9191 search results for test

5550000.impl

soil tight joint requirements. Conduct tests for joint integrity for one hour. The test for a soil, Product Testing: When there is any indication that the installed product has sustained damage and may, a pressure test and reserves the right to be present during the test. Perform pressure test within 24 hours, unless otherwise approved by the Engineer. Furnish a copy of test results to the Engineer, installations to be filled with excavatable flowable fill. 555-3.1.2 Testing Methods: Testing may

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul13/files/5550000.impl.pdf?sfvrsn=eeae8399_0

5460200IMP

these requirements. Submit a certified test report to the Engineer indicating that the materials meet all, inspection by the Engineer with no further testing required

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/programmanagement/implemented/workbooks/history/jul06/files/5460200imp.pdf?sfvrsn=afd9ef55_0

5460200SS

dimensions by using a self bonding overlay meeting these requirements. Submit a certified test report, with no further testing required

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2006/files/5460200ss.pdf?sfvrsn=afbf9227_0

5460200IMP

these requirements. Submit a certified test report to the Engineer indicating that the materials meet all, inspection by the Engineer with no further testing required

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan06/files/5460200imp.pdf?sfvrsn=3b536b28_0

5460200.impl

dimensions by using a self bonding overlay meeting these requirements. Submit a certified test report, with no further testing required

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan10/files/5460200.impl.pdf?sfvrsn=ea27bc50_0

SS5460200

dimensions by using a self bonding overlay meeting these requirements. Submit a certified test report, with no further testing required

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2010/files/ss5460200.pdf?sfvrsn=8ccf6581_0

1050404-MM92V2.comm

) 9.2.13.2 Qualified Technicians If personnel perform concrete placment, plastic properties test, to cementitious materials ratio, they shall be certified as an ACI Concrete Field Testing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/comments-responses/1050404-mm92v2.comm.pdf?sfvrsn=e0b4dc21_0

1050404-MM92V2.resp

Technicians If personnel perform concrete placment, plastic properties test, such as slump, materials ratio, they shall be certified as an ACI Concrete Field Testing Technician Grade I Please

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/comments-responses/1050404-mm92v2.resp.pdf?sfvrsn=6d751199_0

5460200SS

dimensions by using a self bonding overlay meeting these requirements. Submit a certified test report, with no further testing required

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2006/january-2006/workbook/5460200ss838a9468ea6e464d98ccfffbee523174.pdf?sfvrsn=d38cc4e5_0

5460200SS

dimensions by using a self bonding overlay meeting these requirements. Submit a certified test report, with no further testing required

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2006/january-2006/workbook/5460200ss.pdf?sfvrsn=2f3e0c5c_0

SS5460200

dimensions by using a self bonding overlay meeting these requirements. Submit a certified test report, with no further testing required

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2010/january-2010/workbook/ss5460200.pdf?sfvrsn=1503e428_0

SS5460200

test report to the Engineer indicating that the materials meet all requirements specified. Before, with no further testing required

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/ss5460200.pdf?sfvrsn=514b9d17_0

6850000-723impl

, parts layout and parts lists. 685-4 Testing. Provide a field acceptance test plan to the Engineer for approval at least 14 days prior to commencement of testing. After approval of the acceptance test plan, perform testing of the installed UPS and RPMU equipment. Furnish all equipment, software, and supplies necessary for conducting the test. 685-5 Warranty. Ensure the UPS includes, , placement, and testing of all equipment and materials as specified in the Contract Documents, and all

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/implemented/6850000-723impl.pdf?sfvrsn=9400c386_1

spi-521-510

non-proprietary crash tested concrete barrier / noise wall combination for use on FDOT retaining, on the recommendation by the crash test researchers at Texas Transportation Institute (TTI). Although the TL-4

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2019/spi/spi-521-510.pdf?sfvrsn=14973052_6

SPI-521-510

non-proprietary crash tested concrete barrier / noise wall combination for use on FDOT retaining, on the recommendation by the crash test researchers at Texas Transportation Institute (TTI). Although the TL-4

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2020/spi/spi-521-510.pdf?sfvrsn=1117443a_2

SPI-521-510

non-proprietary crash tested concrete barrier / noise wall combination for use on FDOT retaining, on the recommendation by the crash test researchers at Texas Transportation Institute (TTI). Although the TL-4

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/spi/spi-521-510.pdf?sfvrsn=1bd092ab_1

SDB17-07

installations: Projects let prior to July 1, 2018: Have been successfully crash tested to Test Level 4, been successfully crash tested in accordance with LRFD and MASH to:  Test Level 3 (minimum, successfully crash tested to Test Level 3 (minimum) in accordance with LRFD and either NCHRP Report 350 or MASH. Projects let January 1, 2020 and later: Have been successfully crash tested to Test Level, successfully crash tested to Test Level 2 (minimum) in accordance with LRFD and either NCHRP

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/content/design/bulletins/sdb17-07.pdf?sfvrsn=df1218f2_0

9600202.origind

in this Section to perform all testing and to provide submit certified test reports for materials, than 20 minutes. 2.Remolded finished material has a minimum failure time of three hours when tested, States, only if the facility is pre-approved by the State Materials Office. Conform all testing procedures used for materials or components to applicable American Society of Testing and Materials, : 960-3.2.1.1FillerContainmentAssembly Pressure Test: 1. A s s e mble a n c h o r a g e a n d a n c h o r a ge cap

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/internal/9600202.origind.pdf?sfvrsn=16e99277_0

9330100-122origind

and the producer’s certified mill analysis certifying that the test results meet the specification limits of ASTM, , all test results required by ASTM A416 and ASTM A1114. Include the modulus of elasticity expressed, submit to the State Materials Office (SMO), a test report of the physical and mechanical property requirements in Table 933-3. Qualification testing shall be conducted by an independent laboratory approved by the Department for performing the FRP test methods. Three production LOTS shall

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/internal/9330100-122origind.pdf?sfvrsn=c30e5108_2

330090405FHWA

structures, ramps, acceleration/deceleration lanes and other areas not suitable for testing with the laser profiler, will be tested and accepted by straightedging. Test all pavement lanes and ramps, with the laser profiler, will be tested and accepted by straightedging. Test all pavement lanes and ramps, 4-23-24) SUBARTICLE 330-9.4.5.1 is deleted and the following substituted: 330-9.4.5 QC Testing, is by straightedge testing, Sstraightedge these areas of the final Type SP structural layer in accordance

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/review/fhwa/330090405fhwa.pdf?sfvrsn=d1d76b9d_1
20 of 9191 results