S.R. A1A Reopens Today on the Entire East Coast of Florida Following Damage from Hurricane Nicole
Hurricane Nicole Roadway Opening in Flagler, St. Johns and Volusia Counties TALLAHASSEE, Fla. — Today, in Flagler Beach; from Highbridge Road in Volusia County to South Central Avenue in Flagler Beach in Flagler County; from Wisteria Drive to Sunny Beach Drive in Ormond by the Sea; and in Vilano Beach, and Flagler counties. As these final sections of S.R. A1A reopen, motorists can check www.FL511.com
https://www.fdot.gov/info/co/news/2022/111220222025FDM222Peds
the direction of the crossing. must pProvide the flattest ramp slope practicable, not to exceed, feet in length. Provide transition slopes (flared sides) where a pedestrian circulation path, and designing crossings for shared use paths. Flangeway gaps are necessary to allow the passage of train wheel flanges; however, they pose a potential hazard to pedestrians who use wheelchairs because the gaps can entrap the wheelchair casters. A maximum flangeway gap is required for all at-grade pedestrian
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm222peds.pdf?sfvrsn=13076126_52025FDM222Peds
. Flangeway gaps are necessary to allow the passage of train wheel flanges; however, they pose, of the crossing. Provide the flattest ramp slope practicable, not to exceed a maximum slope of 1:12, not exceed 15 feet in length. Provide transition slopes (flared sides) where a pedestrian, casters. A maximum flangeway gap is required for all at-grade pedestrian rail crossings of 2½” for all, warnings should not be placed where sidewalks intersect urban flared driveways or on sidewalks
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm222peds.pdf?sfvrsn=82d2d90f_12026FDM222Peds
paths. Flangeway gaps are necessary to allow the passage of train wheel flanges; however, they pose, of the intersection. See FDM 210.3 for more information on refuge islands. Provide the flattest ramp slope, transition slopes (flared sides) where a pedestrian circulation path crosses the curb ramp. The maximum, casters. A maximum flangeway gap is required for all at-grade pedestrian rail crossings of 2, urban flared driveways or on sidewalks that run continuously through residential driveways . Do
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm222peds.pdf?sfvrsn=52367ed7_109900307-724IMPL
990 TEMPORARY TRAFFIC CONTROL DEVICE MATERIALS. (REV 7-6-23) (FA 12-5-23) (FY 2024-25) SUBARTICLE 990-3.7.1 is deleted and the following substituted: 990-3.7 Automated Flagger Assistance Devices (AFAD): 990-3.7.1 General: AFAD’s shall meet the physical display and operational requirements in the MUTCD and be listed on the APL. Manufacturers seeking evaluation of their product for the APL must include detailed vendor drawings showing typical application of the device in accordance
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/implemented/9900307-724impl.pdf?sfvrsn=31356617_11020100-723origind2
a construction activity requires restricting traffic to one-way operations, locate the flaggers within view of each other when possible. When visual contact between flaggers is not possible, equip them, the limits of such areas until the potential for damage injury no longer exists. 102-5.78 Flagger: Provide flaggers to control traffic when traffic in both directions must use a single lane and in other situations as required. All flaggers must meet the personnel qualifications specified in Section 105
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/internal/1020100-723origind2.pdf?sfvrsn=db2987c6_1SPI-450-199
flange. Consider that the vertical curve geometry is along the effective alignment along a chord, height beams in adjacent spans so as to allow the beam bottom flanges to line up. Dim B and Dim D do, : V = Total Volume of build-up per beam (CY) L = Beam Length (ft) W = Width of beam top flange (ft
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-450-199.pdf?sfvrsn=4f93ecc_1SPI-450-199e
flange. Consider that the vertical curve geometry is along the effective alignment along a chord, height beams in adjacent spans so as to allow the beam bottom flanges to line up. Dim B and Dim D do, : V = Total Volume of build-up per beam (CY) L = Beam Length (ft) W = Width of beam top flange (ft
