2365 search results for apl
4460400-722origind
to be consistent with formatting of PATH/APL requirements. Please share this proposal with others, material. **Use products listed on the Department’s Approved Products List (APL)
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/4460400-722origind.pdf?sfvrsn=4708bf6_23000201-122impl
300 PRIME AND TACK COATS (REV 5-3-21) (FA 7-14-21) (1-22) SUBARTICLE 300-2.1 is deleted and the following substituted: 300-2 Materials. 300-2.1 Prime Coat: For prime coat, use a product listed on the Department’s Approved Product List (APL), meeting the requirements of 916-3, or other types and grades of bituminous material if specified in the Contract Documents. A copy of the Bill, on the APL, meeting the requirements of 916-3. Heat the emulsion to the temperature recommended
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/implemented/3000201-122impl.pdf?sfvrsn=7c1f8333_29920700.resp
it not be appropriate to require the product to be included in the APL rather than imposing, ) This will be a new category on the APL. No change made
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/comments-responses/9920700.resp.pdf?sfvrsn=ca7f9d63_07060000.impl
. Use only RPMs and bituminous adhesive that are listed on the Department’s Approved Product List (APL, of RPMs. At the time of notification, submit the APL number and the batch or Lot numbers of RPMs
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/implemented/7060000.impl.pdf?sfvrsn=b492c0e1_06700200.FHWA
List (APL). Traffic controller assemblies and intersection control beacon controller assemblies must, only controller components listed on the Department’s Approved Product List (APL). Provide
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/fhwa/6700200.fhwa.pdf?sfvrsn=a025a88_09160203.impl
Asphalt Binder Grade Report APL Number Report Modifier (name and type) Polymer, Ground Tire Rubber with Approved Product List (APL) number, Sulfur, PPA, REOB, and any Rejuvenating Agents Report
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/implemented/9160203.impl.pdf?sfvrsn=7c09336a_06500000.comm
6500000 VEHICULAR TRAFFIC SIGNAL ASSEMBLIES COMMENTS FROM INTERNAL/INDUSTRY REVIEW Karen Byram 414-4353 karen.byram@dot.state.fl.us Comments: (5-31-17, Internal) These modifications affects the APL by modifying existing product requirements and creating new APL categories in 650-3.13. These issues will need to be resolved with Product Evaluation. I do not know the extent of the change at this time. Response
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/comments-responses/6500000.comm.pdf?sfvrsn=b2e5ece0_06820000.resp
on the APL. We need to discuss and agree on a plan of APL implementation for this change. Response: This addition will not affect anything currently listed on the APL because there are no fixed cameras currently listed on the APL. No change made. 2. 682-1.2.5: The addition of the statement, APL requirements. APL requires products to meet requirements at the time of placement. We need, . When the old APL Traffic Operations equipment were merged with the old QPL the results was that all
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/comments-responses/6820000.resp.pdf?sfvrsn=8f9f4168_05360000.impl
in the Plans and APL drawings and in accordance with the geometry and adjacent grading of the Design Standards. The APL number must be permanently marked on each assembly at a readily visible location, to construct any Department-approved "flared" terminal assembly identified on the APL, subject to the conditions identified in the Plans or the APL drawings. Likewise, if the Plans call for a "parallel, the option to construct any Department-approved "parallel" terminal assembly identified on the APL
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/implemented/5360000.impl.pdf?sfvrsn=9fc1e2f7_06460200.impl
(APL). Manufacturers seeking APL approval of proprietary transformer bases must submit an application
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/implemented/6460200.impl.pdf?sfvrsn=970ab6bd_07090500.origind
involve APL changes? Yes No Product Evaluation staff contacted (name): Will the proposed revision, of notification, submit a certification to the Engineer with the APL number and the batch/ or lLot numbers
