13214 search results for DESIGN

First Responder

for this project. Signal Siren is a software-based Emergency Vehicle Preemption (EVP) solution designed

https://www.fdot.gov/traffic/teo-divisions.shtm/cav-ml-stamp/cv/maplocations/first-responder

FDOT Public Railroad-Highway Grade Crossings - Opening and Closure

of statewide application designed to ensure the proper maintenance, safety, revitalization, and expansion

https://www.fdot.gov/rail/programs/opening-closure

635-001

away from the box. 1. Provide fiber optic splice boxes with cable hanger racks designed to support

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/idx/635-001.pdf?sfvrsn=91413029_1

certification-request-form---rev-09_21

M E M O R A N D U M DATE: TO: Carlos Martinez, District Right of Way Manager ATTN: Technical Services Unit (TSU) FROM: CC: SUBJECT: REQUEST FOR R/W CERTIFICATION LETTING DATE: FM Number: Federal Aid Number: ☐ State Road ☐County Road ☐City Road Road Number: Road Name: County: Description: Work Mix: The above referenced project has been designed to utilize only existing right of way. I have

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/project-management/districts/d4/certification-request-form---rev-09_21.docx?sfvrsn=38932086_1

Materials Contract Documents

)The document is intended as reference guide that is designed to accomplish the following goals

https://www.fdot.gov/materials/contract/index.shtm

SP4550000DB 7-20

 STRUCTURES FOUNDATIONS (DESIGN BUILD). (REV 1-7-20) (FA 1-21-20) (7-20) SECTION 455 is deleted, District Materials Office or designated storage location. 455-1.1 Monitor Existing Structures, for construction of the caps. 4550000DB Design Build Jobs When shown in the Plans, provide permanent, cofferdams are not detailed in the Plans, employ a qualified Specialty Engineer to design cofferdams, and to sign and seal the plans and specification requirements. Send the designs to the Engineer for his

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/design-build/sp4550000db-7-20.pdf?sfvrsn=5b0af588_5

4550510.impl

designated in the Plans or authorized by the Engineer. Install instruments prior to driving and assist, in accordance with Design Standards, Index No. 20602 or attach instruments (strain transducers, Testing specified in the Structure Design Guidelines. SUBARTICLE 455-15.8.3 (Page569 – 570, an approved sampling tool designed to sample over a depth range of 12 inches or less. Take whatever, and documented. 6.Requiredsubmittals, including shop drawings and concrete grout design mixes

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/implemented/4550510.impl.pdf?sfvrsn=de9831e5_0

Specrev2-July14

Byron, Chief Engineer FROM: Duane Brautigam, Director, Office of Design David Sadler, Director, Office, Director, Office of Design Date David Sadler signature on file __ 3-19-14 Director, Office, and Estimates Office Duane Brautigam, Director, Office of Design David Sadler, Director, Office, and maintain temporary traffic control devices as detailed in the Plans, Index 600 of the Design, and Design Standards, Index No. 600. Use signs that meet the material and process requirements of Section

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/comments-responses/specrev2-july14.pdf?sfvrsn=8f613a64_0

Professional Services (24649)

Letting Date:10/02/2023 FM 41806423201 Description: Assist the District 6 ADA Coordinator by providing professional/technical personnel to perform supportive services to ensure ADA compliance in Miami-Dade and Monroe Counties Estimate: $1,500,000.00 Major: 3.1— Minor Highway Design 6.1— Traffic Engineering Studies Minor: 6.2— Traffic Signal Timing 7.1— Signing, Pavement Marking & Channelization 7.2— Lighting 7.3— Signalization 8.2— Design, Right of Way, Construction Surveying 8.4— Right

