3593 search results for REPORT NUMBER

MKY

Historical AirportInspection Reports Select a report... Inspection Report 12-11-2024 Inspection Report 10-26-2023 Inspection Report 10-26-2022 Inspection Report 10-14-2021 Inspection Report 09-16-2020 Inspection Report 10-24-2019 Inspection Report 10-10-2018 Inspection Report 11-02-2017 Updated Inspection Report 11-02-2017 Inspection Report 10-26-2016 Inspection Record, and a Statewide Airfield Pavement Management Program Summary Report. The summary reports

https://www.fdot.gov/aviation/airportslist/MKY

X36

Archives Historical AirportInspection Reports Select a report... Inspection Report 12-12-2024 Inspection Report 10-24-2023 Inspection Report 10-27-2022 Inspection Report 10-12-2021 Inspection Report 09-17-2020 Inspection Report 10-22-2019 Inspection Report 10-11-2018 Inspection Report 10-31-2017 Inspection Report 10-27-2016 Inspection Record 10-08-2015 Inspection Record 10-30-2014 Inspection Report 10-24-2013 Updated Inspection Record 10-24-2013 Inspection Record

https://www.fdot.gov/aviation/airportslist/X36

24J

Archives Historical AirportInspection Reports Select a report... Inspection Report 04-23-2025 Inspection Report 04-17-2024 Inspection Report 04-12-2023 Inspection Report 04-20-2022 Inspection Report 04-21-2021 Inspection Report 06-09-2020 Inspection Report 05-01-2019 Inspection Report 04-04-2018 Inspection Report 04-26-2017 Inspection Report 04-22-2016 Inspection Record, Airfield Pavement Management Program Summary Report. The summary reports

https://www.fdot.gov/aviation/airportslist/24J

JAX

AirportInspection Reports Select a report... Inspection Report 05-23-2024 Inspection Report 04-06-2023 Inspection Report 06-08-2022 Inspection Report 06-16-2021 Inspection Report 09-30-2020 Inspection Report 07-10-2019 Inspection Report 06-28-2018 Inspection Report 06-29-2017 Inspection Report, Program Summary Report. The summary reports are intended to provide an overview, . Airport SAPMP Report

https://www.fdot.gov/aviation/airportslist/JAX

TPA

Historical AirportInspection Reports Select a report... Inspection Report 02-13-2025 Inspection Report 02-29-2024 Inspection Report 05-18-2023 Inspection Report 05-27-2022 Inspection Report 05-19-2021 Inspection Report 11-02-2020 Inspection Report 07-19-2019 Inspection Report 07-27-2018 Inspection Report 07-28-2017 Inspection Report 07-29-2016 Inspection Record 08-07-2015 Inspection, 05-16-1986 Inspection Record 09-04-1974 Inspection Record 06-12-1973 Inspection Report 04-03-1969

https://www.fdot.gov/aviation/airportslist/TPA

2024FDM901SeqOfPlans

consistency with the intent and scope of the Project Concept Report (2) Evaluate the impacts of changes, • (Federal Funds) notation, if applicable • County Name and State Road Number • Fiscal Year and sheet number • Consultants name, address, and contract number, if applicable • Department’s, numbers • Label existing water bodies (e.g., lakes, rivers) TEMPORARY TRAFFIC CONTROL PLANS, pay item numbers into Designer Interface for AASHTOWare Project™ Preconstruction and print a PDF

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm901seqofplans.pdf?sfvrsn=adaa26_1

2024FDM901SeqOfPlans

numbers • Flow arrows along proposed ditches • Retention and detention ponds, pond number and area, objectives: (1) Check consistency with the intent and scope of the Project Concept Report (2) Evaluate, , if applicable • County Name and State Road Number • Fiscal Year and sheet number • Consultants name, address, and contract number, if applicable • Department’s Project Manager's Name • List, structures and pipes with relevant information • State, Federal, and county highway numbers

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm901seqofplans.pdf?sfvrsn=473ff1d3_1

D1-11-07-24FuelAllocationReport

Letting Call Number Proposal Project Number Fuel Allocation 01241107 001 E1W84 43607915201 * Y 002, of Transportation Fuel Allocation Report web Trnsport 10/1/2024 2:37:03 PM ESTIMATED FUEL ALLOCATION DETAIL, with the provisions contained in this contract. Florida Department of Transportation Fuel Allocation Report web, . Florida Department of Transportation Fuel Allocation Report web Trnsport 10/1/2024 2:37:03 PM, Report web Trnsport 10/1/2024 2:37:03 PM ESTIMATED FUEL ALLOCATION DETAIL Proposal No.: E1X48-R0

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2024/nov07/d1-11-07-24fuelallocationreport.pdf?sfvrsn=2e32a450_1

rideacceptance

will be sent to this individual. 22. Phone Numbers – enter the cell phone number in the Cell Phone, /Project – begin typing the contract number or Financial Project Id in the field. Either can, Number) that requires laser profiler acceptance needs its own MAC Sample. If the project crosses, instructions. One MAC sample can have more than one FPN (Financial Project Number) but only one, Number or IRI. 6. Pay Item – if desired, you can select the pay item, but it is optional. Do

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/mac/training/matspecific/rideacceptance.pdf?sfvrsn=4319acbd_7

SP5810000-122resp

sections, to address differing site conditions). Add item number 581-3.1.4, “Condition, will note when soil may be amended to meet spec requirements. Is the intent to utilize the numbers provided by the Designer in the plans? You don't want the Contractor adding random handwritten numbers on their one set of plans so it should be clear the Contractor is to utilize the numbers provided, as a bullet number Response: Agree; text added. Spec 987 referenced above. Response: No change