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/internal/7090500.origind.pdf?sfvrsn=581daf66_07130500.origind
involve APL changes? Yes No Product Evaluation staff contacted (name): Will the proposed revision, of notification, submit the APL number and the batch/ or lLot numbers of tape to be used. Furnish
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/internal/7130500.origind.pdf?sfvrsn=da0e1a19_06030500.impl
603 GENERALREQUIREMENTSFORTRAFFICCONTROLSIGNALSAND DEVICES. (REV10-14-15)(FA12-27-15)(7-16) ARTICLE603-5isdeleted and the following substituted: 603-5 Submittal Data Requirements. Priortotheinstallationof equipment and within 30 days after the preconstruction conference, submit a listing of all traffic control signals, devices, and hardware with Department APL approval numbers, equipment or materials that do not have a APL approval number, submit the manufacturer’s
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/implemented/6030500.impl.pdf?sfvrsn=d0b0a726_09190000.impl
. 919-2.4 Approved Product List (APL): GTR and pelletized rubber used shall be one of the products listed on the Department’s Approved Product List (APL). Manufacturers seeking evaluation
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/implemented/9190000.impl.pdf?sfvrsn=12a3bc3d_03370206.origind
? Yes No Structures staff contact ed ( name ) : Will the proposed revision involve APL changes, Additive: Meet the requirements of 916-34 and be listed on the Department’s Approved Product List (APL
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/internal/3370206.origind.pdf?sfvrsn=6bf994a5_07000100.origind
? Yes No Structures staff contact ed ( name ) : Will the proposed revision involve APL changes, than 144 pounds are not listed on the APL, and must be submitted to the Engineer for approval. Provide, . Light emitting diode (LED) retrofit kits must be listed on the APL. SUBARTICLE 700-3.2.1.2, sheeting must meet the requirements of Section 994, and be listed on the APL. 7000100 All Jobs, certification the sign has been reviewed, approved and is listed on the APL meets
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/internal/7000100.origind.pdf?sfvrsn=a11a9e30_01021004.origind
? Yes No Structures staff contact ed ( name ) : Will the proposed revision involve APL changes, substituted: 102-10.4 Temporary Retroreflective Pavement Markers (RPM’s): Use markers listed on the APL
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/internal/1021004.origind.pdf?sfvrsn=5fb95e45_04620000.comm
1. 462-7.4.2.1.4()4620000 POST-TENSIONING COMMENTS FROM INTERNAL/INDUSTRY REVIEW Karen Byram 414-4353 karen.byram@dot.state.fl.us Comments: (5-22-15) 462-2.4 Other Material References, All the materials identified on the APL need to be marked with an asterisk and the asterisk comment added stating “Use products listed on the Department’s Approved Products List (APL). Response: ****************************************************************************** Paul Vinik 352-955-6686
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/comments-responses/4620000.comm.pdf?sfvrsn=1ead306c_04620000.comm2
1. 462-7.4.2.1.4()4620000 POST-TENSIONING COMMENTS FROM INTERNAL/INDUSTRY REVIEW Karen Byram 414-4353 karen.byram@dot.state.fl.us Comments: (5-22-15) 462-2.4 Other Material References, All the materials identified on the APL need to be marked with an asterisk and the asterisk comment added stating “Use products listed on the Department’s Approved Products List (APL). Response: ****************************************************************************** Paul Vinik 352-955-6686
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/comments-responses/4620000.comm2.pdf?sfvrsn=be45a5d4_04620000.resp2
1. 462-7.4.2.1.4()4620000 POST-TENSIONING COMMENTS FROM INTERNAL/INDUSTRY REVIEW Karen Byram 414-4353 karen.byram@dot.state.fl.us Comments: (5-22-15) 462-2.4 Other Material References, All the materials identified on the APL need to be marked with an asterisk and the asterisk comment added stating “Use products listed on the Department’s Approved Products List (APL). Response: ****************************************************************************** Paul Vinik 352-955-6686
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/comments-responses/4620000.resp2.pdf?sfvrsn=d49ff660_0