4650 search results for pavement design

715-002IndReviewPkg

(Yes/No) Other Standard Plans No FDOT Design Manual No Standard Specifications Daniel Strickland, . Poles are designed to support the following: Sarasota and St. Lucie Counties. Brevard, Broward, a. Certify that the Clamp, Frangible Transformer Base, and Base Shoe Design are capable of providing, Construction Joint (Typ.) Anchor Bolts Base Plate Pavement Only with Rigid Material 1" Exp. Jt, 120 160 (MPH) SPEED WIND HEIGHT (FT) MOUNTING DESIGN (FT) DEPTH FOUNDATION 8 9 9 40

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2026/715-002indreviewpkg.pdf?sfvrsn=c911e941_1

715-002FHWAReviewPkg

/No) Other Standard Plans No FDOT Design Manual No Standard Specifications Daniel Strickland Yes Basis, are designed to support the following: Sarasota and St. Lucie Counties. Brevard, Broward, Charlotte, that the Clamp, Frangible Transformer Base, and Base Shoe Design are capable of providing the required, Construction Joint (Typ.) Anchor Bolts Base Plate Pavement Only with Rigid Material 1" Exp. Jt, ) SPEED WIND HEIGHT (FT) MOUNTING DESIGN (FT) DEPTH FOUNDATION 8 9 9 40 40 40 140 120

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2026/715-002fhwareviewpkg.pdf?sfvrsn=90b1d288_1

715-002FHWAApproved

/No) Other Standard Plans No FDOT Design Manual No Standard Specifications Daniel Strickland Yes Basis, are designed to support the following: Sarasota and St. Lucie Counties. Brevard, Broward, Charlotte, that the Clamp, Frangible Transformer Base, and Base Shoe Design are capable of providing the required, Construction Joint (Typ.) Anchor Bolts Base Plate Pavement Only with Rigid Material 1" Exp. Jt, ) SPEED WIND HEIGHT (FT) MOUNTING DESIGN (FT) DEPTH FOUNDATION 8 9 9 40 40 40 140 120

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2026/715-002fhwaapproved.pdf?sfvrsn=9822ed4_1

Historical Item Averages Market Area 05

167,920.000 SY N SPECIAL DETOUR- TEMPORARY PAVEMENT 0102 2300 1 $17.21 $3,925,000.00 228,102.000 CY N, PAVEMENT MARKER, TYPE D 12/22/2025 Page: 1 Florida Department of Transportation Item Average Unit, 1103 1 $253.81 $7,360.49 29.000 SY Y COARSE AGGREGATE BASE SPECIAL DESIGN, 12" 0327 70 1 1 $30.46 $3,746.58 123.000 SY N MILLING EXISTING ASPHALT PAVEMENT, 1" AVG DEPTH 0327 70 2 2 $4.59 $580,695.70 126,390.000 SY N MILLING EXISTING ASPHALT PAVEMENT, 3 1/2" AVG DEPTH 0327 70 3 1 $3.98 $227,285.86

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/market-area/pdf/historical-item-averages-market-area-05.pdf?sfvrsn=71dccc23_5

D4 Public Hearing Report 2026 - Districtwide

- CONTINUING SERVICES LANDSCAPE ARCHITECTURE DESIGN/PRODUCTION Type of Work: PRELIMINARY ENGINEERING, DISTRICTWIDE Maintenance 413082-8 - PALM BEACH COUNTY PAVEMENT MARKERS PRIMARY Type of Work, $200,000 $200,000 424133-9 - TREASURE COAST STRIPING & PAVEMENT MARKERS Type of Work: ROUTINE, Maintenance D $150,000 Total for Project 453410-3 $150,000 453580-1 - TREASURE COAST REFLECTIVE PAVEMENT, REFLECTIVE PAVEMENT MARKERS Type of Work: ROUTINE MAINTENANCE Phase Fund Code 2026 2027 2028 2029 2030

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d4_documents/d4-public-hearing-report-2026---districtwide.pdf?sfvrsn=4cd5fcd2_3

5300200-722origind

Index Traffic Engineering Manual FDOT Design Manual Construction Project Administration Manual Basis of Estimate/Pay Items Structures Design Guidelines Approved Product List Materials Manual Will this revision necessitate any of the following: Design Bulletin Construction Bulletin Estimates, run stone, the Contractor may substitute non-reinforced concrete from existing pavement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/5300200-722origind.pdf?sfvrsn=793d8c28_2

