9204 search results for test
9700000.resp
test reports from the National Transportation Product Evaluation Program (NTPEP) showing, performance test reports from the National Transportation Product Evaluation Program (NTPEP
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/comments-responses/9700000.resp.pdf?sfvrsn=c5f6f12_0D9430001.do
on to maintain a tight joint. Test pipe joints at the plant hydrostatically using test methods in ASTM D
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2003/january-2003/workbook/d9430001.do.pdf?sfvrsn=311a2d44_0D9450001.do
be the sole element relied on to maintain a tight joint. Test pipe joints at the plant hydrostatically using test methods in ASTM D 3212 [ASTM D 3212M]. Soil tight joints must be watertight to 2 psi
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2003/january-2003/workbook/d9450001.do.pdf?sfvrsn=4822cb2d_03460202.resp
" or revise the test to 0.0 to 6.0%. Response: Change Made 346-3.2 Drilled Shaft Concrete: "Ambient, acceptance strength test result falls more than 500 psi below the specified minimum strength, furnish, not be representative for these conditions. We would be asking to perform slump test at 85o F when the pouring, temperature ranges used for slump loss test and not the actual ambient temperature of the slump loss test. Should the placement take place at 70°F then the slump loss test should take place
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/comments-responses/3460202.resp.pdf?sfvrsn=17d93b6c_03460202.comm
" or revise the test to 0.0 to 6.0% 346-3.2 Drilled Shaft Concrete: "Ambient temperature conditions, strength test result falls more than 500 psi below the specified minimum strength, furnish either, for these conditions. We would be asking to perform slump test at 85o F when the pouring will be with actual, for slump loss test and not the actual ambient temperature of the slump loss test. Should the placement take place at 70°F then the slump loss test should take place at the anticipated ambient
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/comments-responses/3460202.comm.pdf?sfvrsn=1550ed15_09900600.comm
on the panel’. 3. . 990-6.1(5) “Prior to approval an impact test shall be performed, will perform an impact test.’ 4. Alternative designs for temporary glare screen may be submitted as a Cost
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/comments-responses/9900600.comm.pdf?sfvrsn=faeb9d2c_09310102.impl
shall be based on the manufacturer’s certified mill analysis certifying that the test results meet, analysis certifying that the test results meet the specification limits of the ASTM designation
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/implemented/9310102.impl.pdf?sfvrsn=4c38b4e2_04580202.comm
4580202 BRIDGE DECK JOINTS COMMENTS FROM INTERNAL/INDUSTRY REVIEW Debbie J. Steiger 716-308-6799 debbie.steiger@basf.com Comment: (10-21-13) Under section 932, the FLDOT specification for Movement Capability calls out the ASTM C719 test method. However, the FLDOT specification calls out a 2 inch wide joint. I think this dimension is in error unless a special test machine is used. It should be a 2 inch long joint (by ½ inch wide) as described in ASTM C719. Response
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/comments-responses/4580202.comm.pdf?sfvrsn=cffb74b5_0Section11.6-062518_1-19WB
reported pencil hardness* or solvent rub test. Perform three pull tests to ensure the area meets 800 PSI (to limit damage, abort test when values reach > 800).Apply IOZ thinned as recommended, inspection/testing of shop applied coatings. 11.6.5 GENERAL INFORMATION These preapproved procedures, conditions. Confirm cure before top-coating or shipping by using rub test or pencil hardness test. If the pencil hardness test is used, consult the coating manufacturer (or Owner's specification
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/materials-manual/section11-6-062518_1-19wb.pdf?sfvrsn=34a51280_1Section11.6-062518_1-19WB
reported pencil hardness* or solvent rub test. Perform three pull tests to ensure the area meets 800 PSI (to limit damage, abort test when values reach > 800).Apply IOZ thinned as recommended, inspection/testing of shop applied coatings. 11.6.5 GENERAL INFORMATION These preapproved procedures, conditions. Confirm cure before top-coating or shipping by using rub test or pencil hardness test. If the pencil hardness test is used, consult the coating manufacturer (or Owner's specification
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/materials-manual/section11-6-062518_1-19wb.pdf?sfvrsn=63768d21_15300201int
