1087 search results for UNIT COST PER PAY ITEM

7000000.FHWA2

will be included in the Contract unit price of the item to which it is incidental. Notify the Engineer, unit price per each for sign panels, furnished and installed, will include furnishing the sign panels, hardware, and labor necessary for a complete and accepted installation. The contract unit price, - SinglePostSign,perAssembly. ItemNo.700-2- MultiPostSign,perAssembly. ItemNo.700-3- SignPanel, in this Section, including all incidentals necessary for the complete item. 700-2.24 Overhead Signs

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/fhwa/7000000.fhwa2.pdf?sfvrsn=c8af2289_0

3371100.FHWA

Gsb of the mixes used for the pay item. Thebidprice for the asphalt mix will include the cost, of the mixture, in tons. For each pay item, the pay quantity will be based on the quantity placed on the project, limited to 105% of the adjusted plan quantity for the pay item. For dense-graded mixes, the adjusted plan quantity will be determined by dividing the pay item’s original plan quantity, , then multiplying it by the tonnage-weighted average Gmm of the mixes used for the pay item. For open graded

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/january-2017/review/fhwa/3371100.fhwa.pdf?sfvrsn=dde35e49_0

3340700.FHWA

of the mixture, in tons. For each pay item, excluding overbuild, the pay quantity will be based on the quantity placed on the project, limited to 105% of the adjusted plan quantity for the pay item. The adjusted plan quantity will be determined by dividing the pay item’s original plan quantity, , then multiplying it by the tonnage-weighted average Gmm of the mixes used for the pay item, , for the certified Superpave asphalt concrete pay item. Submit this certification to the Engineer no later than

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/january-2017/review/fhwa/3340700.fhwa.pdf?sfvrsn=f88545f6_0

3371100.origind

Pay Item changes? Yes No Estimates staff contacted (name): W i l l t h e p r o posed revision, , in tons. For each pay item, the pay quantity will be based on the quantity placed on the project, limited to 105% of the adjusted plan quantity for the pay item. For dense-graded mixes, the adjusted plan quantity will be determined by dividing the pay item’s original plan quantity (including any, by the tonnage-weighted average Gmm of the mixes used for the pay item. For open graded mixes, the adjusted

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/january-2017/review/internal/3371100.origind.pdf?sfvrsn=8da21c24_0

Chapter7s4

7.4.6.1. Per the Work Program Instructions, the Initial Contingency Amount Pay Item shall, against the Initial Contingency Amount Pay Item will be per CPAM Section 7.4.9.7. The designer must not associate any pay item notes or work items identified in the plans with this pay item. The District, not include lump sum items without a detailed itemization stating the quantities and unit prices the lump sum item was based on.  Work Orders should not used to add pay items to a project

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/chapter7s4.pdf?sfvrsn=1498bdfa_6

CPAM 7.4 Clean 2022-PrC

7.4.6.1. Per the Work Program Instructions, the Initial Contingency Amount Pay Item shall, against the Initial Contingency Amount Pay Item will be per CPAM Section 7.4.9.7. The designer must not associate any pay item notes or work items identified in the plans with this pay item. The District, not include lump sum items without a detailed itemization stating the quantities and unit prices the lump sum item was based on.  Work Orders should not used to add pay items to a project

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/cpam-7-4-clean-2022-prc.pdf?sfvrsn=661b3ce7_3

Chapter7s4Redline

will be per CPAM Section 7.4.9.7. The designer must not associate any pay item notes or work items, a detailed itemization stating the quantities and unit prices the lump sum item was based, adjustment or adjustments be added to the pay estimate. The total of the unit prices of the added items, against the Initial Contingency Amount Pay Item or a Contingency Supplemental Agreement. 7.4.6 Funding Work Orders may be funded through an Initial Contingency Amount Pay Item (999- 25

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newhistory/chapter7s4redline.pdf?sfvrsn=edc444e6_3