9900301.origind

No Office Staff Contacted Standard Plans Index Traffic Engineering Manual FDOT Design Manual Construction Project Administration Manual Basis of Estimate/Pay Items Structures Design Guidelines Approved Product List Materials Manual Will this revision necessitate any of the following: Design, of their installation for “pedestal” type application or b. Seventeen to 19 feet above pavement grade

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/internal/9900301.origind.pdf?sfvrsn=2573b123_0

5300201FHWA

with this Section and in conformance with the lines, grades, design, and dimensions shown, calculations of the block and cable sizing design for approval. Comply with the National Concrete Masonry Association’s Design Manual for Articulating Concrete Block Revetment Systems, Second Edition, existing pavement that is to be removed and which meets the above requirements for commercial bedding

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/fhwa/5300201fhwa.pdf?sfvrsn=9613af68_1

9970000-724FHWA

Pressure sensing piezoelectric Pavement Operating Temperature Range Technical Data Sheet Minimum 0°F, , or direction. Electrical Components Electrical components are designed to be solid-state so, components are designed to be solid-state so that they will not be damaged by jolts and vibrations, of counts, classification, or direction. Electrical Components Electrical components are designed, of at least 15dB. Minimum of four ports designed for use with two pair of fibers, two strands transmit

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/fhwa/9970000-724fhwa.pdf?sfvrsn=29987614_1

6950000-724origind

FDOT Design Manual ConstructionProject Administration Manual Basis of Estimate/Pay Items Structures Design Guidelines Approved Product List Materials Manual Synopsis: Summarize the changes, .) Maintenance Specs Will this revision necessitate any of the following: Design Bulletin Construction (DCE, , classification, speed, or direction. Provide electrical components of solid-state design, constructed, of the sensor on the pavement and routes for lead-in cables. Do not allow the saw cut in the pavement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/internal/6950000-724origind.pdf?sfvrsn=3e61addf_1

Collier County Draft Tentative WP FY27-31

: INTERCHANGE IMPROVEMENT Phase Funding Source 2027 2028 2029 2030 2031 Design Build State $2,572,500, 41) FROM GOLDEN GATE PARKWAY TO SOUTH OF 3RD AVE Type of Work: FLEXIBLE PAVEMENT RECONSTRUCT, #030307 TO S OF BRIDGE #030299 Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2027, - SR 29 FROM S OF I-75 TO N OF BRIDGE NO 030298 Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase, : PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2027 2028 2029 2030 2031 Construction State

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/district-1-dtwp-fy-27-31/collier-county-draft-tentative-wp-fy27-31.pdf?sfvrsn=2125da39_1

44728715201-PLANS-02-SPM

AND PAVEMENT MARKING ROADWAY LOCATION OF PROJECT STATE OF � � � No 44016 E S N E C I L E, CONTRACT NO. CONSTRUCTION NO. SHEET YEAR FISCAL 25 CITY LAKE SIGNING AND PAVEMENT MARKING PLANS, OF FLORIDA DEPARTMENT OF TRANSPORTATION RIGID PAVEMENT RECONSTRUCTION FROM INDUSTRIAL CANAL TO SAGAMORE, /design/standardplans Standard Plans for Road Construction and associated IRs are available, , FY2024-25 Standard Plans for Road and SHEET DESCRIPTION SHEET NO. PAVEMENT MARKING PLANS INDEX

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26111/44728715201-plans-02-spm.pdf?sfvrsn=9ce18c25_1

District 1 Draft Tentative WP FY27-31

of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2027 2028 2029 2030 2031 Construction, COUNTY LINE Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2027 2028 2029 2030 2031, 2028 2029 2030 2031 Design Build State $2,313,059 Preliminary Engineering State $340,090 $100,000, 2030 2031 Design Build State $2,572,500 Total for Project 425843-2 $2,572,500 Draft Tentative Five, of Work: FLEXIBLE PAVEMENT RECONSTRUCT. Phase Funding Source 2027 2028 2029 2030 2031 Environmental

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/district-1-dtwp-fy-27-31/district-1-draft-tentative-wp-fy27-31.pdf?sfvrsn=ac026c41_1

6600201-3.FHWA

asphalt and concrete pavement. Ensure sealant is furnished in a one part or pre-measured two part, when applied and is designed to be installed flush with the roadway surface. Ensure that loop sealant, in both asphalt and concrete pavement. Ensure sealant is furnished in a one part or pre-measured two, when applied and is designed to be installed flush with the roadway surface. Ensure that loop

