4266 search results for REPORT NUMBER

20200930_ProposedAmendments-Rule41-2.014FAC

period as determined by the Commission.The latest required operational statistics report which, jurisdiction; (b) 75% of the planning allocation shall be divided into shares equal to the number

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/meetingpackages/2020-meetings/20200930_proposedamendments-rule41-2-014fac.pdf?sfvrsn=95a64018_2

Florida Department of Transportation

economic value Florida Seaports provide the State? How about the total number of cruise passengers, , 2024 This report represents an update to 2016’s Economic Impact Analysis study based on 2015 data

https://www.fdot.gov/seaport/default.shtm

20251113_ 447653-2_SR-70_94030

 12/08/25 FLORIDA DEPARTMENT OF TRANSPORTATION PCRPJ03 PAVEMENT CORING REPORTING PCRO003 PAVEMENT EVALUATION CORING AND CONDITION DATA INPUT DATA REPORT MANDIST FINPROJ TYPSECT MESSAGE 04 447653-2-52-01 01 THE CONTROL CARD IS CORRECT 12/08/25 FLORIDA DEPARTMENT OF TRANSPORTATION PCRPJ03 PAVEMENT CORING REPORTING PCRO103 PAVEMENT EVALUATION CORING AND CONDITION DATA FIN PROJ, . LUCIE SHOULDER TYPE END MP: 12.50 LENGTH: 6.14 SR NUMBER: SR 70 INSIDE: PROJECT MEASUREMENT: ENGLISH

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/coringdata/d4/94/20251113_-447653-2_sr-70_94030.pdf?sfvrsn=3717c533_1

4550103.FHWA

the Contractor to proceed with subsequent construction operations. Furnish the EngineerSubmit a written report, the distribution of the load. Ensure that the type, number, and location of the strain gauges are as shown, substituted: 455-2.8 Required Reports: Submit a preliminary static load test report, internal instrumentation, submit the final report within ten days after completing the load test. 4550103.D01 All Jobs FurnishSubmit the final report of test results for internally instrumented shafts

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/fhwa/4550103.fhwa.pdf?sfvrsn=99381d44_0

4550103.FHWA2

operations. Furnish the EngineerSubmit a written report by the divers to the Engineer indicating, to measure the distribution of the load. Ensure that the type, number, and location of the strain, report to the Engineer within five days after completing the load test. When the Contract Documents do not require internal instrumentation, submit the final report within ten days after completing the load test. 4550103.D012 All Jobs FurnishSubmit the final report of test results for internally

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/fhwa/4550103.fhwa2.pdf?sfvrsn=10e43641_0

2024FDM201DesignControls

) Handbook provide detailed analysis and calculation procedures used in determining the number, gradients and roadside developments • Number, spacing, and types of crossings and intersections, change in cross section are where a narrow bridge exists and when the number of travel lanes increase, and volume are used to establish the number of travel and turn lanes, turn lane storage, signal timing, and Environmental (PD&E) study of a project. A Project Traffic Analysis Report is generally required. When

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm201designcontrols.pdf?sfvrsn=be346d3e_1

2024FDM201DesignControls

) Handbook provide detailed analysis and calculation procedures used in determining the number, gradients and roadside developments • Number, spacing, and types of crossings and intersections, examples of sudden change in cross section are where a narrow bridge exists and when the number, the design year. Forecasted traffic demand and volume are used to establish the number of travel and turn, . A Project Traffic Analysis Report is generally required. When a PD&E study is not conducted, traffic

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm201designcontrols.pdf?sfvrsn=e749ca75_1

SunTrail_FAQ_2024-05

, Florida Department of Financial Services Catalog of State Financial Assistance (CSFA) Number 55.038, Financial Assistance (CSFA ) Number 55.038 grant agreement. This legal instrument describes, , with A standing for the highest/best LOS score possible. In July 2006, FHWA released a report on how to calculate LOS for “shared use paths” (multi-use trails). The centerpiece of the report, capacity of 4,680 [195 x 2 (two-way traffic) x 12 (daily number of hours of operation)]. 12-foot

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/systems/suntrail/guidance/suntrail_faq_2024-05.pdf?sfvrsn=6f97686b_1

2025FDM201DesignControls

the number and configuration of lanes required and the resulting levels of service provided, : • Roadway gradients and roadside developments • Number, spacing, and types of crossings, and when the number of travel lanes increases or decreases. The FDOT Standard Plans provide guidance, the number of travel and turn lanes, turn lane storage, signal timing, and right of way requirements, (PD&E) study of a project. A Project Traffic Analysis Report is generally required. When a PD&E

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm201designcontrols.pdf?sfvrsn=5ce2bfb2_1

fm-se-11-reliability-and-maintainability-program-plan-template_FINAL

number Approval date: insert approval date DOCUMENT CONTROL PANEL File Name: [insert project file name] File Location: [insert project file URL] Version Number: Name, fault coverage detection possible and isolation to the minimum number of lowest replaceable units, reliability. RMWG member roles and responsibilities are as follows [provide table number, if used, qualification test report Maintainability qualification plan Maintainability qualification test

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/its/projects_deploy/semp/fm-se-11-reliability-and-maintainability-program-plan-template_final.docx?sfvrsn=56f4f2e2_1

