4651 search results for pavement design
521-514FHWAApproved
Contacted Affected (Yes/No) Other Standard Plans No FDOT Design Manual No Standard Specifications, 7. Shoulder or Roadway Pavement and Fill is required on the traffic side of the spread 6. Provide, Pavement and Fill is required on the traffic side of the spread 6. Provide and install Preformed
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/521-514fhwaapproved.pdf?sfvrsn=e5d735e7_1ALACHUA COUNTY_TWP2027-2031 WPPH_BY ITEM_10-13-2025_SUBJECT TO CHANGE
$400,000 $400,000 449976-8 - GAINESVILLE OPERATIONS DESIGN ADA REST ROOMS/SHOWERS Type of Work, : RIGID PAVEMENT RECONSTRUCTION Phase Funding Source 2027 2028 2029 2030 2031 Construction Federal, 428511-2 $800,000 429036-2 - GAINESVILLE REGIONAL APT DESIGN & CONSTRUCT NEW GA TERMINAL PFL0013433, APT DESIGN & CONST T-HANGARS & TAXILANES PFL0014358 Type of Work: AVIATION REVENUE/OPERATIONAL, for Project 429303-2 $3,000,000 432958-2 - GAINESVILLE REGIONAL APT DESIGN & CONSTRUCT TWY E CONNECTOR
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/2025-wp-hearing-docs/projects-by-item/alachua-county_twp2027-2031-wpph_by-item_10-13-2025_subject-to-change.pdf?sfvrsn=4941895e_1ALACHUA COUNTY_TWP2027-2031 WPPH_BY DESCRIPTION_10-13-2025_SUBJECT TO CHANGE
for Project 448273-1 $400,000 $400,000 $400,000 449976-8 - GAINESVILLE OPERATIONS DESIGN ADA REST ROOMS, 144TH AVE Type of Work: RIGID PAVEMENT RECONSTRUCTION Phase Funding Source 2027 2028 2029 2030, ALACHUA COUNTY Modal Development: Aviation 429303-2 - GAINESVILLE REG APT DESIGN & CONST T, 438739-2 - GAINESVILLE REG APT DESIGN & CONSTRUCT TXWY C PFL0012567 Type of Work: AVIATION CAPACITY, - GAINESVILLE REGIONAL APT DESIGN & CONSTRUCT NEW GA TERMINAL PFL0013433 Type of Work: AVIATION REVENUE
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/2025-wp-hearing-docs/projects-by-description/alachua-county_twp2027-2031-wpph_by-description_10-13-2025_subject-to-change.pdf?sfvrsn=559ff736_1Median Width DVM 447880-1 (Signed)
Loma Drive to Kelly Road Design Variation Memorandum Submitted herewith is the Design Variation Memo, of repaving the roadway, signing and pavement marking, signalization, and lighting plans, as well, .) TYPICAL SECTION MILLING MILL EXISTING ASPHALT PAVEMENT (1 1/2" AVG. DEPTH) RESURFACING FRICTION, WITH MILLING 1.25' RESURFACING LEVEL 2' SOD PAVEMENT SAWCUT 0 . 0 2 ( M A X . ) LIMITS, SR 865 TRAFFIC DATA CONTEXT CLASSIFICATION = C3C DESIGN SPEED = 35 MPH DESIGN HOUR T = 4.1% K
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26112/median-width-dvm-447880-1-(signed).pdf?sfvrsn=79a40438_1PublicHearing_DISTRICTWIDE_Summary_2024-2028
MISC DRAINAGE STUDIES/DESIGN Type of Work: PRELIMINARY ENGINEERING Phase Funding Source 2024 2025, $2,800,000 $2,800,000 $2,800,000 $2,800,000 237975-1 - DISTRICTWIDE DRAINAGE PROJECTS DESIGN, DISTRICTWIDE Highways 237995-1 - DISTRICTWIDE SAFETY PROGRAM STUDIES AND DESIGN Type of Work: SAFETY, $4,575,000 $2,000,000 241081-1 - DISTRICTWIDE DRAINAGE DESIGN CONSULTANT Type of Work, - DISTRICTWIDE STRUCTURES MAINTENANCE DESIGN/MINOR PROJECTS Type of Work: PRELIMINARY ENGINEERING Phase
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_districtwide_summary.pdf?sfvrsn=3a2c060b_4FDOT Spotlights Major Infrastructure Projects
quickly. This year’s SWIFTT winner developed a truck-mounted mobile robotic pavement marking system, state’s storied history with over 100 designated sites across Florida, with at least one significant
https://www.fdot.gov/info/co/news/2025/12302025E8W13Addenda001
