5071 search results for Standard Specifications

9160000SS

67-22 unless otherwise specified in the plans and/or Specifications for the hot mix asphalt product, stable anti-strip additive by weight of PG binder unless specifications for the hot mix asphalt product, and these Specifications. The requirements of these Specifications do not apply to Recycle Agents at this time, of each PG binder shipped in accordance with AASHTO M-320 and 916-1.1 of these Specifications, as applicable by these Specifications. SUPERPAVE PG ASPHALT BINDER Test and Method Conditions

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2006/january-2006/workbook/9160000ss.pdf?sfvrsn=d70e347c_0

SS9160000

Superpave PG asphalt binder grade PG 67-22 unless otherwise specified in the plans and/or Specifications, by weight of PG binder unless specifications for the hot mix asphalt product requires testing by FM 1-T, of these Specifications for a Quality Control Program do not apply to Recycle Agents at this time. 916-1.3.1, testing of each PG binder shipped in accordance with AASHTO M 320 and 916-1.1 of these Specifications, shipped by the supplier in accordance with either: (1) AASHTO T 202 Standard Test Method

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/ss9160000.pdf?sfvrsn=fce225b5_0

SS9160000

and/or Specifications for the hot mix asphalt product. For all PG binder used in all hot mix asphalt, silicone may, additive by weight of PG binder unless specifications for the hot mix asphalt product requires testing, of these Specifications for a Quality Control Program do not apply to Recycle Agents at this time, of these Specifications. Results of Specification Compliance Testing shall be available to the supplier within five, binder shipped by the supplier in accordance with either: (1) AASHTO T 202 Standard Test Method

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2012/january-2012/workbook/ss9160000.pdf?sfvrsn=d7d3935b_0

DB - Prescoping questions CLEAN 4-25-2025

and Standard Plans Instructions Index 534-200) •District Environmental Manager •District Noise Specialist, Perimeter Walls? If so and the required wall deviates from Standard Plans Index 534- 250, provide, , etc. in the RFP. (Standard Plans Instructions Index 534-250) •District Environmental Manager, corrosion protection and materials specifications and with the SDO for other related design and detailing, and include requirements in the RFP. (SDG 3.14.1.B) S.23Determine whether Standard Plans Index 471-030

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/designbuild/dbrules/db---prescoping-questions-1-31-2024-clean.docx?sfvrsn=5d1c3a29_2

Chapter7s4Redline

as allowed by the Standard Specifications is allowable for work paid from funds drawn against any, , Section 3 - Supplemental Agreements and Unilateral Payments Section 4 of the Standard Specifications for Road and Bridge Construction Procedure No. 375-020-010, Errors, Omissions, and Contractual, Supplemental Agreement. This re-encumbering of the "borrowed" funds is to be done through the standard, with the same date. No Contingency Supplemental Agreement shall be dated with the same date as a Standard

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newhistory/chapter7s4redline.pdf?sfvrsn=edc444e6_3

Chapter7s4

Agreements and Unilateral Payments Section 4 of the Standard Specifications for Road and Bridge, . A Bond markup as allowed by the Standard Specifications is allowable for work paid from funds drawn, . This re-encumbering of the "borrowed" funds is to be done through the standard encumbrance request, with the same date as a Standard Supplemental Agreement or Unilateral Payment to the contract. Contingency Supplemental Agreements, Standard Supplemental Agreements and Unilateral Payments

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/chapter7s4.pdf?sfvrsn=1498bdfa_6

CPAM 7.4 Clean 2022-PrC

Agreements and Unilateral Payments Section 4 of the Standard Specifications for Road and Bridge, . A Bond markup as allowed by the Standard Specifications is allowable for work paid from funds drawn, . This re-encumbering of the "borrowed" funds is to be done through the standard encumbrance request, with the same date as a Standard Supplemental Agreement or Unilateral Payment to the contract. Contingency Supplemental Agreements, Standard Supplemental Agreements and Unilateral Payments