7000000-723impl

of installation, APL number of the base sheeting, and Name of Fabricator. Make the labels unobtrusive, and record an adequate number of performance characteristics to ensure compliance with applicable standards, repeated. If a unit has been modified as a result of a failure, a report shall be prepared and submitted to the Engineer. The report shall describe the nature of the failure and the corrective action, Sign will be made for each completed sign, regardless of the number of embedded sign messages

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/implemented/7000000-723impl.pdf?sfvrsn=5f6af1dc_1

2026FDM201DesignControls

in determining the number and configuration of lanes required and the resulting levels of service, and Level of Service: • Roadway gradients and roadside developments • Number, spacing, and types, exists and when the number of travel lanes increases or decreases. The FDOT Standard Plans provide, through the design year. Forecasted traffic demand and volume are used to establish the number, of a project. A Project Traffic Analysis Report is generally required. When a PD&E study

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm201designcontrols.pdf?sfvrsn=a69005e7_5

2026FDM201DesignControls

in determining the number and configuration of lanes required and the resulting levels of service, and Level of Service: • Roadway gradients and roadside developments • Number, spacing, and types, exists and when the number of travel lanes increases or decreases. The FDOT Standard Plans provide, through the design year. Forecasted traffic demand and volume are used to establish the number, of a project. A Project Traffic Analysis Report is generally required. When a PD&E study

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm201designcontrols.pdf?sfvrsn=a3b6cb19_1

DEV416-937PIAS (8-20-24)

the next three LOTs at a 2% rate, rounded up to the nearest whole number, and if these LOTs have no failing tests, sample at a rate of 1%, rounded up to the nearest whole number, for the remaining, . Date of Manufacture 4. Expiration Date 5. LOT Identification Number 6. Storage and Handling, Report For product or product system, containing the following information: 1. Minimum Uniform Bond, and address 2. Product Name 3. Anchor material grade 4. LOT Identification Number Safety Data

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/special-case/developmental/dev416-937pias-(8-20-24).pdf?sfvrsn=e2037466_2

Trends & Conditions – Sources

, SUN Trail Mapping Information, July 2025 • Public Bridges FDOT Office of Maintenance, Number of Bridges, 2025 • Transit Systems FDOT Public Transit Office, Number of Transit Systems, 2025 • Primary Commercial Service Airports FDOT Aviation Office, Number of Commercial Service Airports, July 2025 • Seaport FDOT Seaport Office, Number of Seaports, 2024 • Spaceport FDOT Spaceport Office, Number of Spaceports, July 2025 • Military Installations SelectFlorida.org, Florida Military

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/fto/trends---conditions-folder/trends-conditions-sources.pdf?sfvrsn=8c8d7976_13

2025_concrete-pavement-overlay-state-of-the-practice-for-florida

and Guidelines, and Ta s k 4: We b i n a r and Final Documents. This report was prepared in support of Ta sk 1: Survey and Interview and is developed to report the state of the practice, for the continental United States [1]. Source: CP Te c h Center Figure 2. Number of concrete overlays construction, provided as an attachment to this report. Where documents have been requested but not yet received, a s reporting the greatest number of overlays, followed by Louisiana, North Carolina, Alabama

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/research/reports/fcpe/2025_concrete-pavement-overlay-state-of-the-practice-for-florida.pdf?sfvrsn=36295b73_1

Chapter 1: The Role of Rail in Statewide Transportation

large numbers of people while also reducing roadway congestion and pollution, providing safer travel, stakeholders to respond to trespassing issues. A report was produced in 2020 that outlines the work, for travelers on an overburdened state highway system and is projected to reduce the number of vehicle

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/rail/plans/rail/rail-system-plan-2023/fdot_rsp_ch-1_ada.pdf?sfvrsn=418b35ea_5

0090103LS.FHWA

average unit price in the Six Month Moving Statewide Averages report. The dates will be the six, a computer application that will calculate and print the number of gallons of bituminous material, estimate. Forallasphalt concrete, the number of gallons will be determined assuming a mix design, t r a c t N u mber, F i n a n c i a l P r o j ect Identification Number, Invoice Estimate Number, in the Six Month Moving Statewide Averages report. The dates will be the six months prior

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/fhwa/0090103ls.fhwa.pdf?sfvrsn=11f09120_0

4550201ind

the distribution of the load,. and provide a minimum of four gauges per level. Ensure that the type, number, that the type, number, and location of the gauges are as shown in the Plans or as directed, : Include in the report of the load test the following information: 1.A tabulation of the time, certifications. In addition, submit a report showing an Include analysis of the results of axial load, and the following substituted: 455-11.5 Dynamic Load Tests: Payment will be based on the number of and type

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/4550201ind.pdf?sfvrsn=c18d4d75_1

9970000-724origind

permanently marked with manufacturer name or trademark, part number, and date of manufacture or serial number. Product Sample When requested, submit a product sample. Installation, : The device shall have the capability to record and report, at a minimum, the following events, in modules are used, each vehicle speed/classification unit must be identical except for the number, /classification unit has a unique, individual unit number. The unit number must reside in non-volatile

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/internal/9970000-724origind.pdf?sfvrsn=490b8690_1
20 of 4266 results