2023 BOE Manual

. For Summary of Pay Items Report requirements, see FDM 902. Item Average Unit Cost by Item Number, . Item Average Unit Cost by Item Range This Webgate report provides a historical average for a pay, Pay Item Structure/Template 2.5 Pay Item Ranges and Other Variables 2.6 Displaying Pay Items, File 2.8 Pay Items and Specifications Chapter 3 – Project and Proposal Cost Estimates 3.1 General, , 2016 will start fiscal year 2017. Fixed Price Pay Item: A pay item where the unit price is set

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/publications/boe/2023-boe-manual.pdf?sfvrsn=3244e10b_1

SS0090200

of payment clause for the item, include in the Contract unit price (or lump sum price) for the pay item or items the cost of all labor, equipment, materials, tools and incidentals required for the complete, of each type of fuel for each pay item is estimated by multiplying the Department’s standard fuel factor for that pay item by the quantity of that pay item. On Contracts with an original Contract Time, and Asphalt Rubber Membrane Interlayer pay items. Submit this certification to the Engineer no later

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/ss0090200.pdf?sfvrsn=feee146e_0

11-Contract Modifications - Construction Academy 2024

Costs Analysis • A detailed itemization of all items of work including quantities and unit prices, the pay items involved along with quantities, unit prices, any time impacts, and the basis, this either way. 1. Can use pay item approach – Qty, Unit Prices, and Summary 2. Can use resource, AGREEMENTS OR UNILAT ERALS PAY M ENTS SHOULD BE USED FOR THE FOLLOWING ITEMS OTHERWISE A WORK ORDER CAN, SUPPLEMENTA L AGREEMENTS OR UNILAT ERALS PAY M ENTS SHOULD BE USED FOR THE FOLLOWING ITEMS OTHERWISE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2024-spring-construction-academy/11-contract-modifications---construction-academy-2024.pdf?sfvrsn=1d18f93d_2

2018FDM123EngDsnEstProc

contains design aids, notes, the pay item structure, a list of currently open pay items, and computation information to aid the engineer in preparing the cost estimate. Pay items for the various, item description, unit of measure, and basis of payment may be required. If a desired pay item, breakdown of pay item quantities may be necessary to identify those pay items or quantities, of Pay Items f or the UWHC Agreement. T he cost of these items will be included in the lead project

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2018/2018fdm123engdsnestproc.pdf?sfvrsn=3a03a4be_4

2022 BOE Manual

for a specific pay item. Item Average Unit Cost by Item Range This Webgate report provides, Pay Item Structure/Template 2.5 Pay Item Ranges and Other Variables 2.6 Displaying Pay Items, 2.8 Pay Items and Specifications Chapter 3 – Project and Proposal Cost Estimates 3.1 General, will start fiscal year 2017. Fixed Price Pay Item: A pay item where the unit price is set by the Department at the project level. The pay item appears on the proposal/bid documents with a set unit

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/publications/boe/2022-boe-manual.pdf?sfvrsn=81dd48d_1

0090203DB.FHWA

on the unit prices as determined using the six-month State wide pay item averages. The dates, based on the unit prices as determined using the six month State wide pay item averages (using, -month State wide pay item averages. The dates will be the six months prior to the letting date, is plus or minus 5%Asphalt pay quantity adjustments apply to asphalt items listed in Sections 234, 334, , Rreductions in pay will be determined per sublot by applying a proportional reduction in payment

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/fhwa/0090203db.fhwa.pdf?sfvrsn=b6d7db7e_0

1021102.origind

No. 102-150- Portable Regulatory Sign - per each per day. Item No. 102-150- Radar Speed Display Unit, Construction Project Administration Manual Basis of Estimate/Pay Items Structures Design Guidelines, lighting shown in the Plans. 102-13.243 Payment Items: Payment will be made under: Item No. 102- 1, - Commercial Material for Driveway Maintenance - per cubic yard. Item No. 102- 14- Traffic Control Officer - per hour. Item No. 102- 30- Temporary Highway Lighting - lump sum. Item No. 102- 60- Work

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/internal/1021102.origind.pdf?sfvrsn=9399a766_0