SPI-458-100

Seal FY 2024-25 1 Index 458-100 Expansion Joint System - Strip Seal Design Criteria AASHTO LRFD Bridge Design Specifications; Structures Design Guidelines (SDG) Design Assumptions and Limitations, FDM 115 for more information regarding use of Data Tables. Instructions: 1. Total Design Movement, and a total design movement up to 3 inches. Set Dimension A to account for skews or greater design movements while meeting the design limitations below: a. the minimum factored joint opening in the Direction

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-458-100.pdf?sfvrsn=81af435c_1

SPI-458-110

Rod Design Criteria AASHTO LRFD Bridge Design Specifications; Structures Design Guidelines (SDG) Design Assumptions and Limitations Use Index 458-110 in accordance with the requirements of SDG, Tables. Instructions: 1. Total Design Movement is the absolute value of the total factored, -skewed joints. Set Dimension A to account for skews or smaller design movements while meeting the design limitations below: a. The design joint opening should be equal or greater than twice

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-458-110.pdf?sfvrsn=e8d0acc2_1

SPI-458-100

Seal FY 2024-25 1 Index 458-100 Expansion Joint System - Strip Seal Design Criteria AASHTO LRFD Bridge Design Specifications; Structures Design Guidelines (SDG) Design Assumptions and Limitations, FDM 115 for more information regarding use of Data Tables. Instructions: 1. Total Design Movement, and a total design movement up to 3 inches. Set Dimension A to account for skews or greater design movements while meeting the design limitations below: a. the minimum factored joint opening in the Direction

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-458-1004eb2f7fc-2f2f-4510-87fb-c0bda6fbfeb9.pdf?sfvrsn=e3cc7a38_1

Ch6CooridorChp7CrossSectionView

 FDOTSS3 Design and 3D Modeling Chapters 6 and 7 Basic Corridor Models and Open Cross Section View Vern E. Danforth, P.E. Engineering/CADD System Support January 28, 2015 Session Overview  Basic Corridor Model - Create Corridor (New Construction Template SR61) - Setting Parametric Constraint Label for Variable Median - Add Corridor References - Add Corridor Point Controls for Independent PGL - Add Key Stations - Corridor Design Stages - Review Corridor Objects  Open Cross

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cadd/downloads/webinars/files/microstation/ch6cooridorchp7crosssectionview_9bbeb9b9-9ad6-4efe-bd8c-b3a3a6b5b56e.pdf?sfvrsn=f5baf176_0

SPI-458-110

Rod Design Criteria AASHTO LRFD Bridge Design Specifications; Structures Design Guidelines (SDG) Design Assumptions and Limitations Use Index 458-110 in accordance with the requirements of SDG, Tables. Instructions: 1. Total Design Movement is the absolute value of the total factored, -skewed joints. Set Dimension A to account for skews or smaller design movements while meeting the design limitations below: a. The design joint opening should be equal or greater than twice

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/spi/spi-458-110.pdf?sfvrsn=51f768d2_1

SPI-458-100

Seal FY 2025-26 1 Index 458-100 Expansion Joint System - Strip Seal Design Criteria AASHTO LRFD Bridge Design Specifications; Structures Design Guidelines (SDG) Design Assumptions and Limitations, FDM 115 for more information regarding use of Data Tables. Instructions: 1. Total Design Movement, and a total design movement up to 3 inches. Set Dimension A to account for skews or greater design movements while meeting the design limitations below: a. the minimum factored joint opening in the Direction

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/spi/spi-458-100.pdf?sfvrsn=1f3d7d55_1

Scope of Services and Staff Hour Estimation

) services, Design services, and combined PD&E/Design services and guidelines for negotiating staff hours, . The Guidelines consist of the Scope of Services files (MS Word documents created through the Design, Managers when scoping and negotiating all consultant contracts for PD&E and Design Services according, Design Design Scope of Services Tool - (Updated September 2023) This online tool assists scope, design activities. Click this link, https://www.fla-etat.org/est/swept/dsos/Landing.do to access

https://www.fdot.gov/designsupport/scope/default.shtm
20 of 13214 results