4673 search results for Standard Specifications

F5007Advertisement

with respect to a protest of the terms, conditions, and specifications contained in a solicitation, that the 13.67% overall goal can be achieved through race neutral means, using standard competitive, for standard doors, and exhaust fans. • Battery backup cabinets for lighting, rollup doors (if possible

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/fco/f5007/f5007advertisement.pdf?sfvrsn=717ad20b_1

444008-4 Multi-Post Sign Calculations

Standard Plans Index 700-020 PROJECT # 444008-4-52-01 DESIGNED BY KF_________ DATE 03/28/24, Department of Transpor tation G E N ERAL IN F ORMAT ION: References: 1. AASHTO LRFD Specifications, ] 2. FDOT Structures Manual Volume 3 3.FDOT Standard Plans for Road and Br idge Construction, Index

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25115/444008-4-multi-post-sign-calculations.pdf?sfvrsn=b38937af_1

SR 60 CAP

) and implementation of FDOT’s Standard Specifications for Road and Bridge Construction. C. Construction, traffic control will be performed in accordance with the Florida Department of Transportation’s Standard

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25136/sr-60-cap.pdf?sfvrsn=1de57a21_1

Exhibit 904-1

WITH THE FDOT DESIGN MANUAL, FDOT STANDARD PLANS, APPLICABLE STANDARD SPECIFICATIONS, AND THE SETBACK

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/exhibit-904-1.pdf?sfvrsn=30fc0e14_1

Exhibit 904-1

WITH THE FDOT DESIGN MANUAL, FDOT STANDARD PLANS, APPLICABLE STANDARD SPECIFICATIONS, AND THE SETBACK

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/exhibit-904-1.pdf?sfvrsn=92b4b914_1

SP0090103LS

the established Standard Fuel Factor list posted on the State Construction Office website, on the Contractor’s Invoice on all items for which established standard fuel factors are posted, in these Specifications, the Engineer will apply a reduction in payment for the material in question based

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/workbook/sp0090103ls.pdf?sfvrsn=aa4bff2a_2

SP0090103LS

will be derived only from the established Standard F u e l F a c t or list posted on the State, r ’ s C e r t i f i e d M o n t h l y E s t i mate on all items for which established standard, in these Specifications, the Engineer will apply a reduction in payment for the material

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/workbook/sp0090103ls.pdf?sfvrsn=4b7c7253_0

0090103LS-2.impl

” when bids were received on this Contract. Gallonswillbederivedonlyfrom the established Standard Fuel, on the Contractor’s Certified Monthly Estimate on all items for which established standard fuel, of a material at a reduced payment level as defined in these Specifications, the Engineer will apply

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/implemented/0090103ls-2.impl.pdf?sfvrsn=a30efd95_0

0040032SS

: Notwithstanding 7-3 nor any other provision of the Standard Specifications, upon acceptance of a VECP, on the Department’s QPL or design standard indexes, or are otherwise generally known in the industry

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2006/january-2006/workbook/0040032ss.pdf?sfvrsn=588b223c_0

0040032SS

: Notwithstanding 7-3 nor any other provision of the Standard Specifications, upon acceptance of a VECP, on the Department’s QPL or design standard indexes, or are otherwise generally known in the industry

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2006/january-2006/workbook/0040032ss96f78d98e3964685a68b4bae8d6550b7.pdf?sfvrsn=298c98e8_0

0090103LS.impl

estimate. Gallonswillbederivedonlyfrom the established Standard Fuel Factor list posted on the State, standard fuel factors are posted on the State Construction Office website at the following URL, as defined in these Specifications, the Engineer will apply a reduction in payment for the material

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/implemented/0090103ls.impl.pdf?sfvrsn=f7ff6573_0

SS5610000

 561 COATING EXISTING STRUCTURAL STEEL. (REV 1-27-10) (FA 2-10-10) (7-10) The following new Section is added after Section 560 (of the Supplemental Specifications): SECTION 561 COATING EXISTING STRUCTURAL STEEL 561-1 Description. Coat existing structural steel in accordance, , apply a finish coat color meeting Federal Standard, 595B, Shade 36622, unless otherwise specified, to establish an initial job site cleanliness standard. When heavy metals are in the existing coatings, test

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/ss5610000.pdf?sfvrsn=c43fcaa8_0

SS5610000

 561 COATING EXISTING STRUCTURAL STEEL. (REV 1-27-10) (FA 2-10-10) (7-10) The following new Section is added after Section 560 (of the Supplemental Specifications): SECTION 561 COATING EXISTING STRUCTURAL STEEL 561-1 Description. Coat existing structural steel in accordance, , apply a finish coat color meeting Federal Standard, 595B, Shade 36622, unless otherwise specified, to establish an initial job site cleanliness standard. When heavy metals are in the existing coatings, test

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2012/january-2012/workbook/ss5610000.pdf?sfvrsn=739e295e_0

0090103LS.impl

Standard Fuel Factor list posted on the State Construction Office website at the following URL, ’s Invoice on all items for which established standard fuel factors are posted on the State, in the acceptance of a material at a reduced payment level as defined in these Specifications, the Engineer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/implemented/0090103ls.impl.pdf?sfvrsn=848e983f_0

Standard Naming Convention

Standard Naming Convention, INDEX A-Z Search Standard Naming Convention ITSFM Home New Users & Agencies Standards New Construction Operations, Specifications Introduction FDOT’s goal is to provide consistent and meaningful data across the state, so, all Standard Naming Conventions

https://www.fdot.gov/traffic/itsfm/standard-naming-convention

1c-c-UAM

www.fdot.gov/programmanagement/utilities; (d) American Petroleum (API) Standard 1104 – Welding of Pipelines, ://www.flrules.org/Gateway/reference.asp?No=Ref-06045, and 2016 Design Standard Index 625, Society for Testing and Materials (ASTM) D1586-11 Standard Test Method for Standard Penetration Test, for Tree Care Operations – Tree, Shrub, and Other Woody Plant Management – Standard Practices (Pruning, plans and specifications for proposed attachments to structures including a bridge load rating analysis

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2024-fall-construction-academy/1c-c-uam.pdf?sfvrsn=82374bd8_1

1c-c-UAM

www.fdot.gov/programmanagement/utilities; (d) American Petroleum (API) Standard 1104 – Welding of Pipelines, ://www.flrules.org/Gateway/reference.asp?No=Ref-06045, and 2016 Design Standard Index 625, Society for Testing and Materials (ASTM) D1586-11 Standard Test Method for Standard Penetration Test, for Tree Care Operations – Tree, Shrub, and Other Woody Plant Management – Standard Practices (Pruning, plans and specifications for proposed attachments to structures including a bridge load rating analysis

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2025-spring-construction-academy/1c-c-uam.pdf?sfvrsn=bde37ec5_1

1-16 Workbook REDLINE

FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS for ROAD and BRIDGE CONSTRUCTION, Department of Transportation Standard Specifications is revised as follows: January 2016 Workbook…..2, standard “Award and Execution”. *Contracts Office must approve. January 2016 Workbook…..4 8/27/2015, AM8/27/2015 9:09 AM8/26/2015 9:50 AM DEVELOPMENTAL SPECIFICATIONS SPY000008 Whencalledfor January 2016, AM SUPPLEMENTAL SPECIFICATIONS SS0000001 USAGE N O T E REMARKS 001DEFINITIONS A N D T E R M S

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/workbook/1-16-workbook-redline.pdf?sfvrsn=ec8ef657_2
20 of 4673 results