13214 search results for DESIGN
NPDES CGP SWPPP Template for FDOT Projects_form
This template is intended for use on traditional design-bid-build contracts. The information for each item, to the Department’s construction contractor and subcontractor(s). (Design) refers to the Department’s in-house or consultant design team. (Design/Contractor) items are intended to be initially provided by Design, supplemental table. Site/Construction Activities (Design) Describe the nature, construction activity. (Design) Total area of site – (as shown on Contract Plans) FORMTEXT Acre(s
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/drainage/files/npdes-cgp-swppp-template-for-fdot-projects_form.docx?sfvrsn=e208d90_6PublicHearingFormalPresentation
impacts, social impacts, public input, engineering design, and project costs Required to satisfy, on the proposed conceptual design plans 46 impacted parcel properties The estimated right, Proposed improvements were designed to avoid impacting these important resources 30, evaluated at 12 locations • 5 locations were recommended for further consideration in the project’s Design, area designated as “attainment” The project meets the maximum air quality standards established
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/i95-858-820-docs/april2025publicmtg/publichearingformalpresentation.pdf?sfvrsn=b23933df_1CPAM 7.5 REDLINE 11-17-2025
fails to provide the weekly statements of cost, the PA or designee shall notify the Contractor, Claim 2. Correspondence to and from Contractor 3. Correspondence to and from Designer 4. Inter, . Weather Data 6. As-Built Schedules 7. Estimates Desk Review 8. Designer’s Files 9. Specifications
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newhistory/cpam-7-5-redline-11-17-2025.pdf?sfvrsn=42a3ef39_1Chapter7s5
, the PA or designee shall notify the Contractor in writing of their obligation under the c ontract, . Correspondence to and from Designer 4. Inter-Department Correspondence and Memos 5. Correspondence, 8. Designer’s Files 9. Specifications and Estimates File 10. Utility Files 11. Video Recordings
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/chapter7s5.pdf?sfvrsn=4e9d830_79160000SS
. 6.AllPGasphaltbindershavingahightemperature designation of PG 67 or lower shall be prepared without modification. 7.AllPGasphaltbindershavingahightemperature designation higher than PG 67 shall, designation, and amount added shall be indicated. Suppliers shall not ship any PG binder until notified, product designation and amount. Any special handling or temperature requirements shall be indicated, sample shall be submitted to the Department and tested per 916-5.1. 916-5.3 Mix Design
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2005/january-2005/workbook/9160000ss.pdf?sfvrsn=148560f_09160000SS
. 6.AllPGasphaltbindershavingahightemperature designation of PG 67 or lower shall be prepared without modification. 7.AllPGasphaltbindershavingahightemperature designation higher than PG 67 shall, designation, and amount added shall be indicated. Suppliers shall not ship any PG binder until notified, product designation and amount. Any special handling or temperature requirements shall be indicated, sample shall be submitted to the Department and tested per 916-5.1. 916-5.3 Mix Design
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2006/january-2006/workbook/9160000ss.pdf?sfvrsn=d70e347c_02024FDM128FedAidCert
Topic #625-000-002 FDOT Design Manual 128 - Federal Aid Project Certification 128 Federal-Aid, responsibilities and approvals for design, plans, specifications, estimates, contract awards, , 2024 1 Topic #625-000-002 FDOT Design Manual 128 - Federal Aid Project Certification 128.2, ) Demonstration (demo) and pilot projects (4) Interstate projects: (a) With Design Exceptions to the 10, (5) Projects utilizing innovative contracting methods (e.g., design build, public-private
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm128fedaidcert.pdf?sfvrsn=2578fe92_12025FDM128FedAidCert
