4650 search results for pavement design

D1-05-16-24BSN

. CONFLICT OF INTEREST A contractor who performs a constructability review on a design contract or who, , signalization, landscaping, and signing and pavement marking of SR 31 at CR 74 in Charlotte County, - 2-200 SPECIAL DETOUR- TEMPORARY PAVEMENT (44195015201) LS 1.000 0102- 2-300 SPECIAL DETOUR- TEMPORARY, - 2 MILLING EXISTING ASPHALT PAVEMENT, 3 1/2" AVG DEPTH SY 8,010.000 0327- 70- 6 MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH SY 863.000 0334- 1- 15 SUPERPAVE ASPHALTIC CONC, TRAFFIC E TN

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2024/may16/d1-05-16-24bsn.pdf?sfvrsn=c91c94ca_1

D3-06-13-24BSN

on a design contract or who participates in a value engineering study workshop or cost risk analysis, improvements, signing and pavement markings and signalization along SR 297 from SR 10A (US 90) Mobile Hwy, 0327- 70- 12 MILLING EXISTING ASPHALT PAVEMENT, 1 1/4" AVG DEPTH SY 15,006.000 0327- 70- 15 MILLING EXISTING ASPHALT PAVEMENT, 2 3/4" AVG DEPTH SY 36,316.000 0334- 1- 12 SUPERPAVE ASPHALTIC CONC, PERFORMANCE TURF, SOD SY 2,826.000 0706- 1- 3 RAISED PAVEMENT MARKER, TYPE B EA 1,372.000 0710- 11-101

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2024/jun13/d3-06-13-24bsn.pdf?sfvrsn=4349edba_1

TP-01-13-26BSN

a constructability review on a design contract or who participates in a value engineering study workshop, to milepost 80.720. Other components of the project include roadway, drainage, signing and pavement, 228.000 0524- 1- 2 CONCRETE DITCH PAVEMENT, NON REINFORCED, 4" SY 617.000 0550- 10-344 FENCING, TYPE, (44276435201) LS 1.000 0102- 2-200 SPECIAL DETOUR- TEMPORARY PAVEMENT (44276435201) LS 1.000 0102- 2-300, - 6 MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH SY 14,639.000 0327- 70- 11 MILLING EXISTING

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2026/jan13/tp-01-13-26bsn.pdf?sfvrsn=ea1c9162_1

Historical Item Averages Market Area 13

52,495.000 SY N SPECIAL DETOUR- TEMPORARY PAVEMENT 0102 2300 3 $5.66 $91,100.00 16,083.000 CY N SPECIAL, MILLING EXISTING ASPHALT PAVEMENT, 3" AVG DEPTH 0327 70 5 3 $6.98 $168,113.85 24,073.000 SY N MILLING EXISTING ASPHALT PAVEMENT, 2" AVG DEPTH 0327 70 6 14 $5.13 $1,569,902.36 305,884.000 SY N MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH 12/22/2025 Page: 4 Florida Department, MILLING EXISTING ASPHALT PAVEMENT, 4" AVG DEPTH 0327 70 8 3 $4.41 $553,675.73 125,650.000 SY N

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/market-area/pdf/historical-item-averages-market-area-13.pdf?sfvrsn=24273832_5

2021_High Friction Surface Treatment (HFST) Synthesis for Florida Pavements

geometry, friction, alternative countermeasures, pavement condition, and HFST start and end locations, at-risk location. For HFST, the benefits of a systemic approach are: • streamlined HFST design, important factor was the rate of wet weather and roadway departure crashes. Next were pavement condition and roadway geometry (essentially tied). The fourth most important factor was pavement friction, rate (Wet or RwD) Pavement condition Roadway geometry Friction Crash rate (Total) Cost-benefit

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/research/reports/fcpe/2021_high-friction-surface-treatment-(hfst)-synthesis-for-florida-pavements.pdf?sfvrsn=1cae71e6_1

6300205D01-723FHWA

the adjacent soil. When backfilling trenches in existing pavement, use a flowable fill meeting, with a moisture resistant sealant that is designed for this specific application. 6300205 630-3.1.1 Fiber, to or greater than the adjacent soil. When backfilling trenches in existing pavement, use a flowable fill, is complete with a moisture resistant sealant that is designed for this specific application. 6300205

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/fhwa/6300205d01-723fhwa.pdf?sfvrsn=c1eebbf4_1

