7243 search results for Pavement

2024FDM202SpeedMgmt

of this device. 202.3.10 Posted Speed Pavement Marking Posted Speed markings placed directly on the pavement, ). Coordinate with the District Traffic Operations Engineer on the use of Posted Speed pavement, signs where appropriate. • Pavement markings: lane narrowing can be highlighted with the use of a wider outside stripe. The Posted Speed may be placed on the pavement. • Curb changes: from flush, pavement markings A combination of strategies is more effective for reducing speed. Figures

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm202speedmgmt.pdf?sfvrsn=11708183_1

2024FDM214Drwys

, • crossovers, • sidewalks, • curb cut ramps, • signing, • pavement marking, • required, a driveway, as illustrated in Figure 214.3.1 . Additional pavement adjacent to the travel lane (e.g., require documented site-specific study and design. Consider providing pavement markings to guide, movements are difficult because of the skew. Additional pavement may be necessary to accommodate, channelization. (5) Increased open pavement areas of highly skewed driveways increase construction

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm214drwys.pdf?sfvrsn=350e07ad_1

D5-01-04-24BSN

,STANDARD- CONCRETE SURFACES, WHITE, SOLID,6" GM 0.080 0706- 1- 3 RAISED PAVEMENT MARKER, TYPE B EA 50.000 0710- 90- PAINTED PAVEMENT MARKINGS, FINAL SURFACE (44985615201) LS 1.000 0711- 16-101, - 1- MAINTENANCE OF TRAFFIC (44316915201) LS 1.000 0102- 2-200 SPECIAL DETOUR- TEMPORARY PAVEMENT, WARNING ARROW PANEL ED 150.000 0102- 78- 1 TEMPORARY RAISED/RETROREFLECTIVE PAVEMENT MARKER, TYPE D, ASPHALT PAVEMENT, 3 1/2" AVG DEPTH SY 25,097.000 0327- 70- 6 MILLING EXISTING ASPHALT PAVEMENT, 1 1/2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2024/jan04/d5-01-04-24bsn.pdf?sfvrsn=f2f69240_1

TP-03-12-24BSN-30Day

PAVEMENT (44206215201) LS 1.000 0102- 14- TRAFFIC CONTROL OFFICER HR 740.000 0102- 60- WORK ZONE, PAVEMENT, 3" AVG DEPTH SY 690.000 0327- 70- 6 MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH SY 113,220.000 0327- 70- 11 MILLING EXISTING ASPHALT PAVEMENT, 2 1/4" AVG DEPTH SY 195,136.000 0327- 70- 19 MILLING EXISTING ASPHALT PAVEMENT, 3/4" AVG DEPTH SY 4,857.000 0334- 1- 13 SUPERPAVE, - 22 TN 2,081.200 0339- 1- MISCELLANEOUS ASPHALT PAVEMENT TN 291.300 0425- 1-503 INLETS, DT BOT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/mar12/tp-03-12-24bsn-30day.pdf?sfvrsn=1958f784_1

449683-1 Coconut Sidewalk_SCOPE CONCEPT LRE_FINAL_2024-0124 LT

., Traffic A (total of 147 tons) o Install asphalt pavement for proposed asphalt sidewalk, post signs (total of 2 assemblies) Pavement Markings are as follows:  Install 12-in wide, of existing thermoplastic pavement marking (total of 148 square feet) o Remove thermoplastic pavement markings at the existing mid-block crossing. Lighting Scope Items: Lighting currently exists, : Obtain 3D Design Survey, collecting data from the north edge of pavement to the north ROW line. Also

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25112/449683-1-coconut-sidewalk_scope-concept-lre_final_2024-0124-lt.pdf?sfvrsn=313d9917_1

451026-1-Stage I Ad

................................................................................... 41 19 SIGNING AND PAVEMENT MARKING ANALYSIS, AND PAVEMENT MARKING PLANS, - Miscellaneous Structures o 7.3 - Signalization o 7.1 - Signing, Pavement Marking, [You need to include a description of the 2 typicals here Pavement Designs: Number of Pavement Designs: One Pavement Type Selection Report(s): N/A Cross-Slope Correction: TBD per consultant

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25111/451026-1-stage-i-ad.pdf?sfvrsn=eab6f40e_1

2025FDM214Drwys

, • signing, • pavement markings, • required signalization, • maintenance of traffic, or • other, to enter or exit a driveway, as illustrated in Figure 214.3.1 . Additional pavement adjacent, require documented site-specific study and design. Consider providing pavement markings to guide drivers, because of the skew. Additional pavement may be necessary to accommodate the turning of large, . (5) Increased open pavement areas of highly-skewed driveways increase construction and maintenance

