7243 search results for Pavement

PCH-04 Traffic Control Products with Required APL Listing and Product Retention

Warning Sign Highlighted Sign Internally Illuminated Sign Sign Beacon 706 Raised Pavement Markers, Retention 4-5 Official Traffic Control Signals and Devices Ancillary Devices Raised Pavement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/traf_sys/procedural-docs-2022/pch-04-traffic-control-products-with-required-apl-listing-and-product-retention.pdf?sfvrsn=133771ed_1

522-002FHWAReviewPkg

than 5%, align the 5 feet from the back of the curb or edge of pavement. minimum depth of 2 feet, in the Plans on slopes greater than 5%, align the 5 feet from the back of the curb or edge of pavement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/522-002fhwareviewpkg.pdf?sfvrsn=546ace34_1

MPO Requirements Fact Sheet (Feb23)

establish various performance measures to assess highway safety (PM1), bridge and pavement condition, PM2 BRIDGE AND PAVEMENT P M 3 SYSTEM PERFORMANCE AND FREIGHT MOVEMENT TRANSIT ASSET

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/fto/pdis-documents/mpo-requirements-fact-sheet-(feb23).pdf?sfvrsn=8d18ad29_4

521-513

of the Barrier/Noise Wall. See Section B-B 7. FILL REQUIREMENTS: Shoulder or Roadway Pavement, Devices Pavement Shoulder Roadway or (See Note 2) Bars 5B (Typ.) V a r i e s S l o p e

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/idx/521-513.pdf?sfvrsn=ba43d76b_1

550-011

 1 0 / 6 / 2 0 2 5 3 : 2 5 : 4 7 P M R E V I S I O N DESCRIPTION: REVISION LAST of STANDARD PLANS FY 2026-27 SHEET INDEX BRIDGE FENCING ON PARAPET (CURVED TOP) 11/01/23 1 3 550-011 Shown, Rigid Pavement Approach Slab Similar) Approach Slab (Flexible Pavement Approach Slab or Raised Sidewalk Bridge Deck (shown) Centers (Typ.) Ties @ 1'-0" Centers) (Typ.) @ 1'-3" Maximum Bar ~ Space Equally required per Tension Tension Bands (5 or Loop Cap (Typ

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/idx/550-011.pdf?sfvrsn=b8712c6c_1

508-T01

of sign will vary with condition at job site. pavement. Horizontal distance between edge of the pavement Measured from the bottom of the sign to the near edge of the * 7 ' * 1'-6" SIGNAL HEAD

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/idx/508-t01.pdf?sfvrsn=80b567b_1

522-002FHWAApproved

than 5%, align the 5 feet from the back of the curb or edge of pavement. minimum depth of 2 feet, in the Plans on slopes greater than 5%, align the 5 feet from the back of the curb or edge of pavement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/522-002fhwaapproved.pdf?sfvrsn=38f68530_1

2026FDM925RdwyXSections

) Show existing ground lines. (4) Show below-ground portions of existing features, e.g., pavement, : (a) Profile grade elevation(s) (b) Special ditch elevations (c) Pavement and sidewalk cross

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm925rdwyxsections.pdf?sfvrsn=b63cbd4c_2

Richard_Nasrawy_CV_2025

) featuring bridge construction, pavement widening, drainage improvements, lighting, ITS, resurfacing, widening, signing, pedestrian signal, and pavement marking projects on SR 500, SR 501, SR

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/constadm/drb/resume/richard_nasrawy_cv_2025.pdf?sfvrsn=f43c28aa_1

Hendry Draft Tentative WP_FY27-31

: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2027 2028 2029 2030 2031 Construction State, 453786-1 - AIRGLADES AIRPORT REHAB PARALLEL TAXIWAY PAVEMENT AND LIGHTING Type of Work: AVIATION

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/district-1-dtwp-fy-27-31/hendry-draft-tentative-wp_fy27-31.pdf?sfvrsn=7ccacb6d_1

E59F8BidTabs

and/or modifying traffic signalization infrastructure, signing and pavement markings, pedestrian signal, 76.00000 7,600.00 0065 0339 1 MISCELLANEOUS ASPHALT PAVEMENT 6.000 TN 3,849.00000 23,094.00

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/bid-tabs/2025/oct07/e59f8bidtabs.pdf?sfvrsn=b7c42704_1

2026FDM910KeySignature

of the Contract Plans Set, e.g., Roadway Plans, Signing and Pavement Marking Plans, Structures, and Pavement Marking (3) Signalization (4) Intelligent Transportation S ystems (5) Lighting (6, AND PAVEMENT MARKING ROADWAY DEVELOPMENTAL STANDARD PLANS (DSPs): are contained in a separate digitally, SIGNING AND PAVEMENT MARKING ROADWAY DEVELOPMENTAL STANDARD PLANS (DSPs): are contained, TRANSPORTATION SYSTEMS SIGNALIZATION SIGNING AND PAVEMENT MARKING ROADWAY 13 REPORT OF CORE BORINGS

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm910keysignature.pdf?sfvrsn=3a64d931_9

