3761 search results for REPORT NUMBER
6110402-723FHWA
Number 750-040-07 for all installed field switches or other procedure approved by the Engineer. For the closed--circuit television (CCTV) camera, complete FDOT Form Number 750-040-08 for all, system (MVDS), complete FDOT Form Number 750-040-09 for all installed MVDS sensors or other procedure approved by the Engineer. For the camera lowering device (CLD), complete FDOT Form Number, (DMS), complete FDOT Form Number 750-040-11 for all installed DMS. For the remote power management
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/fhwa/6110402-723fhwa.pdf?sfvrsn=7fc6fbc0_1DT1
a report... Inspection Report 05-14-2025 Inspection Report 05-15-2024 Inspection Report 05-10-2023 Inspection Report 05-18-2022 Inspection Report 05-12-2021 Inspection Report 12-09-2020 Inspection Report 05-15-2019 Inspection Report 05-02-2018 Inspection Report 05-24-2017 Inspection Report, Inspection Record 01-13-2009 Inspection Report 01-17-2008 Inspection Record 01-16-2007 Inspection Record, Management Program Summary Report. The summary reports
https://www.fdot.gov/aviation/airportslist/DT1FCTD_Ad-hoc_report_AOR082123
A Study of the Annual Operating Report and the Data Used to Create It Florida Commission, of the Annual Operating Report and the Data Used to Create It Florida Commission for the Transportation, ) ....................................................................56 1 Annual Operating Report (AOR) Study Executive Summary Every year, Community Transportation Coordinators (CTCs) submit an Annual Operating Report (AOR, for the Completion of the Annual Operating Report (AOR): FY 2021-22” Florida Commission for Transportation
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/meetingpackages/2023meetings/fctd_ad-hoc_report_aor082123.pdf?sfvrsn=e7271a28_1TEO-25-01
Request for Research Funding for FY 2024-2025 Project Number (Research Center Use Only): TEO-25-01 Requesting Office State Traffic Engineering and Operations Priority 1 of 8 Proposed Title Evaluating the Effectiveness of Video Analytics Systems and Their Pedestrian Detection Algorithms, 7 – Draft Final report and Task 8 – Final report Impact This project will have statewide impact, blank) Evaluation, Review, Pedestrian Detection. Related Contracts (Give contract numbers
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/program_information/contract.development/ballot/teo-25-01.pdf?sfvrsn=b31d29a5_19510100-724origind
documents (such as a treatment certification, a treating report, and an assay report). All calls, to the appropriate specifications. The certification shall include: the project/order number, timber species, charge numbers, and assay retention results. The producer/treater shall maintain all
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/internal/9510100-724origind.pdf?sfvrsn=aaba0cef_19850000-722resp
name, style number, roll dimensions and LOT numbers must be clearly labeled on all packaging, of the specification. The NTPEP Audit Report is limited to Structural Geosynthetic Materials. NTPEP Audit Report
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/comments-responses/9850000-722resp.pdf?sfvrsn=8d32bcfc_2Section35V2-725cln
at each supply location with their APL number. (C) A current list of tests and qualifications, lab is not operational. (D) The tank identification numbers with the corresponding volumes, report, Asphalt Binder 3-5-4 Topic No.: 675-000-000 Materials Manual Effective: October 13, 2014, of sampling. Ensure that the tank number, Supplier’s LOT number, material grade, and sample date, , as applicable: (A) Material grade and APL number (B) Quantity of material (in Gallons) (C) Anti
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/materials-manual/section35v2-725cln.pdf?sfvrsn=3a949b33_1Section3.5-051018_1-19WB
) An updated list of materials being supplied at each supply location with their APL number. (C, numbers with the corresponding volumes (in gallons). (E) The sampling and testing procedures for QC, a statement that the transport vehicle inspection report, Topic No.: 675-000-000 Effective: October 13, 2014, that the tank number, Supplier’s LOT number, material grade, and sample date is clearly labeled, : (A) Material grade and APL number (B) Quantity of material (in Gallons) (C) Anti-strip name, amount
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/materials-manual/section3-5-051018_1-19wb.pdf?sfvrsn=917015bc_1Section35-051815 1-16
. (B)An updated list of materials being supplied at each supply location with their APL number. (C, laboratory for situations where the primary lab is not operational. (D)The tank identification numbers, that the transport vehicle inspection report, signed by the responsible inspector, shall be maintained, from the date of sampling. Ensure that the tank number, Supplier’s LOT number, material grade, of the following items, as applicable: (A)Material grade and APL number (B)Quantity of material
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/materials-manual/section35-051815-1-16.docx?sfvrsn=22c51609_1section3.5-vii
supplied at each supply location with their APL number. Topic No.: 675-000-000 Effective: October, where the primary lab is not operational. (D) The tank identification numbers, vehicle inspection report, signed by the responsible inspector, shall be maintained, of sampling. Ensure that the tank number, Supplier’s LOT number, material grade, and sample date, Material Asphalt Binder 3-5-7 (A) Material grade and APL number (B) Quantity of material (in Gallons
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/materials-manual/section3-5-vii.pdf?sfvrsn=542b41d2_1Section3.5-051018_1-19WB