Topic #625-000-002 FDOT Design Manual 128 - Federal Aid Project Certification 128 Federal-Aid, responsibilities and approvals for design, plans, specifications, estimates, contract awards, contract, USC 106), and Title 23 Code of Federal Regulations 636 (23 CFR 636). Topic #625-000-002 FDOT Design, ) Interstate projects: (a) With Design Exceptions to the 10 controlling criteria (b) For new, contracting methods (e.g., design build, public-private partnerships) (6) Special Experimental Projects
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm128fedaidcert.pdf?sfvrsn=912e803c_12025FDM128FedAidCert
Topic #625-000-002 FDOT Design Manual 128 - Federal-Aid Project Certification 128 Federal-Aid, responsibilities and approvals for design, plans, specifications, estimates, contract awards, , 2025 1 Topic #625-000-002 FDOT Design Manual 128 - Federal-Aid Project Certification 128.2, ) Demonstration (demo) and pilot projects (4) Interstate projects: (a) With Design Exceptions to the 10, (5) Projects utilizing innovative contracting methods (e.g., design build, public-private
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm128fedaidcert.pdf?sfvrsn=f586812a_2Section34V2-722cln
, Office of Materials, or designee. 3.4.8.2.2 Handling and Storage Obtain a 1-gallon split sample
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/materials-manual/section34v2-722cln.pdf?sfvrsn=69b5fd85_4Section34V2-725
of Materials, or designee. 3.4.8.2.2 Handling and Storage Obtain a 1-gallon split sample of each
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/materials-manual/section34v2-725.pdf?sfvrsn=7cbffe80_1MM 3.4 V2 clean
of Materials, or designee. 3.4.8.2.2 Handling and Storage Obtain a 1-gallon split sample of each
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/materials-manual/mm-3-4-v2-clean.pdf?sfvrsn=e2dc3fe0_2Section34V2-723cln
of Materials, or designee. 3.4.8.2.2 Handling and Storage Obtain a 1-gallon split sample of each
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/materials-manual/section34v2-723cln.pdf?sfvrsn=e4ca6718_2Section35V2-725cln
of the Director of Materials or designee. Asphalt Binder 3-5-6 Topic No.: 675-000-000 Effective: October
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/materials-manual/section35v2-725cln.pdf?sfvrsn=3a949b33_1Section3.5-051018_1-19WB
or designee. Topic No.: 675-000-000 Effective: October 13, 2014 Materials Manual Bituminous
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/materials-manual/section3-5-051018_1-19wb.pdf?sfvrsn=917015bc_1Section3.4-051018_1-19WB
to the satisfaction of the Director of Materials or designee. 3.4.8.2.2 Handling and Storage Obtain a 1-gallon
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/materials-manual/section3-4-051018_1-19wb.pdf?sfvrsn=c10ac767_1Section3.4-051018_1-19WB
to the satisfaction of the Director of Materials or designee. 3.4.8.2.2 Handling and Storage Obtain a 1-gallon
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/materials-manual/section3-4-051018_1-19wb.pdf?sfvrsn=e057882a_1Section3.5-051018_1-19WB
or designee. Topic No.: 675-000-000 Effective: October 13, 2014 Materials Manual Bituminous
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/materials-manual/section3-5-051018_1-19wb.pdf?sfvrsn=4d59cebb_1Section34V2-723
, Office of Materials, or designee. 3.4.8.2.2 Handling and Storage Obtain a 1-gallon split sample
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/materials-manual/redline/section34v2-723.pdf?sfvrsn=4fc65e67_1CapacityTemplate
Phase 32 Capacity Phase 32 Capacity Template (24 Month Design) Phase 32 Capacity Phase 32 Capacity Template (24 Month Design) 1639 0 01-Jul-25 10-Oct-31 No Project Manager No Project Manager 1639 0, A.IVEY WBS250 Preliminary Engineering 96 129 01-Jul-25 11-Nov-25 164032 PREPARE DESIGN SCOPE OF SERVICES 35 0 02-Jul-25 19-Aug-25 450032 DESIGN TIP / STIP AMENDMENT 60 61 02-Jul-25 23-Sep-25 A.SMITH 9450032 INITIATE DESIGN PC REVIEW / RECEIVE LRTP UPDATE 90 43 02-Jul-25 04-Nov-25 J.KIRKLAND 325010
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/designsupport/districts/d3/toolbox/capacitytemplate.pdf?sfvrsn=34129f2f_9