13214 search results for DESIGN

SP5360100

 GUARDRAIL. (REV 2-22-17) (7-17) ARTICLE 536-1 is expanded by the following: Remove, repair or replace damaged or destroyed sections of guardrail in accordance with the Contract Documents and the Design Standards. The work may include realigning of panels, posts, blocks and anchorages, and miscellaneous hardware. ARTICLE 536-2 is expanded by the following new Subarticles: 536-2.1, and unload all salvageable materials at locations designated by the Engineer. Provide location

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/maintenance/finalized/sp5360100.pdf?sfvrsn=12d1c4cb_1

SP5360100

 GUARDRAIL. (REV 7-29-16) (1-17) ARTICLE 536-1 is expanded by the following: Remove, repair or replace damaged or destroyed sections of guardrail in accordance with the Contract Documents and the Design Standards. The work may include realigning of panels, posts, blocks and anchorages, and miscellaneous hardware. ARTICLE 536-2 is expanded by the following new Subarticles: 536-2.8, and unload all salvageable materials at locations designated by the Engineer. Provide location

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/january-2017/maintenance/finalized/sp5360100.pdf?sfvrsn=cdd9ebb3_2

1020000.origind

/Subarticles: Telephone: email: Will the proposed revision involve Design Standard Index changes? Yes No Roadway Design staff contacted (name): Structures Design staff contacted (name): Will the proposed revision involve PPM changes? Yes No Roadway Design staff contacted (name, ): Will this revision necessitate any of the following: Design Bulletin Construction Bulletin Estimates Bulletin, the requirements of Section 990, Section 994, Design Standards Plans and the Manual on Uniform Traffic Control

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/internal/1020000.origind.pdf?sfvrsn=4a9fdaf9_0

fdot-bdv31-977-121-rpt

plate to pole connection in FDOT Design Index #715-010 that was used in this work to design the steel, Design Index #700-040 that was used in this work to design the steel plate-to-plate weld joint [36, Design Index #715-002 that was used in this work for the Al cast plate-to-extruded pipe weld joint, in FDOT Design Index #715-002 that was used in this work for the extruded Al plate-to-plate weld

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bdv31-977-121-rpt.pdf?sfvrsn=3dd9bff6_1

SEF (4-4-2024)

by being entirely designated as a Foreign Trade Zone. As a result of the connectivity, a m e n i t i e, Designated as a Foreign Trade Zone Adjacent to Sebring International Raceway Multimodal Hub

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fasp-2043---airport-profiles/sef-(4-4-2024).pdf?sfvrsn=776eeffa_1

NEVI Formula Program

of electric vehicle charging stations along designated Alternative Fuel Corridors. To access, charging infrastructure must meet the following requirements: Located along a designated Alternative Fuel

https://www.fdot.gov/planning/policy/ev/nevi-formula-program

SPM4250600-724-i19202

included in the measurement designated to be paid for under the items for the grading work, in the proposal, price and payment will be full compensation for the number of such structures designated

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/maintenance/finalized/spm4250600-724-i19202.pdf?sfvrsn=cac27056_1

SPM4250600-725-i19885

included in the measurement designated to be paid for under the items for the grading work, in the proposal, price and payment will be full compensation for the number of such structures designated

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/maintenance/finalized/spm4250600-725-i19885.pdf?sfvrsn=c8c54e28_1

SPM4250600-723-i18580

included in the measurement designated to be paid for under the items for the grading work on the project, in the proposal, price and payment will be full compensation for the number of such structures designated

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/maintenance/finalized/spm4250600-723-i18580.pdf?sfvrsn=bda9945c_2

SPM4250600-122

in the measurement designated to be paid for under the items for the grading work on the project, all, , price and payment will be full compensation for the number of such structures designated to be paid

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/maintenance/finalized/spm4250600-122.pdf?sfvrsn=5416f71d_2

SPM4250600-722

in the measurement designated to be paid for under the items for the grading work on the project, all, , price and payment will be full compensation for the number of such structures designated to be paid

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/maintenance/finalized/spm4250600-722.pdf?sfvrsn=a152476a_2

SPM4250600-721

in the measurement designated to be paid for under the items for the grading work on the project, all, , price and payment will be full compensation for the number of such structures designated to be paid

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/maintenance/finalized/spm4250600-721.pdf?sfvrsn=e5b71468_2

SP4250600

except the volume included in the measurement designated to be paid for under the items, of such structures designated to be paid for under separate items, and which are satisfactorily adjusted

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/maintenance/finalized/sp4250600.docx?sfvrsn=c57ac299_2

1600405-722FHWA

designated by the State Materials Office will perform Resolution testing. The material, . The State Materials Office or an AASHTO accredited laboratory designated by the State Materials

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/fhwa/1600405-722fhwa.pdf?sfvrsn=6f02bacc_2

7111000.FHWA

and dotted lines. The gross mile measurement will not include designated unmarked lengths at intersections, measurement will not include designated unmarked lengths at intersections, turn lanes, etc. Final

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/fhwa/7111000.fhwa.pdf?sfvrsn=ad089817_0

1201002.FHWA

accredited laboratory designated by the SMO will perform Resolution testing. The material, the soil type in question. The State Materials Office (SMO) or an AASHTO accredited laboratory designated

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/fhwa/1201002.fhwa.pdf?sfvrsn=d66bebfd_0

9210200.impl

the supplier has more than one manufacturing facility, the source of supply may be designated, and shall be identified as representing a designated LOT of cement. SUBARTICLE 921-5.2 is deleted

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/implemented/9210200.impl.pdf?sfvrsn=8e110b29_0

SP4440000

below the estimated pumping level, with sufficient power and capacity to achieve the designated, are subject to approval by the Engineer. Maintain the discharge within ±5% of the designated specific

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2007/january-2007/workbook/sp4440000.pdf?sfvrsn=cf62d095_0

SP4440000

below the estimated pumping level, with sufficient power and capacity to achieve the designated, are subject to approval by the Engineer. Maintain the discharge within ±5% of the designated specific

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2009/january-2009/workbook/sp4440000.pdf?sfvrsn=afb9f8d1_0

SP4440000

the designated discharge rates. Measure the discharge with an accurate totalizing meter and stopwatch, of which are subject to approval by the Engineer. Maintain the discharge within ±5% of the designated

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/sp4440000.pdf?sfvrsn=6979fb8b_0
20 of 13214 results