an application in accordance with Section 6, and include certified test reports from an independent test, or handling operations not exceeding 5% by weight. Drop Test***(EM 1110-2-2302) No new cracks developed, Soundness is not required for broken concrete. *** The Engineer will waive the Drop Test unless required to ensure structural integrity. Provide all equipment, labor and testing at no expense, Verification tests on all materials placed on the project. 2.The Engineer will check the gradation
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/internal/5300201int.pdf?sfvrsn=1a300878_15300201ind
an application in accordance with Section 6, and include certified test reports from an independent test, or handling operations not exceeding 5% by weight. Drop Test***(EM 1110-2-2302) No new cracks developed, Soundness is not required for broken concrete. *** The Engineer will waive the Drop Test unless required to ensure structural integrity. Provide all equipment, labor and testing at no expense, Verification tests on all materials placed on the project. 2.The Engineer will check the gradation
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/5300201ind.pdf?sfvrsn=cb0e9d70_1RIGHT_OF_WAY_MANUAL_FULL-06032025
value in the market but may have little or no utility or value to the owner. The test is whether
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/rightofway/documents/rowmanual/right_of_way_manual_full_11122024.pdf?sfvrsn=6c515666_77000000SS
strength is at least 2,500 psi [17 MPa]. Determine concrete strength from tests on a minimum of two test cylinders, tested in accordance with Section 346, designs if satisfactorily tested in accordance with the current AASHTO requirements. 700-2.3.3, test reports giving evidence that the base to be used for each pole size is as strong as the pole with which it is to be used. Perform physical tests and submit certified reports for one base
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2006/files/7000000ss.pdf?sfvrsn=8e922ef8_07000000SS
psi [17 MPa]. Determine concrete strength from tests on a minimum of two test cylinders, tested, breakaway designs if satisfactorily tested in accordance with the current AASHTO requirements, alternates the Engineer will allow a cast base, provided the Contractor submits test reports giving, is to be used. Perform physical tests and submit certified reports for one base to be used with each pole size
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2005/files/7000000ss855fad2d35854b69a7530eb1650ec59e.pdf?sfvrsn=b4cc6923_07000000SS
psi [17 MPa]. Determine concrete strength from tests on a minimum of two test cylinders, tested, breakaway designs if satisfactorily tested in accordance with the current AASHTO requirements, alternates the Engineer will allow a cast base, provided the Contractor submits test reports giving, is to be used. Perform physical tests and submit certified reports for one base to be used with each pole size
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2005/files/7000000ss.pdf?sfvrsn=fea946f5_03301200SS
being tested. The Engineer may require additional testing at other locations within the lane, with 330-12.4.5. 330-12.4.2 T e s t M e t h o d : P e r f o r m all straightedge testing in accordance with FM, and the Design Standards Index Nos. 607 or 619 during all testing. When traffic control cannot be provided, . 330-12.4.4 Process Control Testing: Assume full responsibility for controlling all paving operations, and time of all straightedge testing a minimum of 48 hours before beginning testing. 330-12.4.5.2
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2006/files/3301200ss.pdf?sfvrsn=e85f1675_07020400.FHWA
. Conduct field tests in accordance with FM 5-541 and ASTM E 2177 (Bucket Method).Take test readings, (Bucket Method) for wet recovery. The Department reserves the right to test the markings within 3 days of receipt of the Contractor’s certification. The test readings should be representative, on either side of the existing line is visible. Conduct field tests in accordance with FM 5-541 and ASTM E 2177 (Bucket Method).Take test readings representative of the striping performance. Remove
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul11/files/7020400.fhwa.pdf?sfvrsn=69538670_0E1E73-414733-1-I75-PowerDropChange
that all subsystems must be functional before the ITS System Operational Test and that the Contractor, that, had a work order been issued in a timely manner, operational testing could have begun on July, testing could begin. DMS work was not complete until after power was converted at Alico Road. Further, for holding the start of operational testing until the DMS issues were resolved are justified
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/constadm/drb/decision/d1/2010/e1e73-414733-1-i75-powerdropchange.pdf?sfvrsn=30ad9459_2