2709 search results for apl

9540100int

, 965 Summary: Moved materials requirements from the Standard Plans and added APL requirements, on the posts shall be trimmed close to the body of the post. 954-1.2 Approved Product List (APL): All materials shall be one of the products listed on the Department’s Approved Product List (APL, . Square line posts - 4 inches by 4 inches. Table 954-1 APL Requirements Documentation Requirements, materials. Product Sample (for APL listing) A sample may be requested to verify the product

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/internal/9540100int.pdf?sfvrsn=bd56a7de_1

9540100ind

, 965 Summary: Moved materials requirements from the Standard Plans and added APL requirements, on the posts shall be trimmed close to the body of the post. 954-1.2 Approved Product List (APL): All materials shall be one of the products listed on the Department’s Approved Product List (APL, . Square line posts - 4 inches by 4 inches. Table 954-1 APL Requirements Documentation Requirements, materials. Product Sample (for APL listing) A sample may be requested to verify the product

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/9540100ind.pdf?sfvrsn=98e747f1_1

Program Management Meorandum 23-03

products on the Department’s Approved Product List (APL). Revise specification packages as described, Approved Product List (APL) 10-10-23 1-24 All Jobs DocuSign Envelope ID, OF MATERIALS - SOURCE OF SUPPLY - DEPARTMENT’S APPROVED PRODUCT LIST (APL). (REV 10-10-23) (FA 10-18-23, affected products will be listed on the APL. The list of affected articles, materials, and supplies that have been added to the APL and are not identified in each individual Section can be found

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/bulletins/fpo/2023/program-management-meorandum-23-03.pdf?sfvrsn=1af56637_1

PM Memo 23-03 Mandatory for BABA

products on the Department’s Approved Product List (APL). Revise specification packages as described, Approved Product List (APL) 10-10-23 1-24 All Jobs DocuSign Envelope ID, OF MATERIALS - SOURCE OF SUPPLY - DEPARTMENT’S APPROVED PRODUCT LIST (APL). (REV 10-10-23) (FA 10-18-23, affected products will be listed on the APL. The list of affected articles, materials, and supplies that have been added to the APL and are not identified in each individual Section can be found

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/resources/bulletins/2023/pm-memo-23-03-mandatory-for-baba.pdf?sfvrsn=d86d0c31_1

634-001

. ) Assemblies (See Note 1) APL Span Wire Mounting Signal Cable Coil Or Drip Loop 8" To 12, : requirements, see the vendor drawings on the APL. 10. Use only backplates listed on the APL. For specific, for details and requirements, see the vendor drawings on the APL. 1. Use only span wire mounting assemblies listed on the APL. For specific

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/idx/634-001.pdf?sfvrsn=3dff3c77_1

2024FDM263GeosynDsn

products are included in the Approved Products List ( APL ). 263.2 Contract Plans Content, from the APL will be suitable. Refer to Standard Specification 985 to determine which test values will be available for selecting the products for each application from the APL . Control, approved for the intended application in the APL meeting or exceeding the strength required, structures using geosynthetic materials approved for the intended application in the APL meeting

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm263geosyndsn.pdf?sfvrsn=785760d7_1

2024FDM263GeosynDsn

products are included in the Approved Products List ( APL ). 263.2 Contract Plans Content, from the APL will be suitable. Refer to Standard Specification 985 to determine which test values will be available for selecting the products for each application from the APL . Control, geosynthetic materials approved for the intended application in the APL meeting or exceeding, in the APL meeting or exceeding the strength required in the plans and placed at or less than

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm263geosyndsn.pdf?sfvrsn=66492b38_1

2025FDM263GeosynDsn

products are included in the Approved Products List ( APL ). 263.2 Contract Plans Content, from the APL will be suitable. Refer to Standard Specification 985 to determine which test values will be available for selecting the products for each application from the APL . Control, approved for the intended application in the APL meeting or exceeding the strength required, structures using geosynthetic materials approved for the intended application in the APL

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm263geosyndsn.pdf?sfvrsn=34da4b48_2

2025FDM263GeosynDsn

products are included in the Approved Products List ( APL ). 263.2 Contract Plans Content, from the APL will be suitable. Refer to Standard Specification, Section 985 to determine which test values will be available for selecting the products for each application from the APL. Control, geosynthetic materials approved for the intended application in the APL meeting or exceeding, application in the APL, meeting or exceeding the strength required in the plans and placed at or less than

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm263geosyndsn.pdf?sfvrsn=a14285e7_1

1020509.FHWA

) or the Department’s Approved Products List (APL). Erect the required temporary traffic control, that are on the QPL or the APL. Immediately remove or cover any devices that do not apply to existing, for inclusion on the QPL or APL must comply with the requirements of Section 990 and include detailed vendor, for proper application, field assembly and installation. Ensure that the QPL or APL number is permanently, Approved Product List (APL). Erect the required temporary traffic control devices to prevent any

