4273 search results for REPORT NUMBER

Draft-MPOAC-PT-Minutes-07-07-2021v2

’s salary. The following items were addressed: • The legislature gives FDOT a set number, . Horne stated that she will investigate these issues and report back to the MPOAC. Abra Horne

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2021/draft-mpoac-pt-minutes-07-07-2021v2.pdf?sfvrsn=a0172742_1

3460202.origind

of the completion of temperature monitoring, submit a report to the Engineer which includes all temperature, number generator. The Department may perform Independent Verification testing to verify compliance

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/internal/3460202.origind.pdf?sfvrsn=b207cf43_2

FMTP24_TM5_Policies_Strategies

2023 is the third trade and logistics research report published by the Florida Chamber Foundation over, reduce air pollution? Number of alternative fuel stations within 5 miles of corridor Does

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/rail/plans/fmtp/fmtp24/fmtp24_tm5_policies_strategies.pdf?sfvrsn=ab4e603c_5

2026FDM240TMP

to smaller segments of the project at a time (b) Limits the number and use of TTC devices, to completion of the Phase I Roadway Plans or the Bridge Development Report (BDR), whichever

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm240tmp.pdf?sfvrsn=88cbbead_12

2026FDM240TMP

to smaller segments of the project at a time (b) Limits the number and use of TTC devices on a project, to completion of the Phase I Roadway Plans or the Bridge Development Report (BDR), whichever is earlier

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm240tmp.pdf?sfvrsn=3a9a4fc5_3

MeetimgPackage091619

Gate, Florida 33612 Dial-In Number: 888-585-9008 Conference Code: 837653349 Item # Agenda Item, . Advantage Ride Program Update Ned Freeman, EVP, Marketing UZURV XIII. Executive Director Report, :00 PM Dial-In Number: 888-585-9008 Conference Code: 837653349 Commissioners Present, Report Executive Director Holmes addressed the following agenda items and provided handouts, Tallahassee, Florida 9:00 AM Dial-In Number: 850-410-5667 Commissioners Present Commissioners

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/meetingpackages/2019-meetings/meetimgpackage091619.pdf?sfvrsn=af74ea5d_2

44629625201-PLANS-05-LIGHTING

NUMBER 66564 METRIC ENGINEERING, INC. VENDOR NO.: F560885615-001 JACKSONVILLE, FLORIDA 32224, SIGNED AND SEALED BY THIS ITEM HAS BEEN DIGITALLY POLE NUMBER CIRCUIT NUMBER DESIGNATION LOAD, DESIGN ANALYSIS REPORT SHALL BE USED, IF NO ALTERNATIVE LUMINAIRES ARE PROPOSED. POINT-TO-POINT, AGENCY CONTACT INFORMATION IS: 2. COORDINATE LIGHT POLE IDENTIFICATION NUMBER WITH LEE COUNTY, BEACH DRIVE, SUITE 1 METRIC ENGINEERING, INC. LICENSE NUMBER 66564 RICARDO J. GONZALEZ, P.E

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25118/44629625201-plans-05-lighting.pdf?sfvrsn=871ae0eb_1

MATT (31) - MASH TL3 - Manual

 MAT T TM M E D I A N AT T E N UAT I N G T R E N D ® T E R M I N A L P R O D U C T M A N UAL PN 628155 REVISION D AUGUST 2023 Part Number: 628155 © Valtir, LLC Valtir.com 1 Revision D August 2023 MATT™ MEDIAN ATTENUATING TREND ® TERMINAL The Median Attenuating TREND ® Terminal (“MATT™”) has been tested to the American Association of State and Highway Transportation Officials, that have been accepted under MASH or NCHRP Report 350 crash test criteria that utilize 8” [200 mm

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/maintenance/rdw/ispe/end-treatment/matt-(31)---mash-tl3---manual.pdf?sfvrsn=b7d36cbc_1

MeetingPackage06032019

Boulevard Tampa, Florida 33612 Dial-In Number: 888-585-9008 Conference Code: 837653349 Item # Agenda, Steve Holmes Information Items VIII. Executive Director Report Steve Holmes IX. Public Comments, (formerly the Annual Operating Report). Special thanks was also given to Kim Hansen for her work, will be testing the Data Collection System and the system should be ready by July 1. Executive Director Report, Business Meeting Conference Call (Conference call number will be provided with the agenda

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/meetingpackages/2019-meetings/meetingpackage06032019.pdf?sfvrsn=8e814a65_2

Local Resource Guide_V21

governments and elected officials using the processes detailed in the report, A Review of Florida’s, could include a number of different recommendations in the CIP, i n c l u d i n g runway