) An updated list of materials being supplied at each supply location with their APL number. (C, numbers with the corresponding volumes (in gallons). (E) The sampling and testing procedures for QC, a statement that the transport vehicle inspection report, Topic No.: 675-000-000 Effective: October 13, 2014, that the tank number, Supplier’s LOT number, material grade, and sample date is clearly labeled, : (A) Material grade and APL number (B) Quantity of material (in Gallons) (C) Anti-strip name, amount
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/materials-manual/section3-5-051018_1-19wb.pdf?sfvrsn=4d59cebb_12024FDM131PlansProcessing
Quantities Report, and other contract and transmittal documents. PS&E Submittals are numbered, Management Office. (6) Authorization Estimate: The Authorization Estimate is a report generated, Package with all required components. Show the new Proposal/Contract ID number on the Key Sheet(s
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm131plansprocessing.pdf?sfvrsn=966fc248_12024FDM131PlansProcessing
and BIM.zip, Specification Package, the Estimated Quantities Report, and other contract and transmittal documents. PS&E Submittals are numbered consecutively, and re-submittals are required until the project, : The Authorization Estimate is a report generated by the Design Quantities and Estimates (DQE, with all required components. Show the new Proposal/Contract ID number on the Key Sheet(s). Project
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm131plansprocessing.pdf?sfvrsn=153bb58d_12025FDM131PlansProcessing
, the Estimated Quantities Report, and other contract and transmittal documents. PS&E Submittals are numbered consecutively, and re-submittals are required until the project is accepted by the District Program Management Office. (6) Authorization Estimate: The Authorization Estimate is a report, ID number on the Key Sheet(s). Project documents in Central Office from the previous submittal
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm131plansprocessing.pdf?sfvrsn=3e9edc1d_12025FDM131PlansProcessing
Plans and BIM.zip, Specification Package, the Estimated Quantities Report, and other contract and transmittal documents. PS&E Submittals are numbered consecutively, and re-submittals are required, : The Authorization Estimate is a report generated by the Design Quantities and Estimates (DQE, number on the Key Sheet(s). Project documents in Central Office from the previous submittal
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm131plansprocessing.pdf?sfvrsn=298735de_19900100.origind
for inclusion on the APL shall include the FHWA WZ numbered acceptance letter with attachments and vendor, of proprietary temporary barrier systems for inclusion on the APL must be the NCHRP Report 350 TL-3, of crash cushions for inclusion on the APL must be the NCHRP Report 350 TL-2 or TL-3 criteria or MASH
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/internal/9900100.origind.pdf?sfvrsn=44c97cd6_0E54B2Addenda001
FINANCIAL PROJECT NUMBER(s): 442884-1-52-01, 442884-1-52-02, 442874-1-52-01, 442874-1-52-02 and 446544-1-52-01 CONTRACT NUMBER: E54B2 COUNTY: Volusia DESCRIPTION: SR A1A, from International Speedway, REVISION The Estimated Quantities Report for 442884-1 and 442874-1 have been revised. Please go, : Financial Project ID (Lead number only) Proposal/Contract ID SUPPLEMENTAL SPECIFICATIONSPACKAGE NUMBER SheetNo(s).Rev.Date Description Summary of Quantities Pay Item Sheet No.Add. / Del. / Rev.Old
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2024/may07/e54b2addenda001.pdf?sfvrsn=7a11512c_1E6O89Addendum001
Revision #1 Estimate of Quantities Report Revision #1 Plans Revision #1 If you are a BID, ://cpp.fdot.gov/ to download the Amendment file for this addendum. FPID Sheet Number Revision Date, to Index PLANS REVISION NUMBER 01 Sheet Number Revision Date Description 1-3 7/23/2024 Deleted, Bridge Decks) SUPPLEMENTAL SPECIFICATION PACKAGE NUMBER 01 Generated on: 7/16/2024 4:25:45 PM Date: 7/16/2024 Financial Project ID: (Lead Number Only) 444803-1 E6O89 Proposal/Contract ID: FPID
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/lettings/2024/jul25/e6o89addendum001.pdf?sfvrsn=d3c9c494_1Reeval QA QC Checklist-2023
figures and graphics are legible ☐ ☐ Check that figures are numbered and referenced correctly, are summarized in the Cultural Resources Assessment Survey (CRAS) Report addendum) Before Initial Submittal, in previous Re-evaluations when applicable) such as alignment, number of lanes, their width, major structures, to the PCR ☐ ☐ ☐ ☐ The applicable Federal Aid Project (FAP) number is used in the PCR ☐ Comments, Report, Natural Resources Evaluation (NRE), Noise Study Report (NSR), Pond Siting Report (PSR), Surveys
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/pdeman/reeval-qa-qc-checklist-2023.pdf?sfvrsn=68329e4e_1Constructability Phase Checklist
(CRAS) Report ☐ Wildlife Study Report or Natural Resource Evaluation (NRE) ☐ Wetland Survey Report, /Exemption) ☐ Bridge Asbestos Report/Lead Based Paint Report ☐ Level I and II Contamination Assessment Report ☐ OFF SHS ☐ON SHS ☐CRITICAL PROJECT (Structural Elements) Page 2 of 4 Agency: Completion, LAP Manual, Chapter 21 Include page numbers under “Requirement Location” for reference, Justification Report AASHTO Roadway Lighting Design Guide FDM, Chapter 231.4 □ NO change to access
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/designsupport/districts/d4lap/projectmanagementanddistrictresources/design/archive/constructability-phase-checklist.pdf?sfvrsn=e4dd307d_2