleviating (or both) distresses in pavement, so the ride quality is improved, or the pavement life is extended (or both). Submit documentation of independent field, material supplier according to climatic conditions to provide a durable pavement repair with good fluidity

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/special-case/developmental/dev331bpm-(9-20-21).pdf?sfvrsn=c0af9b90_1

7010201-724FHWA

: 7010201 Profiled Thermoplastic Pavement Markings. Dear Mr. Nguyen: We are submitting, for your, All Jobs PROFILED THERMOPLASTIC PAVEMENT MARKINGS. (REV 7-7-23) ARTICLE 701-2 is deleted, thermoplastic pavement markings and raised bumps using a method approved by the Engineer such that pavement surface scars or traces of the removed thermoplastic pavement markings will not conflict with new pavement markings. Do not use paint to blackout, hide, or disguise existing pavement markings

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/fhwa/7010201-724fhwab7502d15-9014-412f-82da-5d123d831e9a.pdf?sfvrsn=af90ce18_1

7010201-724FHWA

: 7010201 Profiled Thermoplastic Pavement Markings. Dear Mr. Nguyen: We are submitting, for your, All Jobs PROFILED THERMOPLASTIC PAVEMENT MARKINGS. (REV 7-7-23) ARTICLE 701-2 is deleted, thermoplastic pavement markings and raised bumps using a method approved by the Engineer such that pavement surface scars or traces of the removed thermoplastic pavement markings will not conflict with new pavement markings. Do not use paint to blackout, hide, or disguise existing pavement markings

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/fhwa/7010201-724fhwa.pdf?sfvrsn=dbf9a462_1

7010201-724IMPL

 701 PROFILED THERMOPLASTIC PAVEMENT MARKINGS. (REV 7-7-23) (FA 11-30-23) (FY 2024-25) ARTICLE, thermoplastic pavement markings and raised bumps using a method approved by the Engineer such that pavement surface scars or traces of the removed thermoplastic pavement markings will not conflict with new pavement markings. Do not use paint to blackout, hide, or disguise existing pavement markings. Before applying pavement markings, remove any material that would adversely affect the bond

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/implemented/7010201-724impl.pdf?sfvrsn=b4ec2500_1
20 of 7209 results