4568 search results for Standard Specifications

E21U1

the surface texture requirements described in section 327-3.1.1 of the current FDOT Standard Specifications, PAVEMENT MARKINGS, STANDARD, WHITE, SOLID, 6" GM 3.030 0710- 11-131 PAINTED PAVEMENT MARKINGS, STANDARD, , STANDARD, YELLOW, SOLID, 6" GM 1.439 0711- 15-101 THERMOPLASTIC, STANDARD-OPEN GRADED ASPHALT SURFACES WHITE, SOLID, 6" GM 1.496 0711- 15-131 THERMOPLASTIC, STANDARD-OPEN GRADED ASPHALT SURFACES, WHITE, SKIP, 6",10-30 SKIP OR 3-9 LANE DROP GM 5.530 0711- 15-201 THERMOPLASTIC, STANDARD-OPEN GRADED

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2025/may21/e21u1.pdf?sfvrsn=fba62578_1

SPI-550-012

 Standard Plans Instructions Topic No. 625-010-003 Index 550-012 Bridge Fencing (Enclosed) FY, Specifications; NCHRP Report 350 Test Level 3 Criteria (portion of fence adjacent to traffic railing only, with the AASHTO Guide Specifications for Bridge Railings Performance Level 2 pickup test. Modifications, and 521-428 Traffic Railings, certain non-FDOT standard concrete traffic railings meeting the requirements of SDG 6.7 and on existing New Jersey and F-Shape Traffic Railings listed in the Standard Plans

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-550-012.pdf?sfvrsn=53c143b7_1

SPI-550-012

 Standard Plans Instructions Topic No. 625-010-003 Index 550-012 Bridge Fencing (Enclosed) FY, Specifications; NCHRP Report 350 Test Level 3 Criteria (portion of fence adjacent to traffic railing only, with the AASHTO Guide Specifications for Bridge Railings Performance Level 2 pickup test. Modifications, and 521-428 Traffic Railings, certain non-FDOT standard concrete traffic railings meeting the requirements of SDG 6.7 and on existing New Jersey and F-Shape Traffic Railings listed in the Standard Plans

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/spi/spi-550-012.pdf?sfvrsn=64e1b81c_1

7100403-722origind

 ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance, : Will the proposed revision require changes to: Publication Yes No Office Staff Contacted Standard Plans, , State Specifications Engineer SUBJECT: Proposed Specification: 7100403 Painted Pavement Markings, value in the Standard Specification. Please share this proposal with others within your

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/7100403-722origind.pdf?sfvrsn=8b7bcc2_2

0010300-122impl

the Contract. Standard Specifications: “Standard Specifications for Road and Bridge Construction, of materials and labor. Supplemental Specifications: Approved additions and revisions to the Standard, by the Department that add to or revise the Standard Specifications or supplemental specifications, setting forth conditions varying from or additional to the Standard Specifications applicable, in the Contract Documents, it will be synonymous with Standard Plans. Standard Specifications. See definition

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/implemented/0010300-122impl.pdf?sfvrsn=32d482d2_2

FDM251A_E&SC_ERP-AH-Vol1_2024.06.28

, ERP AH Vol. 1, the FDOT Standard Specifications for Road and Bridge Construction (FDOT Standard, permit application. The FDOT Standard Specifications serve as the directions, provisions, FDOT projects. The FDOT Standard Specifications require all contractors to develop a site-specific, or property beyond the project limits (Specification 104-3). The FDOT Standard Specifications, the AH Vol. I, Part IV, Section 11.2, requirements and the corresponding FDOT Standard Specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/drainage/files/fdm251a_e-sc_erp-ah-vol1_2024-06-28.docx?sfvrsn=bd283183_3

NarrativeE_SC_1

, ERP AH Vol. 1, the FDOT Standard Specifications for Road and Bridge Construction (FDOT Standard, permit application. The FDOT Standard Specifications serve as the directions, provisions, FDOT projects. The FDOT Standard Specifications require all contractors to develop a site-specific, or property beyond the project limits (Specification 104-3). The FDOT Standard Specifications, the AH Vol. I, Part IV, Section 11.2, requirements and the corresponding FDOT Standard Specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/drainage/files/narrativee_sc_1.docx?sfvrsn=63aebcc6_6