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/fhwa/1020509.fhwa.pdf?sfvrsn=22c9d445_0

2026FDM263GeosynDsn

. Approved geosynthetic products are included in the Approved Products List (APL). 263.2 Contract Plans, the geosynthetic selected from the APL will be suitable. Refer to Standard Specification, Section 985 to determine which test values will be available for selecting the products for each application from the APL, geosynthetic materials approved for the intended application in the APL meeting or exceeding, in the APL, meeting or exceeding the strength required in the plans and placed at or less than

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm263geosyndsn.pdf?sfvrsn=bb0cf611_2

2026FDM263GeosynDsn

. Approved geosynthetic products are included in the Approved Products List (APL). 263.2 Contract Plans, the geosynthetic selected from the APL will be suitable. Refer to Standard Specification, Section 985 to determine which test values will be available for selecting the products for each application from the APL, geosynthetic materials approved for the intended application in the APL meeting or exceeding, in the APL, meeting or exceeding the strength required in the plans and placed at or less than

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm263geosyndsn.pdf?sfvrsn=2839867c_1

Section35V2-725cln

Tests, Washington, D.C Approved Products List (APL), Florida Department of Transportation Florida, List (APL) , QC Plan approval, required testing procedures and frequencies, and the Department’s, to a Department project, a sample must be submitted for APL approval from each Terminal it is supplied from. Submit laboratory test results for the material and the APL application form to the Product, they do not exceed the Specification requirements. 3.5.6.3 APL Application Create an online APL

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/materials-manual/section35v2-725cln.pdf?sfvrsn=3a949b33_1

Section3.5-051018_1-19WB

Specifications, and Part II Tests, Washington, D.C Approved Products List (APL), Florida Department, ’s Approved Product List (APL) , QC Plan approval, required testing procedures and frequencies, material supplied to a Department project, a sample must be submitted for APL approval from each Terminal it is supplied from. Submit laboratory test results for the material and the APL application form, ) are used, indicate they do not exceed the Specification requirements. 3.5.6.3 APL Application Submit

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/materials-manual/section3-5-051018_1-19wb.pdf?sfvrsn=917015bc_1

Section3.4-051018_1-19WB

I Specifications, and Part II Tests, Washington, D.C Approved Products List (APL), Florida, to the Department’s Approved Product List (APL) , QC Plan approval, required testing procedures, supplied to a Department project, a sample must be submitted for APL approval from each Terminal it is supplied from. Submit laboratory test results for the material and the APL application form, , 2014 Bituminous Materials Revised: May 10, 2018 Asphalt Emulsions 3-4-3 3.4.6.3 APL Application

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/materials-manual/section3-4-051018_1-19wb.pdf?sfvrsn=c10ac767_1

Section34-051815 1-16

Tests, Washington, D.C Approved Products List (APL), Florida Department of Transportation, to material approval for addition to the Department’s Approved Product List (APL), QC Plan approval, for APL approval from each Terminal it is supplied from. Submit laboratory test results for the material and the APL application form to the Product Evaluation Office (PEO). Send a sample of the material, requirements must be approved by the SMO prior to laboratory testing. 3.4.6.3 APL Application

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/materials-manual/section34-051815-1-16.docx?sfvrsn=97829e56_1

Section35-051815 1-16

Tests, Washington, D.C Approved Products List (APL), Florida Department of Transportation, to material approval for addition to the Department’s Approved Product List (APL), QC Plan approval, be submitted for APL approval from each Terminal it is supplied from. Submit laboratory test results for the material and the APL application form to the Product Evaluation Office (PEO). Send a sample, APL Application Submit the Certificate of Analysis (COA) from the laboratory testing along

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/materials-manual/section35-051815-1-16.docx?sfvrsn=22c51609_1

Section3.4-051018_1-19WB

I Specifications, and Part II Tests, Washington, D.C Approved Products List (APL), Florida, to the Department’s Approved Product List (APL) , QC Plan approval, required testing procedures, supplied to a Department project, a sample must be submitted for APL approval from each Terminal it is supplied from. Submit laboratory test results for the material and the APL application form, , 2014 Bituminous Materials Revised: May 10, 2018 Asphalt Emulsions 3-4-3 3.4.6.3 APL Application

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/materials-manual/section3-4-051018_1-19wb.pdf?sfvrsn=e057882a_1

Section3.5-051018_1-19WB

Specifications, and Part II Tests, Washington, D.C Approved Products List (APL), Florida Department, ’s Approved Product List (APL) , QC Plan approval, required testing procedures and frequencies, material supplied to a Department project, a sample must be submitted for APL approval from each Terminal it is supplied from. Submit laboratory test results for the material and the APL application form, ) are used, indicate they do not exceed the Specification requirements. 3.5.6.3 APL Application Submit

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/materials-manual/section3-5-051018_1-19wb.pdf?sfvrsn=4d59cebb_1
20 of 2709 results