4817 search results for Standard Specifications

2024FDM914GenNotes

or curtail requirements in the Standard Specifications or Standard Plans . General notes are not a substitute for specifications. Product and material requirements must be included in the applicable, in the Standard Specifications and Standard Plans . Other rules to follow include: (1) Do, of payment information contained in the Standard Specifications , such as: • Clarify how, of the proposed language is the responsibility of the District Specifications Office. 914.2 General

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm914gennotes.pdf?sfvrsn=a4dd976c_1

2025FDM914GenNotes

or curtail requirements in the Standard Specifications or Standard Plans. General notes are not a substitute for specifications . Product and material requirements must be included in the applicable, in the Standard Specifications and Standard Plans. Other rules to follow include: (1) Do not include, in the Standard Specifications, such as: • Clarify how incidental work is to be paid, acceptance of the proposed language is the responsibility of the District Specifications Office. 914.2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm914gennotes.pdf?sfvrsn=78550f6e_1

9951400-723impl

with Military Standard MIL-PRF-24712A or AAMA-2603-02. Finish must meet the requirements of ASTM D3359, ASTM, equipment and components that meet the requirements of these minimum specifications and are listed, requirements of the AASHTO LRFD Specifications for Structural Supports for Highway Signs, Luminaires, in accordance with the Standard Plans. The structural aluminum Z members must run parallel, , Section 1.6. 995-16.3.1 LED and Pixel Specifications: LED lamps must have a minimum viewing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/implemented/9951400-723impl.pdf?sfvrsn=360a34c4_1

9950100-723origind

- specifications.shtm Manufacturer’s Product Specifications Include product specifications showing,  ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance, : Will the proposed revision require changes to: Publication Yes No Office Staff Contacted Standard Plans, of the following types of specifications (Hover over type to go to site.): Special Provisions

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/internal/9950100-723origind.pdf?sfvrsn=f2ae14c3_1

SPI-350-001

 Standard Plans Instructions Topic No. 625-010-003 Index 350-001 Concrete Pavement Joints FY 2024-25 1 Index 350-001 Concrete Pavement Joints Design Criteria Rigid Pavement Design Manual (RPDM) Design Assumptions and Limitations The drawings shown in this Index include details, of the specifications. Plan Content Requirements Detail the location and dimensions of concrete, - Curb-Concrete Pavement Joint LF See the BOE and Specifications for additional information

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-350-001.pdf?sfvrsn=2e8a775b_2

SPI-350-001

 Standard Plans Instructions Topic No. 625-010-003 Index 350-001 Concrete Pavement Joints FY 2025-26 1 Index 350-001 Concrete Pavement Joints Design Criteria Rigid Pavement Design Manual (RPDM) Design Assumptions and Limitations The drawings shown in this Index include details, of the specifications. Plan Content Requirements Detail the location and dimensions of concrete pavement, - Curb-Concrete Pavement Joint LF See the BOE and Specifications for additional information

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/spi/spi-350-001.pdf?sfvrsn=c6c1b496_1

6340203.orig

 ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Date: Specification Section: Originator: Articles/Subarticles: Telephone: email: Will the proposed revision involve Design Standard Index changes? Yes No Roadway Design staff contact ed ( name ) : Will the proposed revision involve PPM changes? Yes, the State Specifications Office for assistance in completing this form. Daniel Scheer 850-414-4130

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/comments-responses/6340203.orig.pdf?sfvrsn=e0d1b28e_0

E1W36Addendum001

bridges. Utilize Standard Plan Index No. 536-002, Scheme III to construct the guardrail, . ATTACHMENTS A01_Project Advertisement A02_Design Build Division I Specifications A03_Award, . Utilize Standard Plan Index No. 536-002, Scheme III to construct the guardrail at the bridges (see, transitioning the guardrail height utilizing standard index 536-01 sheet one note ten. The west side guardrail is to also utilize standard index 536-01 sheet one note ten and only replace

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1w36/e1w36addendum001.pdf?sfvrsn=790c1532_1