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/comments-responses/sp5810000-122resp.pdf?sfvrsn=1ef3541_2

Urban Community Transportation Coordinator

Performance Report. Please review criteria prior to submittal to ensure that all required, by the CTC in the Annual Operating Report. Criteria: Consideration will be given to each nominee based on documented data presented in the Annual Performance Report, recent Quality Assurance reviews, information from the Annual Performance Report will be reviewed including: increase in trips as a percent, cost per hour (if available). Identify total number of trips completed for this period

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/awards/urban-community-transportation-coordinator.docx?sfvrsn=5e476461_1

2IS

Historical AirportInspection Reports Select a report... Inspection Report 12-10-2024 Inspection Report 10-25-2023 Inspection Report 10-25-2022 Inspection Report 10-13-2021 Inspection Report 09-15-2020 Inspection Report 10-23-2019 Inspection Report 10-09-2018 Inspection Report 11-01-2017 Inspection Report 10-25-2016 Inspection Record 10-08-2015 Inspection Record 10-28-2014 Inspection, Pavement Management Program Summary Report. The summary reports

https://www.fdot.gov/aviation/airportslist/2IS

48X

Reports Select a report... Inspection Report 11-20-2024 Inspection Report 11-15-2023 Inspection Report 11-16-2022 Inspection Report 11-03-2021 Inspection Report 10-14-2020 Inspection Report 11-06-2019 Inspection Report 11-07-2018 Inspection Report 12-13-2017 Inspection Report 12-14-2016, Record 10-05-2012 Inspection Record 10-28-2011 Inspection Record 10-22-2010 Inspection Report, Record 08-23-1989 Inspection Record 09-27-1988 Inspection Record 12-08-1987 Inspection Report

https://www.fdot.gov/aviation/airportslist/48X

X39

AirportInspection Reports Select a report... Inspection Report 11-19-2024 Inspection Report 11-13-2023 Inspection Report 11-15-2022 Updated Inspection Report 11-15-2022 Inspection Report 11-01-2021 Inspection Report 10-13-2020 Inspection Report 11-05-2019 Inspection Report 11-06-2018 Inspection Report 12-11-2017 Inspection Report 03-21-2017 Inspection Report 12-13-2016 Inspection Record, Inspection Report 05-12-1972 Inspection Record 01-11-1972 Inspection Record 11-21-1969

https://www.fdot.gov/aviation/airportslist/X39

ECP

Historical AirportInspection Reports Select a report... Inspection Report 03-28-2025 Inspection Report 03-15-2024 Inspection Report 03-31-2023 Inspection Report 03-03-2022 Inspection Report 03-12-2021 Inspection Report 09-28-2020 Inspection Report 03-29-2019 Inspection Report 03-29-2018 Inspection Report 03-21-2017 Inspection Report 04-22-2016 Inspection Record 04-14-2015, Airfield Pavement Management Program Summary Report. The summary reports

https://www.fdot.gov/aviation/airportslist/ecp

TLH

a report... Inspection Report 04-11-2024 Inspection Report 04-13-2023 Inspection Report 04-27-2022 Inspection Report 04-20-2021 Inspection Report 09-28-2020 Inspection Report 04-11-2019 Inspection Report 02-15-2018 Inspection Report 05-25-2017 Inspection Report 05-06-2016 Inspection Record, Summary Report. The summary reports are intended to provide, . Airport SAPMP Report

https://www.fdot.gov/aviation/airportslist/TLH

SunRail Phase 2 Property Value Analysis

property value changes around the stations. As detailed in this report, SunRail has proven, to the four Phase 2 South stations which opened in July 2018. This report summarizes the findings, , please see Chapter 2 of the FSU Research Team’s original report that benchmarked and quantified

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/transit/documents/sunrail-phase-2-property-value-analysis.pdf?sfvrsn=36e8fb36_2

1020302.impl

Research Program Report 350 (NCHRP 350) or the Manual for Assessing Safety Hardware 2009 (MASH, devices for inclusion on the QPL shall include the FHWA WZ numbered acceptance letter with attachments, for proper application, field assembly and installation. The QPL or APL number is to be permanently, System (NHS) under the provisions of the NCHRP Report 350 “Recommended Procedures for the Safety, used on roadway sections shall meet the NCHRP Report 350 criteria or the MASH and be listed

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/implemented/1020302.impl.pdf?sfvrsn=22bcc54c_0

1020302-Man03.impl

meet the requirements of National Cooperative Highway Research Program Report 350 (NCHRP 350, the FHWA WZ numbered acceptance letter with attachments and vendor drawings of the device, . The APL number is to be permanently marked on the device at a readily visible location. Sheeting, sign stands on the National Highway System (NHS) under the provisions of the NCHRP Report 350, . Temporary water filled barrier wall used on roadway sections shall meet the NCHRP Report 350

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/implemented/1020302-man03.impl.pdf?sfvrsn=def34a9e_0

D1-09-21-23FuelAllocationReport

 Selected Proposals: E1W16, E1W48-R0, E1W49 ESTIMATED FUEL ALLOCATION SUMMARY Letting Call Number Proposal Project Number Fuel Allocation 01230921 001 E1W16 44738015201 * Y 002 E1W48-R0 43272727241 * N 003 E1W49 43792917276 * N (*) Indicates lead project Page 1 of 2 In preparing bids, of Transportation Fuel Allocation Report web Trnsport 8/10/2023 2:04:42 PM ESTIMATED FUEL ALLOCATION, of Transportation Fuel Allocation Report web Trnsport 8/10/2023 2:04:42 PM

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2023/sep21/d1-09-21-23fuelallocationreport.pdf?sfvrsn=751cf8ee_1
20 of 3593 results