4272 search results for REPORT NUMBER

Example Illustrating The New Criteria for SSI-G Bridges per SDG 5.13_Published

moments, shears, deflections, flange lateral bending, and cross-frame forces. NCHRP Report 725, units by a case number determined by skew angle, skew index, and cross-frame configuration. 2 Case numbers then define the required method of analysis, classification of cross-frame members, the calculation of 3 ADTT(SL) with criteria for using the Fatigue I or II Limit State. Due to the number, the same step numbering as in the example. Flowcharts for all cases (Case 1, Case 2, Case 3, Case 4

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/structures/structuresmanual/currentrelease_test_old/example-illustrating-the-new-criteria-for-ssi-g-bridges-per-sdg-5-13_published.pdf?sfvrsn=861eee03_1

CSHB1397-HARTGovernanceOperationalManagementAnalysis

, and conducting an annual performance report could allow HART to outline costs, highlight successes, the findings from the 2012 Report of General Counsels Regarding Legal Issues Arising out of Consolidation, included in Appendix L. This report outlines multiple scenarios to address HART’s opportunities, , the subsidy is calculated based on the number of rides taken but may be a lump sum payment. Fare, Passenger Trips (UPT) – The number of passengers who board public transportation vehicles. Passengers

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/transit/safety-and-operations/cshb1397-hartgovernanceoperationalmanagementanalysis.pdf?sfvrsn=97c4be25_1

FMTP TM5_Needs, Issues and Scenario Planning

/Bottlenecks Stakeholders statewide stated that congestion is their number one issue. The Florida Chamber, Engineers, “Since 1984, the number of highway system miles has increased by 25%, while the daily vehicle miles traveled increased by 84%.” • Source: 2016 Report Card for Florida’s Infrastructure, , more energy means more trucks and therefore more VMT. There are a growing number of vehicles, access for data extraction. Specific information such as account numbers, PII, etc. can be redacted

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/rail/plans/fmtp/2020/fmtp-tm5_needs-issues-and-scenario-planning.pdf?sfvrsn=2ff6d7c8_1

MPOAC_StrategicDirectionsPlan_102024

10 of 16 Timeline: Sessions are provided up to two times per year. Measures: • Number, , as needed. Measures: • Number of virtual participants that complete the online training. • Post, and Staff • MPO representatives Timeline: Annually, or as needed. Measures: • Number of training, : Ongoing Measures: • Number of partnerships established with organizations • MPO participation, Timeline: Ongoing Measures: • Number of downloaded resources from webpage • Number of visits

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/documents---resources/mpoac_strategicdirectionsplan_102024.pdf?sfvrsn=7c10685e_1

Cove Road CSRP_2025Jan9

From SR 76/Kanner Hwy to SR 5/US 1/Federal Hwy Martin County, Florida Financial Management Number: 441700-1 ETDM Number: 14479 January 2025 The environmental review, consultation, and other, Financial Management Number: 441700-1 ETDM Number: 14479 January 2025 i Table of Contents Executive, and employment was gathered for the project area. Median household income, the number of people whose, Estimates Information regarding the number of people employed, unemployed, in the Armed Forces, or who

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cove-road-study/cove-road-csrp_2025jan9.pdf?sfvrsn=d32a9375_1

FMPP Slides_01162025_final

) Credits  AICP members can earn CM credits for this activity (2.75 hours)  Course number, am FTP Performance Report Becky Marsey, SFTO Regina Colson, SFTO 9:30 am – 9:45 am Adjusted, injuries 1 Reduce the number and severity of crashes and safety incidents 2 Strengthen transportation, -related fatalities and serious injuries 1 Reduce the number and severity of crashes and safety, -related fatalities and serious injuries 1 Reduce the number and severity of crashes and safety

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/policy/metrosupport/fmpp/2025_1-january/fmpp-slides_01162025_final.pdf?sfvrsn=ae64ac3a_1

1600200FHWA

samples. Determine test locations, including stations and offsets, using the Random Number generator, stations and offsets, using the Random Number generator approved by the Department. Notify, locations, including stations and offsets, using a Random Number generator, based on the LOTs under, . The Engineer will select test locations, including stations and offsets, using a Random Number, and offsets, using the Random Number generator approved by the Department. Retain the Verification

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/review/fhwa/1600200fhwa.pdf?sfvrsn=335202a2_1

sp4550000db

with subsequent construction operations. Submit a written report by the divers to the Engineer, to measure the distribution of the load. Ensure that the type, number, and location of the strain, load test report signed and sealed by the Specialty Engineer to the Engineer for review, to beginning production pile/shaft construction. Include in the report of the load test the following, certifications. In addition, submit a report showing an analysis of the results of axial load

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/design-build/sp4550000db.docx?sfvrsn=8e0dda17_2

SP4550000DB

. Submit a written report by the divers to the Engineer indicating the results of their underwater, gauges in the test shaft to measure the distribution of the load. Ensure that the type, number, . 455-2.8 Required Reports: Submit a static load test report signed and sealed by the Specialty Engineer, in the report of the load test the following information: 1. A tabulation of the time of, and the amount, a report showing an analysis of the results of axial load and lateral load tests in which soil

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/january-2020/design-build/sp4550000db.pdf?sfvrsn=97fab42a_3

444634-1_SR72_CRAS_Redacted Version

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 -5 1.5 Report Purpose, project. The following information was extracted from the Preliminary Engineering Report prepared, to increase with the growing number of residential developments within the area. In addition, SR 72, Assessment Survey Sarasota County FPID No. 444634-1 1.5 Report Purpose The purpose of the Cultural

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26123/444634-1_sr72_cras_redacted-version.pdf?sfvrsn=243e26e6_1