2024 BOE Manual

: The pay items must be entered individually, rather than as a group. Item Average Unit Cost by Item Range, Pay Item Structure/Template 2.5 Pay Item Ranges and Other Variables 2.6 Displaying Pay Items, 2.8 Pay Items and Specifications Chapter 3 – Project and Proposal Cost Estimates 3.1 General 3.2, 1, 2024 will start fiscal year 2025. Fixed Price Pay Item: A pay item where the unit price is set, with a set unit price and in the bidder’s Expedite file. Fixed price pay items contain the words “Do

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/publications/boe/2024-boe-manual.pdf?sfvrsn=95ad35c8_1

2025 BOE Manual

Pay Items General Information 2.1 General 2.2 Pay Item Format 2.3 Pay Item Measurement, Changing/Updating Pay Item Descriptions in the Master File 2.9 Pay Items and Specifications Chapter 3, and Requests 6.1 General 6.2 Pay Item Request Process 6.3 Generic Pay Items for Utility Work 6.4 Developmental Pay Items and Special Use Pay Items Chapter 7 – Pay Item Documentation Topic, . Fixed Price Pay Item: A pay item where the unit price is set by the Department at the project level

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/publications/boe/2025-boe-manual.pdf?sfvrsn=2c3b7dfa_1

Other 02

 District: 09 County: 99 DISTRICT/STATE WIDE Pay Items Pay Item Description Total Quantity Unit Weighted Avg. Unit Price Total Amount 102-1 MAINTENANCE OF TRAFFIC 2.00 $10,772.53 101-1 MOBILIZATION 10.00 $54,939.89 110-1-1 CLEARING & GRUBBING 3.07 AC $56,000.00 $171,920.00 120-1 REGULAR EXCAVATION 3,285.00 CY $14.00 $45,990.00 160-4 TYPE B STABILIZATION 9,386.67 SY $7.80 $73,216.03, 0.00 % $0.00 Version 18 Project Grand Total $634,555.69 Project Manager: Cost-per-Mile Model Version

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/costpermile/other/other-02.pdf?sfvrsn=5d006933_1

Other 03

 District: 09 County: 99 DISTRICT/STATE WIDE Pay Items Pay Item Description Total Quantity Unit Weighted Avg. Unit Price Total Amount 102-1 MAINTENANCE OF TRAFFIC 2.00 $5,929.06 101-1 MOBILIZATION 10.00 $30,238.21 110-1-1 CLEARING & GRUBBING 1.25 AC $56,000.00 $70,000.00 120-1 REGULAR EXCAVATION 322.66 CY $14.00 $4,517.24 522-1 CONCRETE SIDEWALK AND DRIVEWAYS, 4" 2,933.33 SY $73.00, Total $349,251.29 Project Manager: Cost-per-Mile Model/Template Version 18 Project Grand Total

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/costpermile/other/other-03.pdf?sfvrsn=1af6300d_1

Other 01

 District: 09 County: 99 DISTRICT/STATE WIDE Pay Items Pay Item Description Total Quantity Unit Weighted Avg. Unit Price Total Amount 102-1 MAINTENANCE OF TRAFFIC 6.00 $33,414.49 101-1 MOBILIZATION 10.00 $59,032.26 110-1-1 CLEARING & GRUBBING 3.90 AC $56,000.00 $218,400.00 160-4 TYPE B STABILIZATION 9,386.67 SY $7.80 $73,216.03 285-701 OPTIONAL BASE,BASE GROUP 01 7,040.00 SY $25.00, Project Manager: Cost-Per-Mile Model Version 18 Project Grand Total $681,822.62 Description

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/costpermile/other/other-01.pdf?sfvrsn=bd494931_1

1020304int

as a Standard Specification. Establishment of a standard pay item will aid in cost tracking. Do the changes, each per day. Item No. 102-150- Radar Speed Display Unit - per each per day. Item No. 102-909, Specifications and establishes a standard pay item. Justification: This type of operation has been, have; project costs, pay item structure, or consultant fees? Minimal - A new pay item will be established to track the costs of pedestrian escort operations. Previously, project specific pay items

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/review/fy2025-26/internal/1020304int.pdf?sfvrsn=e9a9b66a_1
20 of 1087 results