STANDARD PLANS: following website: http://www.fdot.gov/design/standardplans Standard Plans for Road, MANGER ENGINEER TP ASHRAF ELMAGHRABY, P.E. FEBRUARY 2025 FINAL PLANS THIS PROJECT IS DESIGNED, LIGHTING CONDUIT 15' DRAINAGE OFFSET EDGE OF PAVEMENT SEE INSERT A INSERT A SUB AREA (0.19 AC, ' LIGHTING 7' UTILITIES OFFSET 15' DRAINAGE OFFSET EDGE OF PAVEMENT EDGE OF PAVEMENT EDGE OF PAVEMENT SUB AREA (0.09 AC) LIGHTING CONDUIT OVERHEAD ELECTRIC (1.34 AC) SELECTIVE CLEARING
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/may13/e8w13addenda001.pdf?sfvrsn=c93bdefe_144737915201-PLANS-01-ROADWAY (1)
://www.fdot.gov/design/standardplans Standard Plans for Road Construction and associated IRs, LOCATION URL: LIGHTING PLANS SIGNALIZATION PLANS SIGNING AND PAVEMENT MARKING PLANS ROADWAY, (US 301/US 41) TYPICAL SECTION TRAFFIC DATA CONTEXT CLASSIFICATION = C4 DESIGN SPEED = 45 MPH DESIGN HOUR T = 20.0% K = 9.0% D = 54.0% T = 3.7% (24 HOUR) = 2046 AADT = 88,400 ESTIMATED DESIGN, N G MAINLINE MILLING PAVEMENT FOR DEPTH (3 1/2") MILL EXISTING ASPHALT M A T C H E X I
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25127/44737915201-plans-01-roadway-(1).pdf?sfvrsn=91328fcc_1dchgtab
Rolled into 2004 Spec Book 5-20-03 5-29-03 1-04 D1020952 New SS. To specify Design Standard Index, this Section to Section 710 and to delete information that is duplicated in the Design Standards, information that would normally be shown as a plan note. Design Build projects would previously, - Reflective Pavement Markers when pay item for Painted Pavement Markings (Final Surface
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2004/january-2004/workbook/dchgtab.pdf?sfvrsn=a2ed9768_0PublicHearing_PINELLAS COUNTY_Summary_2026-2030
- PINELLAS OPS CENTER-DESIGN AND CONSTRUCTION ADA WALKAWAY Type of Work: FIXED CAPITAL OUTLAY Phase, FROM MANATEE COUNTY LINE TO HILLSBOROUGH COUNTY LINE Type of Work: SIGNING/PAVEMENT MARKINGS Phase, PAVEMENT REHABILITATION Phase Funding Source 2026 2027 2028 2029 2030 Construction Federal $30,946,042, - SIDEWALK GAP DESIGN - PINELLAS COUNTY Type of Work: SIDEWALK Phase Funding Source 2026 2027 2028 2029, 686 FROM W OF 28TH ST N TO E OF 28TH ST N Type of Work: RIGID PAVEMENT RECONSTRUCTION Phase Funding
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d7wpph/publichearing_pinellas-county_summary_2026-2030.pdf?sfvrsn=3cb5ebfc_1fdot-bed31-977-08-rpt
. Additionally, it detailed the design and utility of a comprehensive dashboard for visualizing, ........................................................................................................................... 32 2.9.1 Dashboard Design, on freeways and arterial roads. They are typically installed in the pavement to detect vehicles, monitor
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bed31-977-08-rpt.pdf?sfvrsn=8b34b0f6_1Meeting Details 2017
Complete Streets And FDOT Design MPOAC Governing Board Meeting Freight Presentations: Freight, , Pavement, and System Performance Measures and Asset Management Final Rules Overview Business Items
https://www.fdot.gov/mpoac/meeting-details-2017Washington County FY26-30 Summary
$175,440 $20,000 $25,000 $25,000 448395-1 - CHIPLEY OPERATIONS BUILDING - DESIGN/CONSTRUCTION (MAJOR, of Work: FLEXIBLE PAVEMENT RECONSTRUCT. Phase Funding Source 2026 2027 2028 2029 2030 Construction
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d3_adopted_documents/washington-county-fy26-30-summary.pdf?sfvrsn=60cd6f9e_12025 District Seven Letting and Project Information
/Pavement Markings Prequalification required February 19, 2025, TAB INTENT TO AWARD - CONTRACTOR'S NAME DATE AWARDED E7Q40 Alexander Design + Build, LLC
https://www.fdot.gov/contracts/district-offices/d7/lettings/2025/2025-district-seven-letting-and-project-information