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/policy/local-resource-guide/local-resource-guide_v21.pdf?sfvrsn=e72abc3_16

2025FDM212Intersections

Report (AIIR). These types of alternate intersection designs should be coordinated with the Central, with supplemental signing stating the number of approaches. All-way stop control is most effective

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm212intersections.pdf?sfvrsn=866453ce_1

ch09s04

of the existing mortgage(s) to compute the number of months actually necessary to pay off the existing, , and termite inspection; (E) Credit report; (F) Owner's and mortgagee's evidence of title

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/rightofway/documents/rowmanual/ch09s04.pdf?sfvrsn=331579d2_3

2026FDM212Intersections

: Informational Report (AIIR). These types of alternate intersection designs should be coordinated, marked with supplemental signing stating the number of approaches. All-way stop control is most

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm212intersections.pdf?sfvrsn=cb5713fa_6

2026FDM220RR

, Section 8A.10, when determining number of train passages at night consider seasonal and daily variation, blocking the crossing: • Stop condition • Roundabout • Reduction in the number of lanes Topic

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm220rr.pdf?sfvrsn=36ef25e4_16

FDOT Local Agency Procurement Manual

three competitive price or rate quotes from an adequate number of qualified sources. Competitive, Standard Form‐LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions. 3

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/transit/procurement/fdot-local-agency-procurement-manual_e8589ae8-a943-40d8-8952-fe8e62e58acb.pdf?sfvrsn=6c037d51_2

RStandardPlansFY2024-25e

Number Rdwy. Roadway Trans. Transition or Transverse NA or N/A Not Available or Not Applicable Rect, Laboratories No. Number R/R or RR Railroad UPS Uninterruptible Power Supply Nom. Nominal RSDU, Power Service 700-110 Mounting Exit Number Panels to Signs 641-010 Concrete Poles 700-120 Enhanced, in the Hanger Beams correctly; Added language to Detail B bolt call out to clarify number of bolts required, numbers. Sheet 3: Corrected the welding arrows on Section A-A and C-C to be consistent with AWS; Added

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/rstandardplansfy2024-25e.pdf?sfvrsn=d29c93ff_3

RStandardPlansFY2024-25e

Number Rdwy. Roadway Trans. Transition or Transverse NA or N/A Not Available or Not Applicable Rect, Laboratories No. Number R/R or RR Railroad UPS Uninterruptible Power Supply Nom. Nominal RSDU, Power Service 700-110 Mounting Exit Number Panels to Signs 641-010 Concrete Poles 700-120 Enhanced, in the Hanger Beams correctly; Added language to Detail B bolt call out to clarify number of bolts required, numbers. Sheet 3: Corrected the welding arrows on Section A-A and C-C to be consistent with AWS; Added

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/rstandardplansfy2024-25e.pdf?sfvrsn=c6274fac_2

rstandardplansfy2023-24e4

Penetration Number Rdwy. Roadway Trans. Transition or Transverse NA or N/A Not Available, Underwriters Laboratories No. Number R/R or RR Railroad UPS Uninterruptible Power Supply Nom, 639-002 Electric Power Service 700-110 Mounting Exit Number Panels to Signs 641-010 Concrete Poles, details beyond wiring. 715-002 Sheets 1-9: Updated all sheet numbers in details, Notes

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2024/rstandardplansfy2023-24e4.pdf?sfvrsn=9bc213e4_2

rstandardplansfy2023-24e5

Penetration Number Rdwy. Roadway Trans. Transition or Transverse NA or N/A Not Available, Underwriters Laboratories No. Number R/R or RR Railroad UPS Uninterruptible Power Supply Nom, 639-002 Electric Power Service 700-110 Mounting Exit Number Panels to Signs 641-010 Concrete Poles, details beyond wiring. 715-002 Sheets 1-9: Updated all sheet numbers in details, Notes

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2024/rstandardplansfy2023-24e5.pdf?sfvrsn=4b258559_1

RStandardPlansFY2025-26e

----------------- Rd. Road or Round TN Ton N Standard Penetration Number Rdwy. Roadway Trans, ----------------- NHW Normal High Water RPM Raised Pavement Markers UL Underwriters Laboratories No. Number R/R, Details 700-110 Mounting Exit Number Panels to Signs 639-002 Electric Power Service 700-120 Enhanced, . Sheet 26: Reduced bar 5C2 to a number 4 bar and relabeled as 4C2; Updated Bill of Reinforcing Steel Table accordingly; Added new Note 4, which reads "Bar 4C2 may be substituted with a number 5 bar

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/rstandardplansfy2025-26e.pdf?sfvrsn=b5544323_2
20 of 4273 results