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm214drwys.pdf?sfvrsn=7eb2644a_3

2023 Florida Greenbook Summary of Changes

2023 Florida Greenbook 2023 Florida Greenbook, Slide 28 Chapter 5 – Pavement Design, through pavement markings, color or other treatment Roadway Design Office Summary of Changes - Draft, 2023 Florida Greenbook, Slide 53 • Pavement Markings – When the installation of pavement markings, , or a Two Reactive Component material for the final pavement markings. • Longitudinal A udible Vibratory, – Pervious Strips – Street Trees – Pervious Pavers/Permeable Pavement Chapter 20 – Drainage

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/floridagreenbook/2023-florida-greenbook-summary-of-changes.pdf?sfvrsn=997cc064_3

D5-11-05-24BSN

), pavement markings (detectable warnings, painted, thermoplastic, RPM), signing (single-column, multi, EXISTING ASPHALT PAVEMENT, 3 1/2" AVG DEPTH SY 9,064.000 0327- 70- 3 MILLING EXISTING ASPHALT PAVEMENT, 4 1/2" AVG DEPTH SY 10,822.000 0327- 70- 5 MILLING EXISTING ASPHALT PAVEMENT, 2" AVG DEPTH SY 5,918.000 0327- 70- 6 MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH SY 321,374.000 0334- 1- 13, , FC-12.5, PG 76 -22 TN 30,088.900 0339- 1- MISCELLANEOUS ASPHALT PAVEMENT TN 42.800 0425- 1-501

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2024/nov05/d5-11-05-24bsn.pdf?sfvrsn=2f35f61a_1

rdb14-17

and the edge of pavement. For RRR projects, the distribution of available roadway width may, Bicycle Lane should not exceed 7 feet in width. For RRR projects, any additional pavement width, a guardrail or other barrier exists and the roadway pavement is continuous to the face of the barrier, has been delineated by edge line striping, and may include bicycle lane pavement markings or signing, and associated pavement marking treatments. As a result, the opportunity exists to jointly implement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/bulletin/rdb14-17.pdf?sfvrsn=edd9e082_1

2025FDM214Drwys

and structures, • crossovers, • sidewalks, • curb cut ramps, • signing, • pavement markings, pavement adjacent to the travel lane (e.g., on- street parking, bike lane, bus bay) will result, and design. Consider providing pavement markings to guide drivers exiting or entering a driveway. 214.3.3, . Additional pavement may be necessary to accommodate the turning of large trucks. (4) Turning, pavement areas of highly-skewed d riveways increase construction and maintenance costs. 214.3.4

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm214drwys.pdf?sfvrsn=d69b7eb7_1

2025FDM124QC

Package Luke S. Walker, PE Dep Abillaba, PE Pavement Design Pavement Design Package Luke S. Walker, Luke S. Walker, PE Dep Abillaba, PE Signing & Pavement Marking (EOR: Tara Full, PE) Signing, , Pavement Design Package, Specifications Package, Plans (all phase submittals), Lighting, that the BIM reflects the data contained in project reports (e.g., Typical Section Package, Pavement, landscaping provide required sight distance for sideroads and driveways? • Does the roadway pavement cross

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm124qc.pdf?sfvrsn=84b8208_1

MANATEE COUNTY DTWP FY 26-30

HARBOR PARKWAY TO E OF LORRAINE RD Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Fund Code 2026, TO SR 64 Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Fund Code 2026 2027 2028 2029 2030, $1,459,926 452623-1 - SR 70 FROM W OF 87TH ST TO E OF LAKEWOOD RANCH BLVD Type of Work: PAVEMENT, Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Fund Code 2026 2027 2028 2029 2030 Construction, TO WEST OF 162ND STREET EAST Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Fund Code 2026 2027

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/dtwp-district-1-26-30/manatee-county-dtwp-fy-26-30.pdf?sfvrsn=3bcbe36d_1

D5-02-04-25BSN

/DRIVEWAY BASE- OPTIONAL MATERIALS SY 288.000 0327- 70- 6 MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH SY 12,295.000 0327- 70- 8 MILLING EXISTING ASPHALT PAVEMENT, 2 1/2" AVG DEPTH SY 62,945.000, Description Unit Quantity 0327- 70- 11 MILLING EXISTING ASPHALT PAVEMENT, 2 1/4" AVG DEPTH SY 91,366.000 0327- 70- 19 MILLING EXISTING ASPHALT PAVEMENT, 3/4" AVG DEPTH SY 731.000 0327- 70- 22 MILLING EXISTING ASPHALT PAVEMENT, 4 1/4" AVG DEPTH SY 51,789.000 0334- 1- 13 SUPERPAVE ASPHALTIC CONC