SUWANNEE_Draft Tentative Work Program Public Hearing_By Project_10-11-2023

for Project 431349-2 $750,000 434918-2 - SUWANNEE CO AIRPORT DESIGN & CONSTRUCT NEW HANGER PFL13610, APT DESIGN & CONSTRUCT AVGAS FUEL FARM PFL0013232 Type of Work: AVIATION REVENUE/OPERATIONAL Phase, $100,000 Total for Project 440060-1 $1,000,000 440062-1 - SUWANNEE CO APT PAVEMENT REHAB OF T, 440432-2 - SUWANNEE CO AIRPORT DESIGN & CONSTRUCT EAST APRON EXPANSION PFL0013233 Type of Work, Freight Logistics And Passenger Operations Program: Aviation 441835-1 - SUWANNEE CO APT DESIGN

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/suwannee_draft-tentative-work-program-public-hearing_by-project_10-11-2023.pdf?sfvrsn=b5ed6be2_1

CLAY_Draft Tentative Work Program Public Hearing_By Project_10-11-2023

Program: Aviation 411572-8 - KEYSTONE APT DESIGN & REHAB RW 11-29 PFL13229 Type of Work: AVIATION, $1,664,300 Total for Project 411572-8 $450,000 $2,137,500 $1,664,300 411572-9 - KEYSTONE APT DESIGN, $60,000 Total for Project 436362-2 $600,000 440352-1 - KEYSTONE APT DESIGN & CONSTRUCT 10 UNIT T-HANGER, $300,000 Total for Project 445983-1 $300,000 446149-1 - KEYSTONE AIRPARK DESIGN & CONSTRUCT HANGAR, PAVEMENT STUDY Type of Work: MATERIAL TESTING/GEOTECHNICAL Phase Funding Source 2025 2026 2027 2028

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/clay_draft-tentative-work-program-public-hearing_by-project_10-11-2023.pdf?sfvrsn=949b790a_1

SUWANNEE_Draft Tentative Work Program Public Hearing_D2 By Description_10-11-2023

State $350,000 Total for Project 443975-1 $350,000 440432-2 - SUWANNEE CO AIRPORT DESIGN & CONSTRUCT, $2,000,000 434918-2 - SUWANNEE CO AIRPORT DESIGN & CONSTRUCT NEW HANGER PFL13610 Type of Work: AVIATION, Total for Project 434918-2 $500,000 $350,000 441835-1 - SUWANNEE CO APT DESIGN & CONSTRUCT NEW, $1,000,000 440062-1 - SUWANNEE CO APT PAVEMENT REHAB OF T-HANGER TAXI LANES PFL0011446 Type of Work, 436581-2 - SUWANNEE COUNTY APT DESIGN & CONSTRUCT AVGAS FUEL FARM PFL0013232 Type of Work: AVIATION

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/suwannee_draft-tentative-work-program-public-hearing_d2-by-description_10-11-2023.pdf?sfvrsn=b2a09205_1

CLAY_Draft Tentative Work Program Public Hearing_D2 By Description_10-11-2023

Operations Program: Aviation 446149-1 - KEYSTONE AIRPARK DESIGN & CONSTRUCT HANGAR Type of Work: AVIATION, Federal $270,000 State $30,000 Total for Project 442035-1 $300,000 411572-9 - KEYSTONE APT DESIGN, $6,000,000 440352-1 - KEYSTONE APT DESIGN & CONSTRUCT 10 UNIT T-HANGER PFL0011450 Type of Work, $500,000 Total for Project 440352-1 $700,000 $500,000 411572-8 - KEYSTONE APT DESIGN & REHAB RW 11-29, 208200-5 $50,000 $14,467,527 430352-3 - SR200(US301) FROM: BRADFORD C/L TO: N OF CR218 PAVEMENT STUDY

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/clay_draft-tentative-work-program-public-hearing_d2-by-description_10-11-2023.pdf?sfvrsn=c345cd94_1

700-010RedLines

Edge of Pavement Elevation Local Centroid (in.) (in.) (in.�) (in.�) (in.�) 6 6 12 12 7.5, with the GUIDE TO USE THIS INDEX General Notes and Design Example GENERAL NOTES AND DESIGN EXAMPLE, calculated Calculated: = -0.1 ft., 'Y' = 'D' 2.26 ft. Assume: 'B' = 1 ft., 'C' = 7 ft. Design Example, Aluminum Column (Post) and a 2.0' diameter 4 1 "4" shows the design requires a 4.0" diameter

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/errata/700-010redlines.pdf?sfvrsn=907d341d_1

