5763 search results for Standard Specifications
DRAFT_ERP_ESC_Narrative
, ERP AH Vol. 1, the FDOT Standard Specifications for Road and Bridge Construction (FDOT Standard, permit application. The FDOT Standard Specifications serve as the directions, provisions, FDOT projects. The FDOT Standard Specifications require all contractors to develop a site-specific, or property beyond the project limits (Specification 104-3). The FDOT Standard Specifications, the AH Vol. I, Part IV, Section 11.2, requirements and the corresponding FDOT Standard Specifications
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/engineers/environmental/draft_erp_esc_narrative.docx?sfvrsn=557f9a63_29951400-723impl
with Military Standard MIL-PRF-24712A or AAMA-2603-02. Finish must meet the requirements of ASTM D3359, ASTM, equipment and components that meet the requirements of these minimum specifications and are listed, requirements of the AASHTO LRFD Specifications for Structural Supports for Highway Signs, Luminaires, in accordance with the Standard Plans. The structural aluminum Z members must run parallel, , Section 1.6. 995-16.3.1 LED and Pixel Specifications: LED lamps must have a minimum viewing
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/implemented/9951400-723impl.pdf?sfvrsn=360a34c4_10010003SS
of Contract, Executed Form of Contract, Performance Bond and Payment Bond, Standard Specifications, to or revise the Standard Specifications or supplemental specifications, setting forth conditions varying from or additional to the Standard Specifications applicable to a specific project, of a Section of these Specifications. Bidder. Anindividual, firm, or corporation submitting a proposal, by the Contractor, covering minor changes in the plans, specifications, or quantities of work, within
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2006/january-2006/workbook/0010003ss.pdf?sfvrsn=c9960c7b_09950100-723origind
- specifications.shtm Manufacturer’s Product Specifications Include product specifications showing, ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance, : Will the proposed revision require changes to: Publication Yes No Office Staff Contacted Standard Plans, of the following types of specifications (Hover over type to go to site.): Special Provisions
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/internal/9950100-723origind.pdf?sfvrsn=f2ae14c3_12024FDM914GenNotes
or curtail requirements in the Standard Specifications or Standard Plans . General notes are not a substitute for specifications. Product and material requirements must be included in the applicable, in the Standard Specifications and Standard Plans . Other rules to follow include: (1) Do, of payment information contained in the Standard Specifications , such as: • Clarify how, of the proposed language is the responsibility of the District Specifications Office. 914.2 General
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm914gennotes.pdf?sfvrsn=a4dd976c_12025FDM914GenNotes
or curtail requirements in the Standard Specifications or Standard Plans. General notes are not a substitute for specifications . Product and material requirements must be included in the applicable, in the Standard Specifications and Standard Plans. Other rules to follow include: (1) Do not include, in the Standard Specifications, such as: • Clarify how incidental work is to be paid, acceptance of the proposed language is the responsibility of the District Specifications Office. 914.2
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm914gennotes.pdf?sfvrsn=78550f6e_12026FDM914GenNotes
-specific and must not restate, broaden or curtail requirements in the Standard Specifications or Standard Plans. General notes are not a substitute for specifications . Product and material requirements must be included in the applicable specifications. Refer to the Specifications Handbook, and abbreviations commonly used in the Standard Specifications and Standard Plans. Other rules, Specifications Office. 914.2 General Notes General notes provide information and direction
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm914gennotes.pdf?sfvrsn=e3821fbb_25700308int
Origination Form Specifications Name: Jason Russell Standard Specification Section: 570 Email, for implementation? The Standard Specifications eBook and Workbook are effective July 1st every year. PERFORMANCE, Summary: Coordinated with the Construction Office, Pay Items, and Specifications. Establishing "Shoulder Dropoff Soil" within the Standard and giving guidance on it in the Specs along, up is required. Do the changes affect other types of specifications? Neither List Specifications
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/internal/5700308int.pdf?sfvrsn=e0ecdb61_15700308ind
Origination Form Specifications Name: Jason Russell Standard Specification Section: 570 Email, for implementation? The Standard Specifications eBook and Workbook are effective July 1st every year. PERFORMANCE, Summary: Coordinated with the Construction Office, Pay Items, and Specifications. Establishing "Shoulder Dropoff Soil" within the Standard and giving guidance on it in the Specs along, up is required. Do the changes affect other types of specifications? Neither List Specifications
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/5700308ind.pdf?sfvrsn=21529172_12026FDM131PlansProcessing
