5200 search results for Standard Specifications

7130403-722origind

 ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance, : Will the proposed revision require changes to: Publication Yes No Office Staff Contacted Standard Plans, , State Specifications Engineer SUBJECT: Proposed Specification: 7130403 Permanent Tape Pavement, value for black pavement markings in the Standard Specification. Please share this proposal

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/7130403-722origind.pdf?sfvrsn=5c78f654_2

0040100 IndustryCommentResponse

somewhere else, if discussed in the Standard Specifications at all. RESPONSE: Using “digital, comments and responses are verbatim as received. The Specifications Office does not alter typos or grammar.) BLACK = Comment BLUE = Specifications Response GREEN = Change Made to Specification Name, is in conflict. Being that the Standard Specs are the only Contract Document here, recommend taking a good look, . Documents can be manually wet ink signed and submitted but this option is no longer our standard

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/comments-responses/0040100-industrycommentresponse.pdf?sfvrsn=3533a8ea_1

SP0010300-i16254

Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed or otherwise, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, or where, . In this contract, references to “the plans” mean the Department’s Standard Plans, and revisions, ” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/maintenance/finalized/sp0010300-i16254.pdf?sfvrsn=b8361f99_3

SP0010300

Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed or otherwise, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, or where, . 2 In this contract, references to “the plans” mean the Department’s Standard Plans, ” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/maintenance/finalized/sp00103003339379c8e72432d9028410163406c07.pdf?sfvrsn=ad7a2708_3

SP0010300

Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed or otherwise, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, or where, of the work. In this contract, references to “the plans” mean the Department’s Standard Plans, ” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/maintenance/finalized/sp0010300cd468686-8496-4860-b9dc-1aeb5f3ca6b5.pdf?sfvrsn=e3b45fb1_3

SP0010300

Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed or otherwise, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, or where, . 2 In this contract, references to “the plans” mean the Department’s Standard Plans, ” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/maintenance/finalized/sp0010300.pdf?sfvrsn=51d20c2e_1

2024FDM944LandscapePlans

or Standard Specifications . Place general notes on standard-format sheets (11”x17”). General, contained in the Standard Specifications , such as: • Clarify how incidental work is to be paid, or Standard Specifications . Construction details for tree bracing during root establishment, in the Standard Plans or Standard Specifications . Include a legend depicting the symbology used, in the Standard Plans or Standard Specifications . 944.5 Landscape Maintenance Guide Sheet

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm944landscapeplans.pdf?sfvrsn=bc392161_1

2025FDM944LandscapePlans

site-specific requirements not covered by the Standard Plans or Standard Specifications. Place general notes on standard-format sheets (11”x17”). General notes may include: • Benchmark datum, not covered by the basis of payment information contained in the Standard Specifications, or Standard Specifications. 944.5 Landscape Maintenance Guide Sheet The Landscape Maintenance Guide, are produced on a standard- format sheet (11”x17”) created using the FDOT CADD Software. Topic

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm944landscapeplans.pdf?sfvrsn=d7d6e20_1

7151600.resp

specifications for “J” hooks – to release the tension as the conductor exits the bracket to connect to the base of the pole. Response: Standard Index No. 17515 already has the details for the “J” hook at the top of the pole. No changes made. 4. Provide specifications for use of electrical NEC approved, specifications for alternative materials for high mast lighting components, such as galvanized steel, to avoid rusting. Response: The Standard Index and Specification for high mast already require

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/comments-responses/7151600.resp.pdf?sfvrsn=fdc5d0bf_0

2025FDM131PlansProcessing

, (g) Contract Bond, (h) Standard Specifications and Plans (including revisions thereto issued during advertisement), (i) Supplemental Specifications Package, (j) Required Insurance(s) and, (k, ) Standard Specifications and Plans (including revisions thereto issued during construction), (k, , specifications and estimate for letting. It identifies the transmittal forms, certifications and other, , Specifications & Estimates (PS&E) submittal package. This chapter also outlines the steps to resubmit

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm131plansprocessing.pdf?sfvrsn=298735de_1

7150100.FHWA

Re: State Specifications Office Section: 715 Proposed Specification: 7150100 Highway Lighting, Office to make verbiage consistent with current and future FDOT Standard Plan Indexes pending release, Specifications Engineer DH/rf Attachment cc: Florida Transportation Builders' Assoc. State Construction, with the details shown in the Plans. Use pole assemblies as shown in the Design Standards when standard aluminum pole assemblies or standard high mast light assemblies are required by the Contract Documents

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/fhwa/7150100.fhwa.pdf?sfvrsn=f735340d_0

4250607.resp

Hollis 414-4182 melissa.hollis@dot.state.fl.us Comments: (11-2-17) I’m questioning the Standard, in accordance with the Standard Plans, Index 425-001 for drainage structures or Index 125-001, of the Spec change (and Standard Plan change) is to ensure manholes and utility structures, structures in accordance with the Index No. 307 (new Standard Plans Index 125-001, Sheet 2). The proposed language should be included in this Index, not the Specifications. Response

