5763 search results for Standard Specifications

DRAFT_ERP_ESC_Narrative

, ERP AH Vol. 1, the FDOT Standard Specifications for Road and Bridge Construction (FDOT Standard, permit application. The FDOT Standard Specifications serve as the directions, provisions, FDOT projects. The FDOT Standard Specifications require all contractors to develop a site-specific, or property beyond the project limits (Specification 104-3). The FDOT Standard Specifications, the AH Vol. I, Part IV, Section 11.2, requirements and the corresponding FDOT Standard Specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/engineers/environmental/draft_erp_esc_narrative.docx?sfvrsn=557f9a63_2

9951400-723impl

with Military Standard MIL-PRF-24712A or AAMA-2603-02. Finish must meet the requirements of ASTM D3359, ASTM, equipment and components that meet the requirements of these minimum specifications and are listed, requirements of the AASHTO LRFD Specifications for Structural Supports for Highway Signs, Luminaires, in accordance with the Standard Plans. The structural aluminum Z members must run parallel, , Section 1.6. 995-16.3.1 LED and Pixel Specifications: LED lamps must have a minimum viewing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/implemented/9951400-723impl.pdf?sfvrsn=360a34c4_1

0010003SS

of Contract, Executed Form of Contract, Performance Bond and Payment Bond, Standard Specifications, to or revise the Standard Specifications or supplemental specifications, setting forth conditions varying from or additional to the Standard Specifications applicable to a specific project, of a Section of these Specifications. Bidder. Anindividual, firm, or corporation submitting a proposal, by the Contractor, covering minor changes in the plans, specifications, or quantities of work, within

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2006/january-2006/workbook/0010003ss.pdf?sfvrsn=c9960c7b_0

9950100-723origind

- specifications.shtm Manufacturer’s Product Specifications Include product specifications showing,  ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance, : Will the proposed revision require changes to: Publication Yes No Office Staff Contacted Standard Plans, of the following types of specifications (Hover over type to go to site.): Special Provisions

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/internal/9950100-723origind.pdf?sfvrsn=f2ae14c3_1

2024FDM914GenNotes

or curtail requirements in the Standard Specifications or Standard Plans . General notes are not a substitute for specifications. Product and material requirements must be included in the applicable, in the Standard Specifications and Standard Plans . Other rules to follow include: (1) Do, of payment information contained in the Standard Specifications , such as: • Clarify how, of the proposed language is the responsibility of the District Specifications Office. 914.2 General

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm914gennotes.pdf?sfvrsn=a4dd976c_1

2025FDM914GenNotes

or curtail requirements in the Standard Specifications or Standard Plans. General notes are not a substitute for specifications . Product and material requirements must be included in the applicable, in the Standard Specifications and Standard Plans. Other rules to follow include: (1) Do not include, in the Standard Specifications, such as: • Clarify how incidental work is to be paid, acceptance of the proposed language is the responsibility of the District Specifications Office. 914.2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm914gennotes.pdf?sfvrsn=78550f6e_1

2026FDM914GenNotes

-specific and must not restate, broaden or curtail requirements in the Standard Specifications or Standard Plans. General notes are not a substitute for specifications . Product and material requirements must be included in the applicable specifications. Refer to the Specifications Handbook, and abbreviations commonly used in the Standard Specifications and Standard Plans. Other rules, Specifications Office. 914.2 General Notes General notes provide information and direction

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm914gennotes.pdf?sfvrsn=e3821fbb_2

5700308int

 Origination Form Specifications Name: Jason Russell Standard Specification Section: 570 Email, for implementation? The Standard Specifications eBook and Workbook are effective July 1st every year. PERFORMANCE, Summary: Coordinated with the Construction Office, Pay Items, and Specifications. Establishing "Shoulder Dropoff Soil" within the Standard and giving guidance on it in the Specs along, up is required. Do the changes affect other types of specifications? Neither List Specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/internal/5700308int.pdf?sfvrsn=e0ecdb61_1

5700308ind

 Origination Form Specifications Name: Jason Russell Standard Specification Section: 570 Email, for implementation? The Standard Specifications eBook and Workbook are effective July 1st every year. PERFORMANCE, Summary: Coordinated with the Construction Office, Pay Items, and Specifications. Establishing "Shoulder Dropoff Soil" within the Standard and giving guidance on it in the Specs along, up is required. Do the changes affect other types of specifications? Neither List Specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/5700308ind.pdf?sfvrsn=21529172_1

2026FDM131PlansProcessing

of Contract, (g) Contract Bond, (h) Standard Specifications and Plans (including revisions thereto issued during advertisement), (i) Supplemental Specifications Package, (j) Required Insurance(s, , (j) Standard Specifications and Plans (including revisions thereto issued during construction, the contract plans, specifications, and estimate for letting. It identifies the transmittal forms, a Plans, Specifications, & Estimates (PS&E) Submittal Package. This chapter also outlines

