4643 search results for fla

5300201FHWA

(Sodium Sulphate) (AASHTO T 104) Maximum loss 12%** (after five cycles) Flat and elongated pieces, than 1.90 and that is reasonably free from thin, flat and elongated pieces. Ensure that the bedding

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/fhwa/5300201fhwa.pdf?sfvrsn=9613af68_1

444634-1_SR72_WQIE-Final

that the existing pond is used for fishing, small (non-motorized) boats, and wading. o Flat and easily, for nutrients • Cow Pen Slough Basin (WBID 1924) • Impaired for nutrients • Topography • Flat

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26123/444634-1_sr72_wqie-final.pdf?sfvrsn=1597fa06_1

550-011

. For treatment at the bridge ends, see Sheet 1. NOTES: Flat Washers for Expansion Rail Connections Hex Nuts, Plate Post � Post 9" Post 3 " 3 " 6 " " ℅ Base Plate Ƃ " Ɓ 1 " ƀ 6 " Ɓ 1 Ɖ Flat Washers

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/idx/550-011.pdf?sfvrsn=b8712c6c_1

102-110FHWAApproved

) Flat Slab Bridge (Similar) Railing Transition & End Post, Beam or Girder 32" F or New Jersey, , Flat Slab Bridge 32" F or New Jersey Shape Traffic Railing, Anchored Type K Barrier 1'-0" ± Anchored Type K Barrier End Post Transition Railing Traffic Railing Bridge (Shown) Flat Slab, ) Railing Transition & End Post, Flat Slab Bridge 32" F or New Jersey Shape Traffic Railing, Splice (See, ) Flat Slab Bridge (Similar) Railing Transition & End Post, Beam or Girder F-Shape or New Jersey Shape

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2027/102-110fhwaapproved.pdf?sfvrsn=b6bee622_1

Systemic Safety Analysis - Technical Memorandum

are:  Centerline Hardening  Extend Yellow Change Interval  Flashing Yellow Arrow  High Emphasis, — — — —* 0.540 Extend Yellow Change Interval Rear End KABCO Urban — 3, 4 4209 0.934 Flashing Yellow

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/trafficservices/strides2zero/systemic-safety-analysis---technical-memorandum.pdf?sfvrsn=60fb6fa_1

E6O75BidTabs

2 12 MIDBLOCK CROSSWALK: RECTANGULAR RAPID FLASHING BEACON, FURNISH & INSTALL- AC, COMPLETE, 88,000.00 0710 0654 2 15 MIDBLOCK CROSSWALK: RECTANGULAR RAPID FLASHING BEACON, FURNISH & INSTALL, CROSSWALK: RECTANGULAR RAPID FLASHING BEACON, FURNISH & INSTALL- SOLAR, COMPLETE SIGN ASSEMBLY- BACK, 0654 2 60 MIDBLOCK CROSSWALK: RECTANGULAR RAPID FLASHING BEACON, REMOVE COMPLETE SIGN ASSEMBLY

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/bid-tabs/2024/oct24/e6o75bidtabs.pdf?sfvrsn=e9da4ccb_1

E3Y80-R0

- POLE/PEDESTAL TO REMAIN AS 2.000 0654- 2- 21 MIDBLOCK CROSSWALK: RECTANGULAR RAPID FLASHING, MIDBLOCK CROSSWALK: RECTANGULAR RAPID FLASHING BEACON, FURNISH & INSTALL- SOLAR, COMPLETE SIGN ASSEMBLY

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2025/jun12/e3y80-r0.pdf?sfvrsn=30556f8e_1

E1X96BidTabs

MIDBLOCK CROSSWALK: RECTANGULAR RAPID FLASHING BEACON, FURNISH & INSTALL- SOLAR, COMPLETE SIGN ASSY, RAPID FLASHING BEACON, FURNISH & INSTALL- SOLAR, COMPLETE SIGN ASSEMBLY- BACK TO BACK 2.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/bidtabs/2025/jun05/e1x96bidtabs.pdf?sfvrsn=b423bfef_1

45403215201-PLANS-03-SIGNALIZATION

) WHEN ALL LANES, STRIPING, SIGNALS AND B. WHEN SIGNAL IS IN FLASHING MODE, MOVEMENTS 2 AND 6 SHALL FLASH YELLOW. ALL OTHER MOVEMENTS SHALL FLASH RED. A. CONCURRENT/ ACTUATED PEDESTRIAN MOVEMENTS, MEMORY FLASHING DON'T WALK DUAL ENTRY DET. CROSS SWITCH. RECALL 2 5 6 7 8 3 4 ENGINEER, OLA FLASH YELLOW DURING PH 2 AND 3. OLB IS SIGNAL HEAD 5. OLA IS SIGNAL HEAD 1. IT WILL SHOW

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25127/45403215201-plans-03-signalization.pdf?sfvrsn=2057c2d_1

PublicHearing_DISTRICTWIDE_Summary_2024-2028

Federal $5,507,559 State $511,924 Total for Project 445299-1 $6,019,483 447849-1 - I-95 FLAGLER WEIGH, 449288-1 $700,000 450227-1 - I-4 & I-95 WRONG WAY DRIVING BUNDLE #1 (VOLUSIA & FLAGLER) Type of Work, 22 SUBJECT TO CHANGE DISTRICTWIDE Maintenance 429078-2 - ASSET MAINTENANCE - FLAGLER & VOLUSIA, for Project 449486-2 $3,646,404 $3,646,404 $1,215,468 449487-1 - VOLUSIA & FLAGLER ASSET MAINTENANCE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_districtwide_summary.pdf?sfvrsn=3a2c060b_4

Mobility Week News

Elementary (Flagler) - Annalise Quesenberry, 2nd grade; Sofia Ospanova, 4th grade HOME

https://www.fdot.gov/projects/mobilityweek/mobility-week-news.shtm
20 of 4643 results