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/cpam-7-4-clean-2022-prc.pdf?sfvrsn=661b3ce7_3

3460202.FHWA

to the standard laboratory curing methods. Submit the resistivity test specimens at least 7 calendar days prior, that the concrete batches meet all plastic property requirements of the specifications and maintain, mix design meets the requirements of the specifications. For the proposed mix design, state, test results indicating the average compressive strength is greater than two standard deviations, the specified minimum plus two standard deviations, return to the maximum production quantity represented

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/fhwa/3460202.fhwa.pdf?sfvrsn=82f66960_0

Structures-Construction academy Randell 2025 with notes1

key sections of our Construction Specifications (Standard Specifications for Road and Bridge, • Educate about structures construction • Review Specifications and CPAM • Review, at some parts of our Construction Specifications and the Specification Sections: 5 –Control of the Work, —DELIVERY TICKET -Spec 346-6 speaks to Delivery Certification for concrete -here we see a standard paper, . -Something else to keep in mind is Standard Plans 450-199 (go to website) which shows us the design

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2024-fall-construction-academy/structures-construction-academy-randell-2025-with-notes1.pdf?sfvrsn=22864be9_1

Structures-Construction academy Randell 2025 with notes2

key sections of our Construction Specifications (Standard Specifications for Road and Bridge, • Educate about structures construction • Review Specifications and CPAM • Review, at some parts of our Construction Specifications and the Specification Sections: 5 –Control of the Work, —DELIVERY TICKET -Spec 346-6 speaks to Delivery Certification for concrete -here we see a standard paper, . -Something else to keep in mind is Standard Plans 450-199 (go to website) which shows us the design

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2024-fall-construction-academy/structures-construction-academy-randell-2025-with-notes2.pdf?sfvrsn=1cd80f3b_1

330090405FHWA

Tallahassee, Florida 32312 Re: State Specifications Office Section: 330 Proposed Specification, (Limited Access Roads) and Modified Special Provision (Non-Limited Access Roads) into the Standard Specifications. This coincides with the removal of the Ride Number system. Please review and transmit, Specifications Engineer DS/dh Attachment cc: Florida Transportation Builders' Assoc. State Construction, unless otherwise stated in the Specifications. If the project’s method of acceptance is by laser

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/review/fhwa/330090405fhwa.pdf?sfvrsn=d1d76b9d_1

Agency Term Contract - Industrial Vegetation Management Products for Highway Rights of Way

) PRODUCT REQUIREMENTS/SPECIFICATIONS Items furnished shall be standard products of the manufacturer, compliance with specifications by marking with a check mark): Yes No 1 Products bid meet, , with their bid, complete specifications and descriptive technical literature for the equipment, specifications indicated herein must be clearly pointed out; otherwise, it will be considered that items offered are in strict compliance with these specifications, and successful bidder will be held

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procurement/files_agency_term_contracts/dot-itb-21-9043-vm.pdf?sfvrsn=4673dfd9_15

PMG PDF V9

project schedule, meets or exceeds industry standard for quality, is delivered at a fair, (e.g., decorative lighting (instead of standard lighting), mast arms (instead of strain poles, is the Department’s standard system for documenting, transmitting, and tracking project commitments. The PM can

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/designsupport/pmresources/pmg-pdf-v9.pdf?sfvrsn=a503f353_1

Chapter9

structures is controlled by Section 5-3 of the Standard Specifications, which reads: “reasonably close, By Standard Specifications, the tolerance for earthwork within a stormwater management facility, with the Standard Specifications. If the standard tolerance will substantially reduce the retention or treatment, . 2. Conservatively, assume the SHWT is 2.5 feet below ground. The standard freeboard is given, for this example) constrains these volumes. The standard hydraulic gradient clearance is given

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/drainage/files/drainagedesignguide/chapter9.pdf?sfvrsn=c244a11_7