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/fhwa/6600201-3.fhwa.pdf?sfvrsn=cb07e5e2_0

Workbook-114FINAL

PAVEMENT. (REV 8-31-99) (FA 2-14-00) (1-14) Insert Information Required. Changes to: 327-1, 327-6, to be retained. Use all, tons, square yards MILLING OF EXISTING ASPHALT PAVEMENT. (REV 12-1-93, with Traffic Monitoring Sites January 2014 Workbook…..15 2/12/2014 10:41 AM FOR DESIGN BUILD PROJECTS ONLY, products on asphalt paving machines in order to prevent spills from affecting pavement integrity, ) Changes to 347. SS3470000 All Jobs Rolled into the 1-14 eBook. 350 CEMENT CONCRETE PAVEMENT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/workbook/workbook-114final.pdf?sfvrsn=c03ec928_0

Workbook-114REDLINE

2/12/2014 10:40 AM MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (1-131-14) Insert, MILLING OF EXISTING ASPHALT PAVEMENT. (REV 12-1-93) (1-131-14) Changes to: 327-2. SP3270200 Use when, :40 AM FOR DESIGN BUILD PROJECTS ONLY DB SPECIAL PROVISIONS SP0000000DB USAGE NOTE REMARKS, affecting pavement integrity and to avoid environmental hazards. 334 SUPERPAVE ASPHALT CONCRETE, PAVEMENT. (REV 11-15-12) (FA 1-28-13) (7-13) Changes to 350-2. SS3500200 All Jobs Rolled

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/workbook/workbook-114redline.pdf?sfvrsn=36d4202_0

9970000-724IMPL

Pavement Operating Temperature Range Minimum 0°F to +150°F Output Signal Minimum +200mV or produce, , or direction. Electrical Components Electrical components are designed to be solid-state so, , classification, speed, or direction. Electrical Components Electrical components are designed to be solid, , or direction. Electrical Components Electrical components are designed to be solid-state so, ports designed for use with two pair of fibers, two strands transmit, the other two strands receive

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/implemented/9970000-724impl.pdf?sfvrsn=fff0cf45_1

0040301Admin.impl

discretion any Proposal submitted that proposes a change in the design of the pavement system, , life, reliability, economy of operation, ease of maintenance, aesthetics and necessary standard design, . 3.anitemization of the changes, deletions or additions to plan details, plan sheets, design standards, analyses be performed by a prequalified consultant in the applicable class of work. Support all design, Approved Product List (APL) or Design Standard Indexes, or are otherwise generally known

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/implemented/0040301admin.impl.pdf?sfvrsn=266ea61a_0

PublicHearing_CITRUS_COUNTY_Summary

: RESURFACING Phase Funding Source 2027 2028 2029 2030 2031 Design Build State $1,506,000 Total for Project, TO NORTH OF SR44 Type of Work: RIGID PAVEMENT RECONSTRUCTION Phase Funding Source 2027 2028 2029 2030, RIVER AIRPORT - TAXIWAY A REHAB DESIGN Type of Work: AVIATION PRESERVATION PROJECT Phase Funding, for Project 452374-1 $120,000 456121-1 - DESIGN AND CONSTRUCT T-HANGARS - INVERNESS AIRPORT Type of Work, State $1,500,000 Total for Project 456121-1 $3,000,000 456120-1 - DESIGN AND CONSTRUCTION

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d7wpph/publichearing_citrus_county_summary.pdf?sfvrsn=b5511aee_1

5-21-24 OOD24-01 Mandatory Revision No. 1 (On-The-Job Training)

, FL 32399-0450 JARED W. PERDUE, P.E. SECRETARY www.fdot.gov OFFICE OF DESIGN BULLETIN 24-01, , District Directors of Transportation Development, District Design Engineers, District Construction Engineers, District Maintenance Engineers, District Pavement Engineers, District Consultant Project Management Engineers, District Structures Design Engineers, District Roadway Design Engineers, District, : Michael Shepard, P.E., Director, Office of Design COPIES: Will Watts, Dan Hurtado, Tim Lattner, Rudy

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/resources/bulletins/2024/5-21-24-ood24-01-mandatory-revision-no-1-(on-the-job-training).pdf?sfvrsn=b48cdd28_1
20 of 4650 results