4274 search results for REPORT NUMBER

BCR South - Virtual PIM#2 Draft Presentation V5 - May 2024

– Minor impacts *Noise and Vibration – Minor changes due to increased number of trains, but below FTA, Action Number Of Incidents Went Around the Gate 22 Went Thru the Gate 1 Stopped on Crossing 9, ’s Impact Criteria Documented Results in Noise and Vibration Study Report • Project does, Corridor RAIL NOISE ANALYSIS 41 64.7 65.4 NUMBER OF TRAIN OPERATIONS (Traveling 20 Miles Per Hour

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/projects_browardcommuterrail/bcr-south---virtual-pim-2-draft-presentation-v5---may-2024.pdf?sfvrsn=3a4646c8_1

Nondiscrimination Handbook for Local Agencies

the Coordinator directly to the CEO. This shows that while the Coordinator can have any number of direct reports in daily work duties, for nondiscrimination purposes he or she can report directly, action, if any. • Lists of staff nondiscrimination training including the date, number of attendees, : 1. Number or proportion of LEP persons eligible to be served or likely to be encountered

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/lap/title-vi/nondiscrimination-handbook-for-local-agencies.pdf?sfvrsn=2fe248ea_17

SS4500000

assigned LOT number(s) with the heat of the material represented. Verify that the report represents, that the calibration report includes, the serial number of the equipment that is calibrated, calibration chart, Documents. Also, maintain a daily activity report detailing the results of the daily Quality Control, the identification of the bed, type of fabricated products, the complete Financial Project Identification Number, jack identification number, date prestressing strands were stressed, temperature at the time

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2009/january-2009/workbook/ss4500000d6887b086ab44d6d9f958a35d885e6da.pdf?sfvrsn=43eac8f2_0

SS4500000

: Obtain and maintain for each LOT a certified mill analysis, physical property test report and the manufacturer’s assigned LOT number with the heat of the material represented. Verify that the report, and ASTM E 74. Ensure that the calibration report includes, the serial number of the equipment, of the Contract Documents. Also, maintain a daily activity report detailing the results of the daily, of fabricated products, the complete Financial Project Identification Number, jack identification number

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2012/january-2012/workbook/ss4500000.pdf?sfvrsn=54391946_0

Underwater Noise Level Study During Impact Pile Driving (completed by University of North Florida)

 Final Report Underwater Noise Level Study During Impact Pile Driving FDOT Contract No. BDV34, verification line through the data. However, there were a limited number of vibrational data in both this study and the CalTrans reports. There were also a limited number of steel percussion drives, driving event. Accompanying this report is a modified version of the NOAA/NMFS calculator, . In-water pile driving is the major focus of this report. 1.3 Developments in Florida In December

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/protected-species/underwater-noise-level-study-during-impact-pile-driving-(completed-by-university-of-north-florida).pdf?sfvrsn=2390afff_1

2023_Florida's EVIDP

eight billion gallons of gasoline annually 4 , it also claims the second- highest number of EV, and installation of new chargers. Since 2020, the number of available DCFCs increased by 115 percent, which, conducted to date are summarized below. Community Engagement Outcomes Report Since the September 14, 2022

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/emergingtechnologies/evprogram/2023_florida's-evidp.pdf?sfvrsn=61d85fb5_3

D4550000.do

the condition of the structures: one report before beginning foundation construction operations and a second report after completing foundation construction operations. The Department will take ownership, with subsequent construction operations. Furnish the Engineer a written report by the divers indicating, . Ensure that the type, number, and location of the strain gauges are as shown in the plans, : Submit a preliminary static load test report to the Engineer within five days after completing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2003/january-2003/workbook/d4550000.do629e031f95d84a48930db5c06e373b1d.pdf?sfvrsn=19a57107_0

App I BCR South_Safety_Analysis_Memorandum

2-2 summarizes the number of crashes by type and the average number of crashes. The most common, . Figure 2-3 shows the locations and number of incidents from the FRA database within the BCR South, and fatalities are shown in red with the number next to the circle. The predominant trend related, 2-4 Summary of FRA 5-Year Incident Behavior Trends Behavior Action Number of Incidents Went

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/projects_browardcommuterrail/appendices-environmental-assessment/app-i-bcr-south_safety_analysis_memorandum.pdf?sfvrsn=ac41ea7f_1

ProcurementGuidanceforTransitAgencies20150924

procedures: (a) Competition. The recipient must obtain price or rate quotations from an adequate number, . (b) Uncertain Number of Sources. Uncertainty about whether more than one bid will be submitted, . Proposals are solicited from an adequate number of qualified sources. (d) Evaluation Method, Sources. Bids are solicited from an adequate number of known suppliers. (c) Adequate Specifications, ) at City Requisition Number: Reply Requested By Date: Reply by Time: am pm QUOTE ON ALL OR NONE Item