1-DRBs October 2023 Construction Academy

standard bidding document, “Procurement of Wo r ks,” provided three options for the settlement, clear contract specifications, operating guidelines, and operating procedures for DRBs Ty p e s, t e Contract Provisions Related to DRBs • Standard Specification 4-3.2 • Standard Specification, Provision for Statewide DRBs Standard Specification 4-3.2 Standard Specification 5-12 Standard, in the Mid-2000s were toward Performance and End Result Specifications • FDOT looked for Contractor Wa r ranties

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2023-construction-academy/fall-2023/1-drbs-october-2023-construction-academy.pdf?sfvrsn=b8011557_1

521-405

: REVISION LAST of STANDARD PLANS FY 2024-25 SHEET INDEX 2 sp. @ 2 sp. Dowel Bars 6D Spacing, in accordance with the Specifications. REINFORCING STEEL: Reinforcing steel shall be ASTM A615, Grade 60, V I S I O N DESCRIPTION: REVISION LAST of STANDARD PLANS FY 2024-25 SHEET INDEX GUARDRAIL, Reinforcing Not Shown For Clarity) OPEN JOINT EXPANSION DOWEL DETAIL Specifications. bar and hot-dip, E V I S I O N DESCRIPTION: REVISION LAST of STANDARD PLANS FY 2024-25 SHEET INDEX

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/idx/521-405.pdf?sfvrsn=e6521bd2_1

10-DRBs FDOT Construction Academy Spring 2024

as the “Gold Standard” in the US; the governmental agency leader in the effective use of DRBs •FDOT has developed clear contract specifications, operating guidelines, and operating procedures, We bsite Contract Provisions Related to DRBs •Standard Specification 4-3.2 •Standard, Provision for Statewide DRBs Standard Specification 4-3.2 Standard Specification 5-12 Standard, Specifications •FDOT looked for Contractor Wa r ranties •Bonding Capacity was a big issue

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2024-spring-construction-academy/10-drbs-fdot-construction-academy-spring-2024.pdf?sfvrsn=dd11f6a6_1

Dev564DCSS

of the Operators and Applicators 5.Site-Specific Coatings Plan 6. Job Reference Standard(s) (JRS). 564-3.2, Standard (JRS), each TSC operator must meet the following requirements: 1. Spray specimens that meet project specifications for wire type and coating thickness that pass the destructive bend, Job Reference Standard (JRS): Include the configuration, surface preparation, documentation, type, coats and apply caulk as described in Specifications Section 560. Remove lubricant and other

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/otherfdotlinks/developmental/files/dev564.pdf?sfvrsn=8c2f44ba_6

44912015201-PLANS-02-SIGNINGMARKING

PROJECT MANAGER: ENGINEER OF RECORD: PAVEMENT MARKING PLANS SIGNING AND GOVERNING STANDARD SPECIFICATIONS: http://www.fdot.gov/programmanagement/Implemented/SpecBooks for Road and Bridge Construction at the following website: Florida Department of Transportation, FY 2024-25 Standard Specifications GOVERNING STANDARD PLANS: Component Standard Plans for Bridge Construction are included in the Structures Plans following website: http://www.fdot.gov/design/standardplans Standard Plans

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25127/44912015201-plans-02-signingmarking.pdf?sfvrsn=9a109b0b_1

7-DRBs FDOT Construction Academy Fall 2024

as the “Gold Standard” in the US; the governmental agency leader in the effective use of DRBs • FDOT has developed clear contract specifications, operating guidelines, and operating procedures, Review Board We b s i t e Contract Provisions Related to DRBs • Standard Specification 4-3.2 • Standard Specification 5-12 • Special Provision for Project DRBs • Special Provision for Regional DRBs • Special Provision for Statewide DRBs Standard Specification 4-3.2 Standard Specification 5-12

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2024-fall-construction-academy/7-drbs-fdot-construction-academy-fall-2024.pdf?sfvrsn=e77cbb91_1
20 of 5071 results