TP-01-13-26FuelAllocation

PAVEMENT 0.0000 2.4685 1,675.000 0.000 4,134.738 43578635201 JOB TOTAL: 0.000 989,103.680 (*) Indicates, 86.200 0.000 232.835 0339- 1- TN MISCELLANEOUS ASPHALT PAVEMENT 0.0000 2.4685 1,944.800 0.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2026/jan13/tp-01-13-26fuelallocation.pdf?sfvrsn=330dee8c_9

E1Y20-R0BidTabs

14,000.00 0085 E577 71 BLADING PAVED SHOULDER, UP TO 24" BEYOND PAVEMENT 58,000.000 LF 1.00000, 15,505.00 0085 E577 71 BLADING PAVED SHOULDER, UP TO 24" BEYOND PAVEMENT 58,000.000 LF 1.05000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/bidtabs/2025/dec04/e1y20-r0bidtabs.pdf?sfvrsn=bf781002_1

2023FDM214Drwys

, • crossovers, • sidewalks, • curb cut ramps, • signing, • pavement marking, • required, . Additional pavement adjacent to the travel lane (e.g., on- street parking, bike lane, bus bay, study and design. Consider providing pavement markings to guide drivers exiting or entering, . Additional pavement may be necessary to accommodate the turning of large trucks. (4) Turning, pavement areas of highly skewed driveways increase construction and maintenance costs. 214.3.4

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2023/2023fdm214drwys.pdf?sfvrsn=c67ac9ec_1

D3-10-12-23BSN

Signing 0706- 1- 3 RAISED PAVEMENT MARKER, TYPE B EA 7,724.000 0918-712-100 INTEGRATED MULTI-POLYMER PAVEMENT MARKINGS, WHITE, SOLID 6" GM 7.314 0918-712-110 INTEGRATED MULTI-POLYMER PAVEMENT, this Work Document-driven Contract consists of the removal and replacement of Raised Pavement Markers, Item Description Unit Quantity Section 0001 RAISED PAVEMENT MARKER REPLACEMENT (EA) 0102- 14- TRAFFIC CONTROL OFFICER HR 40.000 E706- 1- 42 REFLECTIVE PAVEMENT MARKER(REMOVE AND REPLACE)(CLASS B

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2023/oct12/d3-10-12-23bsn.pdf?sfvrsn=94635ff8_1

D6-10-26-23BSN

ARROW PANEL ED 400.000 0102- 78- 1 TEMPORARY RAISED/RETROREFLECTIVE PAVEMENT MARKER, TYPE D EA, MILLING EXISTING ASPHALT PAVEMENT, 1" AVG DEPTH SY 7,000.000 0327- 70- 5 MILLING EXISTING ASPHALT PAVEMENT, 2" AVG DEPTH SY 3,000.000 0327- 70- 6 MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH SY 5,000.000 0327- 70- 12 MILLING EXISTING ASPHALT PAVEMENT, 1 1/4" AVG DEPTH SY 2,000.000 0334, - MISCELLANEOUS ASPHALT PAVEMENT TN 300.000 0400- 0- 11 CONCRETE CLASS NS, GRAVITY WALL INDEX 400-011 CY

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/lettings/2023/oct26/d6-10-26-23bsn.pdf?sfvrsn=fc2a8b4e_1

2024FDM214Drwys

, • crossovers, • sidewalks, • curb cut ramps, • signing, • pavement marking, • required, , as illustrated in Figure 214.3.1 . Additional pavement adjacent to the travel lane (e.g., study and design. Consider providing pavement markings to guide drivers exiting or entering, Manual 214 - Driveways (3) Turning movements are difficult because of the skew. Additional pavement, may be confusing and require additional channelization. (5) Increased open pavement areas of highly

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm214drwys.pdf?sfvrsn=e86cb8c8_1

2024FDM202SpeedMgmt

. 202.3.10 Posted Speed Pavement Marking Posted Speed markings placed directly on the pavement, ). Coordinate with the District Traffic Operations Engineer on the use of Posted Speed pavement marking, warning signs such as “Reduced Speed Ahead” signs, or gateways signs where appropriate. • Pavement, may be placed on the pavement. • Curb changes: from flush paved shoulders to curbed roadway, speed feedback signs • Posted Speed pavement markings A combination of strategies is more

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm202speedmgmt.pdf?sfvrsn=a525c669_1

9-2023_Fall Construction Academy_Concrete and Structural Materials

Concrete (SS 346 - 350) Ta rget Slump 3 in (general) 1.5 in (slip-formed pavement) To l erance, Concrete Conventional Concrete Conventional Concrete Class I (Pavement) f’c = 3,000 psi (SS 350 – MM, (Pavement) (SS 400-16.2) (SS 400-16) Sampling and Te sting Plastic Properties Slump Air Content, Concrete Products Section 9.2 Concrete Production Section 9.3 Concrete Pavement Production Facility Guide, Pavement and Concrete Structures (SS 931) Strand for Prestressing (Post-Te n sioning) Steel Bars

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2023-construction-academy/fall-2023/9-2023_fall-construction-academy_concrete-and-structural-materials.pdf?sfvrsn=c2410c3_1
20 of 7243 results