of Contract, (g) Contract Bond, (h) Standard Specifications and Plans (including revisions thereto issued during advertisement), (i) Supplemental Specifications Package, (j) Required Insurance(s, , (j) Standard Specifications and Plans (including revisions thereto issued during construction, the contract plans, specifications, and estimate for letting. It identifies the transmittal forms, a Plans, Specifications, & Estimates (PS&E) Submittal Package. This chapter also outlines
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm131plansprocessing.pdf?sfvrsn=69580074_3SPI-350-001
Standard Plans Instructions Topic No. 625-010-003 Index 350-001 Concrete Pavement Joints FY 2024-25 1 Index 350-001 Concrete Pavement Joints Design Criteria Rigid Pavement Design Manual (RPDM) Design Assumptions and Limitations The drawings shown in this Index include details, of the specifications. Plan Content Requirements Detail the location and dimensions of concrete, - Curb-Concrete Pavement Joint LF See the BOE and Specifications for additional information
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-350-001.pdf?sfvrsn=2e8a775b_2SPI-350-001
Standard Plans Instructions Topic No. 625-010-003 Index 350-001 Concrete Pavement Joints FY 2025-26 1 Index 350-001 Concrete Pavement Joints Design Criteria Rigid Pavement Design Manual (RPDM) Design Assumptions and Limitations The drawings shown in this Index include details, of the specifications. Plan Content Requirements Detail the location and dimensions of concrete pavement, - Curb-Concrete Pavement Joint LF See the BOE and Specifications for additional information
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/spi/spi-350-001.pdf?sfvrsn=c6c1b496_16340203.orig
ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Date: Specification Section: Originator: Articles/Subarticles: Telephone: email: Will the proposed revision involve Design Standard Index changes? Yes No Roadway Design staff contact ed ( name ) : Will the proposed revision involve PPM changes? Yes, the State Specifications Office for assistance in completing this form. Daniel Scheer 850-414-4130
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/comments-responses/6340203.orig.pdf?sfvrsn=e0d1b28e_01050404-MM92origind
ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance in completing this form. Dan Hurtado 850-414-4130 dan.hurtado@dot.state.fl.us Debbie Toole 850-414-4114 deborah.toole@dot.state.fl.us Myndi Craig 850-414-4101 myndi.craig@dot.state.fl.us Rebecca Frimmel, No Office Staff Contacted Standard Plans Index Traffic Engineering Manual FDOT Design Manual
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/review/internal/1050404-mm92origind.pdf?sfvrsn=3bcd8e60_3SPI-350-001
Standard Plans Instructions Topic No. 625-010-003 Index 350-001 Concrete Pavement Joints FY 2026-27 1 Index 350-001 Concrete Pavement Joints Design Criteria Rigid Pavement Design Manual (RPDM) Design Assumptions and Limitations The drawings shown in this Index include details, of the specifications. Plan Content Requirements Detail the location and dimensions of concrete pavement slabs, Pavement Joint LF See the BOE and Specifications for additional information on payment, pay item use
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/spi/spi-350-001.pdf?sfvrsn=90d8b9f5_19950100-723FHWA
/traffic/traf-sys/product- specifications.shtm Manufacturer’s Product Specifications Include product specifications showing electrical requirements, voltages, etc. Product Drawings or Cut Sheet, Specifications Office Section: 995 Proposed Specification: 9950100 Traffic Control Signal and Device, Specifications Engineer DS/ra Attachment cc: Florida Transportation Builders' Assoc. State Construction, -Specifications.shtm. 7.For WWVDS installed on ramps, the device shall: a.Send an alert
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/fhwa/9950100-723fhwa.pdf?sfvrsn=237d02e6_19950100-723FHWA2
://www.fdot.gov/traffic/traf-sys/product- specifications.shtm Manufacturer’s Product Specifications Include product specifications showing electrical requirements, voltages, etc. Product Drawings or Cut Sheet, Specifications Office Section: 995 Proposed Specification: REVISED 9950100 Traffic Control Signal, Specifications Engineer DS/ra Attachment cc: Florida Transportation Builders' Assoc. State, /Traf-Sys/Product-Specifications.shtm. 7.For WWVDS installed on ramps, the device shall: a.Send
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/fhwa/9950100-723fhwa2.pdf?sfvrsn=95cd0071_1SPM0010300-724-i19160
, Executed Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, of the work. In this contract, references to “the plans” mean the Department’s Standard Plans, plans” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/maintenance/finalized/spm0010300-724-i19160.pdf?sfvrsn=52e1354f_1SPM0010300-725-i19840
, Executed Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, of the work. In this contract, references to “the plans” mean the Department’s Standard Plans, plans” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/maintenance/finalized/spm0010300-725-i19840.pdf?sfvrsn=af1d696a_1SPM0010300-723-i18538
, Executed Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, of the work. In this contract, references to “the plans” mean the Department’s Standard Plans, plans” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/maintenance/finalized/spm0010300-723-i18538.pdf?sfvrsn=c7e5aca5_2