700-010RedLines

Edge of Pavement Elevation Local Centroid (in.) (in.) (in.�) (in.�) (in.�) 6 6 12 12 7.5, with the GUIDE TO USE THIS INDEX General Notes and Design Example GENERAL NOTES AND DESIGN EXAMPLE, calculated Calculated: = -0.1 ft., 'Y' = 'D' 2.26 ft. Assume: 'B' = 1 ft., 'C' = 7 ft. Design Example, Aluminum Column (Post) and a 2.0' diameter 4 1 "4" shows the design requires a 4.0" diameter

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2024/errata/700-010redlines.pdf?sfvrsn=42e6ed50_1

Estimates Bulletin 15-05

Directors of Transportation Development, District Design Engineers, District Consultant Project, Design Engineers, District Traffic Operations Engineers, District Specifications Engineers, : RETROREFLECTIVE STRIPS FOR SIGNS This bulletin/memo supplements Roadway Design Bulletin IS-08/Traffic, on the Signing and Pavement Marking Tabulation Sheet. NOTE: Retroreflective strips are required for use, Strips. BACKGROUND Refer to Roadway Design Bulletin 15-08/Traffic Operations Bulletin 03-15

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/bulletins/fpc/2015/estimates-bulletin-15-05.pdf?sfvrsn=8a6eedd8_1

Noteworthy-Practices-Meeting-Packet

The Broward MPO’s Program Evaluation Tool is an in-house tool programmed and designed in ArcGIS, designed to assist member governments in developing transportation plans and programs for future, to the inclusion of climate change preparedness and resiliency into project planning, design, as well as the future planning, design, and construction efforts of our partners. Using the framework, ? The framework should be easy for other MPOs to incorporate, as it is designed to fit

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2022/noteworthy-practices-meeting-packet.pdf?sfvrsn=b84bc3c_1

0050104Admin.impl

. 5.MajorandUnusualStructures:Bridgesofcomplexgeometryand/or complex design. Generally, this includes, designated shape until it hardens. Formwork comprises common materials such as wood or metal sheets, the Contractor to design, detail and incorporate into the permanent works. SUBARTICLE 5-1.4.2 is deleted, , signing, and pavement marking plans, and/or lighting plans. At the preconstruction conference, to the intent of the original design. The delivery to and receipt by the Engineer does not constitute

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/implemented/0050104admin.impl.pdf?sfvrsn=e830bfb1_0

CPAMIntroductionRedline

of the inspection process. Consultant Principal-in-Charge: That person designated by the consulting firm under, Coordinator (DWC): Department employee designated by the DCE or Operations Engineer/Resident Engineer, by the Department to review all foundation construction documents submitted by the Design- Build Firm, and inspected. Pavement Condition Survey: A LOT-by-LOT in-depth evaluation of the pavement, . The evaluation is conducted by the Pavement Section of the District Materials office (DMO) or the State

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newhistory/cpamintroductionredline.pdf?sfvrsn=503305d0_1

CPAMIntroduction

Principal-in-Charge: That person designated by the consulting firm under contract who, Warranty Coordinator (DWC): Department employee designated by the DCE or Operations Engineer/Resident, foundation construction documents submitted by the Design- Build Firm and provide recommendations, contract work has been satisfactorily completed and inspected. Pavement Condition Survey: A LOT-by-LOT in-depth evaluation of the pavement for the ride quality, rutting, and other performance

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/cpamintroduction.pdf?sfvrsn=ee7b161b_7

CPAM Introduction 2025

Principal-in-Charge: That person designated by the consulting firm under contract who, Warranty Coordinator (DWC): Department employee designated by the DCE or Operations Engineer/Resident, foundation construction documents submitted by the Design- Build Firm and provide recommendations, contract work has been satisfactorily completed and inspected. Pavement Condition Survey: A LOT-by-LOT in-depth evaluation of the pavement for the ride quality, rutting, and other performance

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/cpam-introduction-clean-2022-prc.pdf?sfvrsn=15a7caa9_3

FL_HSP_FY2023 - Amendment 2

Streets policies. The concept is simple – complete streets are designed for everyone, which means that people and places are integrated into the planning, design, construction, operation

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/safety/3-grants/hsp-annual-reports/fl_hsp_fy2023---amendment-2.pdf?sfvrsn=79da1700_1

FL_HSP_FY2023 - Amendment 1

Complete Streets policies. The concept is simple – complete streets are designed for everyone, which means that people and places are integrated into the planning, design, construction, operation

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/safety/3-grants/hsp-annual-reports/fl_hsp_fy2023---amendment-1.pdf?sfvrsn=52cd6a54_1
20 of 4650 results