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm131plansprocessing.pdf?sfvrsn=69580074_3

SPI-350-001

 Standard Plans Instructions Topic No. 625-010-003 Index 350-001 Concrete Pavement Joints FY 2024-25 1 Index 350-001 Concrete Pavement Joints Design Criteria Rigid Pavement Design Manual (RPDM) Design Assumptions and Limitations The drawings shown in this Index include details, of the specifications. Plan Content Requirements Detail the location and dimensions of concrete, - Curb-Concrete Pavement Joint LF See the BOE and Specifications for additional information

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-350-001.pdf?sfvrsn=2e8a775b_2

SPI-350-001

 Standard Plans Instructions Topic No. 625-010-003 Index 350-001 Concrete Pavement Joints FY 2025-26 1 Index 350-001 Concrete Pavement Joints Design Criteria Rigid Pavement Design Manual (RPDM) Design Assumptions and Limitations The drawings shown in this Index include details, of the specifications. Plan Content Requirements Detail the location and dimensions of concrete pavement, - Curb-Concrete Pavement Joint LF See the BOE and Specifications for additional information

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/spi/spi-350-001.pdf?sfvrsn=c6c1b496_1

6340203.orig

 ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Date: Specification Section: Originator: Articles/Subarticles: Telephone: email: Will the proposed revision involve Design Standard Index changes? Yes No Roadway Design staff contact ed ( name ) : Will the proposed revision involve PPM changes? Yes, the State Specifications Office for assistance in completing this form. Daniel Scheer 850-414-4130

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/comments-responses/6340203.orig.pdf?sfvrsn=e0d1b28e_0

1050404-MM92origind

 ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance in completing this form. Dan Hurtado 850-414-4130 dan.hurtado@dot.state.fl.us Debbie Toole 850-414-4114 deborah.toole@dot.state.fl.us Myndi Craig 850-414-4101 myndi.craig@dot.state.fl.us Rebecca Frimmel, No Office Staff Contacted Standard Plans Index Traffic Engineering Manual FDOT Design Manual

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/review/internal/1050404-mm92origind.pdf?sfvrsn=3bcd8e60_3

SPI-350-001

 Standard Plans Instructions Topic No. 625-010-003 Index 350-001 Concrete Pavement Joints FY 2026-27 1 Index 350-001 Concrete Pavement Joints Design Criteria Rigid Pavement Design Manual (RPDM) Design Assumptions and Limitations The drawings shown in this Index include details, of the specifications. Plan Content Requirements Detail the location and dimensions of concrete pavement slabs, Pavement Joint LF See the BOE and Specifications for additional information on payment, pay item use

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/spi/spi-350-001.pdf?sfvrsn=90d8b9f5_1

9950100-723FHWA

/traffic/traf-sys/product- specifications.shtm Manufacturer’s Product Specifications Include product specifications showing electrical requirements, voltages, etc. Product Drawings or Cut Sheet, Specifications Office Section: 995 Proposed Specification: 9950100 Traffic Control Signal and Device, Specifications Engineer DS/ra Attachment cc: Florida Transportation Builders' Assoc. State Construction, -Specifications.shtm. 7.For WWVDS installed on ramps, the device shall: a.Send an alert

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/fhwa/9950100-723fhwa.pdf?sfvrsn=237d02e6_1

9950100-723FHWA2

://www.fdot.gov/traffic/traf-sys/product- specifications.shtm Manufacturer’s Product Specifications Include product specifications showing electrical requirements, voltages, etc. Product Drawings or Cut Sheet, Specifications Office Section: 995 Proposed Specification: REVISED 9950100 Traffic Control Signal, Specifications Engineer DS/ra Attachment cc: Florida Transportation Builders' Assoc. State, /Traf-Sys/Product-Specifications.shtm. 7.For WWVDS installed on ramps, the device shall: a.Send

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/fhwa/9950100-723fhwa2.pdf?sfvrsn=95cd0071_1

SPM0010300-724-i19160

, Executed Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, of the work. In this contract, references to “the plans” mean the Department’s Standard Plans, plans” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/maintenance/finalized/spm0010300-724-i19160.pdf?sfvrsn=52e1354f_1

SPM0010300-725-i19840

, Executed Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, of the work. In this contract, references to “the plans” mean the Department’s Standard Plans, plans” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/maintenance/finalized/spm0010300-725-i19840.pdf?sfvrsn=af1d696a_1

SPM0010300-723-i18538

, Executed Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, of the work. In this contract, references to “the plans” mean the Department’s Standard Plans, plans” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/maintenance/finalized/spm0010300-723-i18538.pdf?sfvrsn=c7e5aca5_2
20 of 5763 results