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/transit/pages/procurementguidancefortransitagencies20150924_ecd830af-1b8e-456b-9588-b22592709ce2.pdf?sfvrsn=5a8027c0_0

43498615201 Plans Rigid Pavt MP13.988-14.472_PhaseIV

SPC ALT ITEM NUMBER ITEM DESCRIPTION UNIT 43498615201 QUANTITY TOTAL 0101- 1- MOBILIZATION, ) : 43498615201 COUNTY : HIGHLANDS 0001 SUMMARY OF ROADWAY SPC ALT ITEM NUMBER ITEM DESCRIPTION UNIT, ANTICIPATED NON-STORMWATER 5. NON-STORMWATER DISCHARGES USE THE SWPPP CONSTRUCTION INSPECTION REPORT, REQUIRED REPORTS AND COMPLETE SUBMIT A WEEKLY REPORT TO THE DEPARTMENT DOCUMENTING THE DAILY, AND TURBIDITY READINGS SHALL BE RECORDED ON THE CONSTRUCTION INSPECTION REPORT REEVALUATED

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/25122/43498615201-plans-rigid-pavt-mp13-988-14-472_phaseiv.pdf?sfvrsn=196639c_1

Pt1Ch12_073124_clean

that the FDOT NEPA document, or a State Environmental Impact Report (SEIR), will address the Cooperating

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/pdeman/2024/pt1ch12_073124_clean.pdf?sfvrsn=a2750636_1

FDOT_RSP_CH 3_ADA (Oct)

Report.pdf (dot.gov) 3 Midwest Regional Rail Plan Final Report | FRA (dot.gov) 11 Chapter 3: Proposed, In July 2022, the Southeast Corridor Commission released a follow-up report, the Development Strategy for High-Performance Rail in the Southeast.4 The report presents a 30-year passenger rail, to Chattanooga, Tennessee ▪ Phase 5: Chattanooga to Nashville, Tennessee The report notes, for expanding service and adding 160 new stations to double the number of passengers that state

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/rail/plans/rail/rail-system-plan-2023/rsp-october-version/fdot_rsp_ch-3_ada-(oct).pdf?sfvrsn=b5e89809_2

Martin

Class: Work Mix: NO R/W NEEDED THIS PROJECT WILL INCREASE THE NUMBER OF TRAVEL LANES FROM 6 TO 8, DATA COLLECTION 22-02=ALTERNATIVE CORRIDOR EVALUATION REPORT (ACER) 22- 03=PD&E LFA WITH MARTIN, Report In Progress 20 11/13/2025 12/12/2025 -10 Friday, December 5, 2025 Page 15 of 16 FPID / FM, In Progress 20 9/8/2025 10/3/2025 -66 PM Prepare Landscape Concept Report (includes ODA) Not Started 20

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/utilities/docs/d4/martin.pdf?sfvrsn=c2601762_4

2024FDM212Intersections

Alternative Designs and Alternative Intersections/Interchanges: Informational Report (AIIR, may have multiple approaches and typically marked with a supplemental signing stating the number

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm212intersections.pdf?sfvrsn=34ece1a6_1

2024FDM220RR

in the number of lanes Standards and criteria for design, placement, installment and operation of traffic, Development Report (BDR)/30% Structures Plans. Prepare the Structures Plans in accordance with the criteria

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm220rr.pdf?sfvrsn=f469ad79_1

Quadguard Elite - NCHRP350 - (Temporary) Drawings (01.01.2013)

TIHAT HIGHWAY SAFETY HARDWARE TESTED TO NCHRP REPORT 350 TL-3 AT 62.1 mph IS ELIGIBLE FOR FHWA, STOCK NO. DESCRIPTION REQ'D TABLE SYSTEM ASSY NO. ITEM NUMBER a I g I 12 I 13 I 14 QUANTITY 5

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/maintenance/rdw/ispe/crash-cushion/quadguard-elite---nchrp350---(temporary)-drawings-(01-01-2013).pdf?sfvrsn=71657a72_1

2025FDM220RR

in the number of lanes Standards and criteria for design, placement, installment and operation, Report (BDR)/30% Structures Plans. Prepare the Structures Plans in accordance with the criteria

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm220rr.pdf?sfvrsn=72c60145_3

STIC-Incentive-Program-Opportunities

as other pertinent local, tribal, or federal agencies with significant number of miiles of high, Recruitment peer exchange; and (3) a peer exchange/report on Adapting the 1981 P&G and IWRM to Capital

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2019/stic-incentive-program-opportunities.pdf?sfvrsn=cc08a307_1
20 of 4274 results