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2025/feb4/d5-02-04-25bsn.pdf?sfvrsn=5e42f4de_4

D4-03-07-25BSN

PAVEMENT TN 1.000 0425- 4- INLETS, ADJUST EA 6.000 0425- 5- MANHOLE, ADJUST EA 6.000 0425- 15- 41, SHOULDER, UP TO 24" BEYOND PAVEMENT LF 500,000.000 Page 9 Bid Solicitation Notice - Proposal Item, of retro-reflective pavement markers on State roadways in Martin, St. Lucie, and Indian River Counties, PAVEMENT STRIPING (LARGE MACHINE) (LM) 0711- 11-102 THERMOPLASTIC, STANDARD, WHITE, SOLID, 8, EXISTING THERMOPLASTIC PAVEMENT MARKINGS- SURFACE TO REMAIN SF 3,000.000 0713-103-101 PERMANENT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2025/mar07/d4-03-07-25bsn.pdf?sfvrsn=52584af_1

TP-06-10-25BSN

(41821455201) LS 1.000 0102- 2-200 SPECIAL DETOUR- TEMPORARY PAVEMENT (41592745201) LS 1.000 0102- 2-200 SPECIAL DETOUR- TEMPORARY PAVEMENT (41821455201) LS 1.000 0102- 2-300 SPECIAL DETOUR, EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH SY 42,149.000 0327- 70- 11 MILLING EXISTING ASPHALT PAVEMENT, 2 1/4" AVG DEPTH SY 300,615.000 0327- 70-107 MILLING EXIST ASPHALT PAVEMENT AND LIMEROCK 5.25" SY, ASPHALT PAVEMENT TN 1,613.200 0400- 0- 11 CONCRETE CLASS NS, GRAVITY WALL INDEX 400-011 CY 27.800 0425

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/jun10/tp-06-10-25bsn.pdf?sfvrsn=bedb2129_1

3000000.FHWA

on previously prepared bases and on existing pavement surfaces. 300-2 Materials. 300-2.1 Prime Coat, Asphalt Layers 0.030.04 minimum Milled Surface or Oxidized and Cracked Pavement 0.060.07 Concrete Pavement 0.080.09 Open Graded Friction Course Newly Constructed Asphalt Layers 0.050.06 Milled, pavement surfaces. 300-2 Materials. 300-2.1 Prime Coat: For prime coat, use a product listed, Pavement 0.07 Concrete Pavement 0.09 OpenGradedFrictionCourse NewlyConstructedAsphaltLayers 0.06

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/fhwa/3000000.fhwa.pdf?sfvrsn=79e920e1_0

0090103LS.FHWA

of the roadway pavement is acceptable to remain in place at full pay, remain in place at reduced pay or corrected at no cost to the Department. Final disposition of the finished roadway pavement, pavement is ± 5%. Reductions in pay will be determined per sublot by applying a proportional reduction, of the roadway pavement is acceptable to remain in place at full pay, remain in place at reduced pay or corrected at no cost to the Department. Final disposition of the finished roadway pavement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/fhwa/0090103ls.fhwa.pdf?sfvrsn=96e8acd0_0

0090103LS.FHWA

pavement is acceptable to remain in place at full pay, remain in place at reduced pay or corrected at no cost to the Department. Final disposition of the finished roadway pavement will be based, FC-5). The acceptable tolerance of the combined spread rate evaluation of the roadway pavement, of the roadway pavement is acceptable to remain in place at full pay, remain in place at reduced pay, . the Department. Final disposition of the finished roadway pavement will be based upon the comparison between

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/fhwa/0090103ls.fhwa.pdf?sfvrsn=acc6d454_0

9930000.FHWA

traffic and of such length to generally provide a height of 48 inches above the pavement surface, inches above the pavement surface and have a minimum dimension of 2 inches. 993-2.5.2 Post Base, be mechanically anchored to the pavement and be capable of withstanding fifty vehicle impacts without damage, and of such length to generally provide a height of 48 inches above the pavement surface. 993-2.2.2, Dimensions: The delineator shall have a minimum height of 48 inches above the pavement surface and have

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/fhwa/9930000.fhwa.pdf?sfvrsn=d2b9abc3_0
20 of 7243 results