SPM0010300-724-i19160

, Executed Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, of the work. In this contract, references to “the plans” mean the Department’s Standard Plans, plans” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/maintenance/finalized/spm0010300-724-i19160.pdf?sfvrsn=52e1354f_1

SPM0010300-725-i19840

, Executed Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, of the work. In this contract, references to “the plans” mean the Department’s Standard Plans, plans” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/maintenance/finalized/spm0010300-725-i19840.pdf?sfvrsn=af1d696a_1

SPM0010300-723-i18538

, Executed Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, of the work. In this contract, references to “the plans” mean the Department’s Standard Plans, plans” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/maintenance/finalized/spm0010300-723-i18538.pdf?sfvrsn=c7e5aca5_2

SPM0010300-122

Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed or otherwise, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, or where, . In this contract, references to “the plans” mean the Department’s Standard Plans, and revisions, ” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/maintenance/finalized/spm0010300-122.pdf?sfvrsn=c9c8c945_2

SPM0010300-722-i17911

Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed or otherwise, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, or where, . In this contract, references to “the plans” mean the Department’s Standard Plans, and revisions, ” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/maintenance/finalized/spm0010300-722-i17911.pdf?sfvrsn=46b41923_2

SPM0010300-721

Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed or otherwise, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, or where, . In this contract, references to “the plans” mean the Department’s Standard Plans, and revisions, ” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/maintenance/finalized/spm0010300-721.pdf?sfvrsn=55b54341_2

SP0010300-i16254

of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed or otherwise transmitted, : In order to avoid cumbersome and confusing repetition of expressions in these Specifications, it, . In this contract, references to “the plans” mean the Department’s Standard Plans, and revisions thereto, and the Department’s Standard Plans, and revisions thereto current at the time of contract letting

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/maintenance/finalized/sp0010300-i16254.docx?sfvrsn=b8361f99_2

SP0010300

of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed or otherwise transmitted, : In order to avoid cumbersome and confusing repetition of expressions in these Specifications, it, . In this contract, references to “the plans” mean the Department’s Standard Plans, and revisions thereto, and the Department’s Standard Plans, and revisions thereto current at the time of contract letting

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/maintenance/finalized/sp0010300.docx?sfvrsn=d90b9801_2

7130403-722origind

 ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance, : Will the proposed revision require changes to: Publication Yes No Office Staff Contacted Standard Plans, , State Specifications Engineer SUBJECT: Proposed Specification: 7130403 Permanent Tape Pavement, value for black pavement markings in the Standard Specification. Please share this proposal

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/7130403-722origind.pdf?sfvrsn=5c78f654_2

0040100 IndustryCommentResponse

somewhere else, if discussed in the Standard Specifications at all. RESPONSE: Using “digital, comments and responses are verbatim as received. The Specifications Office does not alter typos or grammar.) BLACK = Comment BLUE = Specifications Response GREEN = Change Made to Specification Name, is in conflict. Being that the Standard Specs are the only Contract Document here, recommend taking a good look, . Documents can be manually wet ink signed and submitted but this option is no longer our standard

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/comments-responses/0040100-industrycommentresponse.pdf?sfvrsn=3533a8ea_1

2024FDM944LandscapePlans

or Standard Specifications . Place general notes on standard-format sheets (11”x17”). General, contained in the Standard Specifications , such as: • Clarify how incidental work is to be paid, or Standard Specifications . Construction details for tree bracing during root establishment, in the Standard Plans or Standard Specifications . Include a legend depicting the symbology used, in the Standard Plans or Standard Specifications . 944.5 Landscape Maintenance Guide Sheet

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm944landscapeplans.pdf?sfvrsn=bc392161_1

2025FDM944LandscapePlans

site-specific requirements not covered by the Standard Plans or Standard Specifications. Place general notes on standard-format sheets (11”x17”). General notes may include: • Benchmark datum, not covered by the basis of payment information contained in the Standard Specifications, or Standard Specifications. 944.5 Landscape Maintenance Guide Sheet The Landscape Maintenance Guide, are produced on a standard- format sheet (11”x17”) created using the FDOT CADD Software. Topic

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm944landscapeplans.pdf?sfvrsn=d7d6e20_1
20 of 4817 results