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-450-199e.pdf?sfvrsn=f7a7cf5b_1SPI-450-199
flange. Consider that the vertical curve geometry is along the effective alignment along a chord, height beams in adjacent spans so as to allow the beam bottom flanges to line up. Dim B and Dim D do, : V = Total Volume of build-up per beam (CY) L = Beam Length (ft) W = Width of beam top flange (ft
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/spi/spi-450-199.pdf?sfvrsn=3497a7d5_11020302.resp
instructed the contractor to use trained flaggers. Flaggers are used for a variety of tasks other than one lane operations. Now the specification is specifically limiting use of flaggers for one lane road, right so the contractor places flaggers to "guide" traffic around the lane closure. According to the new specification, these flaggers do not have to be certified or trained. Granted, defines the requirement? Leaving it at trained flaggers PERIOD removes any room for doubt. After
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/comments-responses/1020302.resp.pdf?sfvrsn=6664e3c5_0Interstate Exit Numbers for I-595
INDEX A-Z Search Interstate Exit Numbers for I-595 Exit Numbers | I-4 | I-10 | I-110 | I-75 | I-175 | I-275 | I-375 | I-95 | I-195 | I-295 | I-395 | I-595 | Turnpike Traveling on I-595 Exit Number Intersecting Roadway West 1 SW 136th Ave East West 2 SR 823 (Flamingo Rd) East West 3 Hiatus Rd East
https://www.fdot.gov/traffic/trafficservices/exitnumb/i-595.shtm451280-1 SR 758 Over Sarasota Bay Bridge No 170061 Repair and Rehab Scope
flange spalls). Recommendation/action: Spall repair. Bascule Piers 9 and 10 Condition: CS-3, primary bar over FBM 9-6 adjacent to MG 9-1). Recommendation/action: Repair cracked welds. Flanking
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26110-(bdi)/451280-1-sr-758-over-sarasota-bay-bridge-no-170061-repair-and-rehab-scope.pdf?sfvrsn=b6c9e8a3_16780200.impl
TS-2-2016, Section 5.3.5 Load Switch ........................ NEMA TS-2-2016, Section 6.2 Flasher................................. NEMA TS-2-2016, Section 6.3 Flash Transfer Relay........... NEMA, ................................................ ............................................ CALTRANS TEES, 2009 6.4.3 Flash Transfer Relay (Model 430
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/implemented/6780200.impl.pdf?sfvrsn=bfcc870a_00080703-723comm
of a flagger per the Railroad. Therefore, we need to make sure that we get time even if our activities are beyond the 15 ft and we are shut down due to lack of flagger. In simple terms, for ALL activities in which the Railroad requires a flagger. See the suggested changes: The Department will consider
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/comments-responses/0080703-723comm.pdf?sfvrsn=efe0c0ea_20080703-723resp
for the need of a flagger per the Railroad. Therefore, we need to make sure that we get time even if our activities are beyond the 15 ft and we are shut down due to lack of flagger. In simple terms, for ALL activities in which the Railroad requires a flagger. See the suggested changes: The Department
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/comments-responses/0080703-723resp.pdf?sfvrsn=8a04291e_2Floridas Historic Railroad Resources MPS_NRHPListed04052001_MS6289
contributed to this process include William Dudley Chipley, H. Reiman Duval, Henry Flagler, Henry, standardized service and physically integrated the nation's rail system. The "T" rail and flanged wheels, construction and operations. William D. Chipley, H. Reiman Duval, Henry M. Flagler, and Henry B, services in Florida. Chipley, Duval, Flagler, and Plant found themselves at the center of railroad, .^^ Henry M. Flagler and the Florida East Coast Railway One of the grandest visions in railroad
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/cultural-resources/floridas-historic-railroad-resources-mps_nrhplisted04052001_ms6289.pdf?sfvrsn=42f8a61f_29950100-722resp
) Please review the verbiage – shall not be between 5 and 30 flashes per second. Reasoning: when the section deals with Beacon flashing requirements, why mention about “ shall not be” Response: In order
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/comments-responses/9950100-722resp.pdf?sfvrsn=d9cf92b3_2