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/comments-responses/4250607.resp.pdf?sfvrsn=655baea3_0

7-09DesignBuildBoilerplate

to the Standard Specifications applicable to a specific project. Page 10 of 104 D.Technical Special, not apply, except as provided in 9-2, Scope of Payments. 4-2 Work not covered by Standard Specifications. Proposedconstructionandanycontractualrequirements not covered by these Standard Specifications may,  Page 1 of 104 DESIGN-BUILD SPECIFICATIONS. (REV 5-27-09) DIVISION I GENERAL REQUIREMENTS, ,priortoawardoftheContract,andtothe Contractor.Within Divisions I and II of the specifications, sentences

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2009/july-2009/design-build/7-09designbuildboilerplate.pdf?sfvrsn=ebc50ea4_0

1-09DesignBuildBoilerplate

to the Standard Specifications applicable to a specific project. Page 10 of 104 D.Technical Special, of Payments. 4-2 Work not covered by Standard Specifications. Proposedconstructionandanycontractualrequirements not covered by these Standard Specifications may be covered by Contract plan notes,  Page 1 of 104 DESIGN-BUILD SPECIFICATIONS. (REV 9-24-08) DIVISION I GENERAL REQUIREMENTS, ,priortoawardoftheContract,andtothe Contractor.Within Divisions I and II of the specifications, sentences

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2009/january-2009/design-build/1-09designbuildboilerplate.pdf?sfvrsn=bd81f631_0

E1W50Addendum001

with the exception of the Standard Specifications for Road and Bridge Construction (Divisions II & III, the edition of the Standard Specifications for Road and Bridge Construction (Divisions II & III), Special Provisions and Supplemental Specifications, FDOT Standard Plans and applicable Interim Revisions, to specifications, standards or established Department policies. Innovation should be limited, . Specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1w50/e1w50addendum001.pdf?sfvrsn=fd1f8de9_1

E1W50Addendum003

at the date of advertisement of this contract with the exception of the Standard Specifications, Specifications, Manual on Uniform Traffic Control Devices (MUTCD), and FDOT Standard Plans with applicable Interim Revisions. The Design-Build Firm shall use the edition of the Standard Specifications for Road, / 5. Florida Department of Transportation Standard Specifications for Road and Bridge Construction, Advertisement A02_Design Build Division I Specifications A02a_Award and Execution of Contract – Public

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1w50/e1w50addendum003.pdf?sfvrsn=99177843_1

E1W50Addendum004

of the Standard Specifications for Road and Bridge Construction (Divisions II & III), Special Provisions and Supplemental Specifications, Manual on Uniform Traffic Control Devices (MUTCD), and FDOT Standard, of the Standard Specifications for Road and Bridge Construction (Divisions II & III), Special Provisions and Supplemental Specifications, FDOT Standard Plans and applicable Interim Revisions in effect, ://www.fdot.gov/roadway/FDM/ 5. Florida Department of Transportation Standard Specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1w50/e1w50addendum004.pdf?sfvrsn=96b59839_1

2024FDM117MonitorExStructures

, and groundwater monitoring of existing structures during construction as described in Standard Specifications, the distances specified in the Standard Specifications , Section 108 , must be listed in a pay item note, in the Standard Specifications , Section 108 , must be listed in a pay item note on the General, the distances specified in the Standard Specifications, Section 108 . 117.3 Vibration Monitoring, Report in the Summary of Lump Sum Items table. Because Standard Specifications, Section 108, does

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm117monitorexstructures.pdf?sfvrsn=439d9f3a_1

SPI-400-291

 Standard Plans Instructions Topic No. 625-010-003 Index 400-291 Precast Concrete Box Culvert Supplemental Details FY 2024-25 1 Index 400-291 Precast Concrete Box Culvert Supplemental Details Design Criteria AASHTO LRFD Bridge Design Specifications; Structures Design Guidelines (SDG) Design Assumptions and Limitations Work this Index with the Cast-In-Place Concrete Box Culvert Details and Data Tables shown in the plans, Indexes 400-289 and 400-292, and the Precast Concrete Box

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-400-291.pdf?sfvrsn=cf6739fa_1

SPI-509-100

 Standard Plans Instructions Topic No. 625-010-003 Index 509-100 Advance Warning for R/R Crossing FY 2024-25 1 Index 509-100 Advance Warning for R/R Crossing Design Criteria FDOT Design Manual (FDM); Traffic Engineering Manual (TEM); Manual on Uniform Traffic Control Devices (MUTCD); Federal Railroad Administration; AASHTO Policy on Geometric Design of Highways and Streets, Highway-Rail, See the BOE and Specifications for additional information on payment, pay item use and compensation

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-509-100.pdf?sfvrsn=5efa04a0_1
20 of 5200 results