Staff-Minutes-4_29_21-FINAL

by a phone number. • CALL TO ORDER Don Scott, Chair, Lee County MPO, called the meeting to order, comments were made. • EXECUTIVE DIRECTOR’S REPORT A. UPWP REPORT Mr. Jeff Kramer, Interim MPOAC, Work Program (UPWP) Report showing expenditures and budget for the third quarter of state fiscal year, % of a project. The 9 Department will complete a study on this proposed change and report on the findings. It, to the Governing Board on a number of issues including what should be included in the position

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2021/staff-minutes-4_29_21-final.pdf?sfvrsn=509c9a21_1

Road Ranger Responder Survey_2010

is included in Appendix A of this report. Statewide Road Ranger Survey for Incident Responders 4, will be used in several quarterly and annual reports throughout the year. T h i s report contains, on the total number of responses received. This measurement approach gauges the degree of responses, of the counties and the number of responses. Counties and Number of Responses Broward 98 Indian River 11, , or strongly disagree. Although the total number of negative responses was relatively low, a review

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/cvotim/tim/archive/road-ranger-responder-survey_2010.pdf?sfvrsn=91960033_1

Road Ranger Responder Survey_2010

is included in Appendix A of this report. Statewide Road Ranger Survey for Incident Responders 4, will be used in several quarterly and annual reports throughout the year. T h i s report contains, on the total number of responses received. This measurement approach gauges the degree of responses, of the counties and the number of responses. Counties and Number of Responses Broward 98 Indian River 11, , or strongly disagree. Although the total number of negative responses was relatively low, a review

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/cvotim/tim/archive/rr-library/road-ranger-responder-survey_2010.pdf?sfvrsn=86759a8c_1

9970000-122FHWA

with manufacturer name or trademark, part number, and date of manufacture or serial number. Product Sample, Protocol (PPP) Event Reporting: The device shall have the capability to record and report, or trademark, part number, and date of manufacture or serial number. Product Sample When requested, submit, Reporting: The device shall have the capability to record and report, at a minimum, the following

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/fhwa/9970000-122fhwa.pdf?sfvrsn=a9c7f706_2

4580100ind

model number and joint movement range. 458-3.2 Sidewalk Cover Plates: Submit shop drawings, the minimum coefficient of friction requirements. 458-3.3 Strip Seals: Provide the APL number, joint. Fabricate a full length modular joint system as one piece. Only a minimal number, % of the total number of stud welds at the discretion and direction of the Engineer. Any stud found, joint. Document date, time, and location of joint inspections and submit the report to the Engineer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/4580100ind.pdf?sfvrsn=449ee3a7_1

COFL2024-UserGuide

in the Final Report of this project. COFL2024 quickly and easily analyzes intersections and other similar, the outputs and creates a 1- page summary report which is displayed on the Results screen. Figure 14, 8-hr CO Background Concentration 3.0 FDOT District Number 7 Intersection Type 4 X 4 Speed, Concentration 5.0 8-hr CO Background Concentration 3.0 FDOT District Number 7 Intersection Type N-S, 3.3 8-hr CO Background Concentration 2.0 FDOT District Number 7 Intersection Type Toll Booth

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/software/cofl2024-userguide.pdf?sfvrsn=1086c114_1

BED70 Final Report

BED70 Final Report,  Strengthening Piers to Resist Vehicular Collision Final Report FDOT Contract Number: BED70, 2525 Pottsdamer Street, Tallahassee FL 32310 Report Date April 2024 ii DISCLAIMER, 1. Report No. 2.Government Accession No. 3. Recipient's Catalog No. 4. Title and Subtitle Strengthening Piers to Resist Vehicular Collision 5. Report Date April 2024 6.Performing Organization, 8.Performing Organization Report No. BED70 9.Performing Organization Name and Address Florida State

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/structures/structuresresearchcenter/final-reports/2025/bed70-final-report.pdf?sfvrsn=4ac0c613_1

44893815201-DrainageTechMemo

Number: 448938-1-52-01 Hendry County Prepared For: Florida Department of Transportation District 1, 27) from Stitt Ranch Road to Flaghole Road FPID NO.: 448938-1-52-01 REPORT: Drainage Design, limits which are permitted through South Florida Water Management District (SFWMD), ERP number 26-01170-P. Based on ERP number 26- 01170-P, the project limits have two retention ponds in the median, . LICENSE NUMBER: 82300 COREY M. BLOXAM, P.E. T H E O F F I C I A L R E C O R D O F

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25131/44893815201-drainagetechmemo.pdf?sfvrsn=a9ba6939_1

Glades_SR29_DrainageComplaintRevised

. The purpose of this report is to document the causes for the flooding problems along S.R. 29 as reported, of debris as well. No damage was observed at the drainage structures. A scour report was obtained for bridge number 050033 (Cypress Branch Bridge). Cypress Branch is a riverine waterway that flows, no scour reports available for the Lone Pine Creek Bridge number 050035. A field meeting was held, here as well. The report suggests double 72” pipes be installed to address the flooding. Currently

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25114/glades_sr29_drainagecomplaintrevised.pdf?sfvrsn=555520c3_1

9710104-724FHWA

, date of manufacturer, lot number and APL number. The label shall warn the user of any special handling, listed in Table 1 of 40 CFR 261.24. AASHTO Product Evaluation & Audit Solutions Field Test Report, Specification requirements. Independent Laboratory Test Report Submit independent laboratory test results, data meeting FDOT Specification requirements. A notation of the number of coats and the thickness, on the label. The label must also show the color, date of manufacturer, lot number and APL number

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/fhwa/9710104-724fhwa.pdf?sfvrsn=325bcae7_1
20 of 4272 results