DRAFT_ERP_ESC_Narrative

, ERP AH Vol. 1, the FDOT Standard Specifications for Road and Bridge Construction (FDOT Standard, permit application. The FDOT Standard Specifications serve as the directions, provisions, FDOT projects. The FDOT Standard Specifications require all contractors to develop a site-specific, or property beyond the project limits (Specification 104-3). The FDOT Standard Specifications, the AH Vol. I, Part IV, Section 11.2, requirements and the corresponding FDOT Standard Specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/engineers/environmental/draft_erp_esc_narrative.docx?sfvrsn=557f9a63_2

2000701int

? The Standard Specifications eBook and Wo rkbook are effective July 1st every year. 2000201 ROCK BASE (REV,  Origination Form Specifications Name: Dino Jameson Specification Number: 200-7.1, specifications. This was due to 120 section revisions to numbering and moving things around to flow, other types of specifications? Neither List Specifications Affected: Other Affected Documents/Offices Contacted Yes/No Other Standard Plans No Florida Design Manual No Structures Manual

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/review/fy2025-26/internal/2000701int.pdf?sfvrsn=c14a718e_1

0010003SS

of Contract, Executed Form of Contract, Performance Bond and Payment Bond, Standard Specifications, to or revise the Standard Specifications or supplemental specifications, setting forth conditions varying from or additional to the Standard Specifications applicable to a specific project, of a Section of these Specifications. Bidder. Anindividual, firm, or corporation submitting a proposal, by the Contractor, covering minor changes in the plans, specifications, or quantities of work, within

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2006/january-2006/workbook/0010003ss.pdf?sfvrsn=c9960c7b_0

9951400-723impl

with Military Standard MIL-PRF-24712A or AAMA-2603-02. Finish must meet the requirements of ASTM D3359, ASTM, equipment and components that meet the requirements of these minimum specifications and are listed, requirements of the AASHTO LRFD Specifications for Structural Supports for Highway Signs, Luminaires, in accordance with the Standard Plans. The structural aluminum Z members must run parallel, , Section 1.6. 995-16.3.1 LED and Pixel Specifications: LED lamps must have a minimum viewing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/implemented/9951400-723impl.pdf?sfvrsn=360a34c4_1

2024FDM914GenNotes

or curtail requirements in the Standard Specifications or Standard Plans . General notes are not a substitute for specifications. Product and material requirements must be included in the applicable, in the Standard Specifications and Standard Plans . Other rules to follow include: (1) Do, of payment information contained in the Standard Specifications , such as: • Clarify how, of the proposed language is the responsibility of the District Specifications Office. 914.2 General

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm914gennotes.pdf?sfvrsn=a4dd976c_1

2025FDM914GenNotes

or curtail requirements in the Standard Specifications or Standard Plans. General notes are not a substitute for specifications . Product and material requirements must be included in the applicable, in the Standard Specifications and Standard Plans. Other rules to follow include: (1) Do not include, in the Standard Specifications, such as: • Clarify how incidental work is to be paid, acceptance of the proposed language is the responsibility of the District Specifications Office. 914.2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm914gennotes.pdf?sfvrsn=78550f6e_1

9950100-723origind

- specifications.shtm Manufacturer’s Product Specifications Include product specifications showing,  ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance, : Will the proposed revision require changes to: Publication Yes No Office Staff Contacted Standard Plans, of the following types of specifications (Hover over type to go to site.): Special Provisions

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/internal/9950100-723origind.pdf?sfvrsn=f2ae14c3_1

SPI-350-001

 Standard Plans Instructions Topic No. 625-010-003 Index 350-001 Concrete Pavement Joints FY 2024-25 1 Index 350-001 Concrete Pavement Joints Design Criteria Rigid Pavement Design Manual (RPDM) Design Assumptions and Limitations The drawings shown in this Index include details, of the specifications. Plan Content Requirements Detail the location and dimensions of concrete, - Curb-Concrete Pavement Joint LF See the BOE and Specifications for additional information

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-350-001.pdf?sfvrsn=2e8a775b_2

SPI-350-001

 Standard Plans Instructions Topic No. 625-010-003 Index 350-001 Concrete Pavement Joints FY 2025-26 1 Index 350-001 Concrete Pavement Joints Design Criteria Rigid Pavement Design Manual (RPDM) Design Assumptions and Limitations The drawings shown in this Index include details, of the specifications. Plan Content Requirements Detail the location and dimensions of concrete pavement, - Curb-Concrete Pavement Joint LF See the BOE and Specifications for additional information

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/spi/spi-350-001.pdf?sfvrsn=c6c1b496_1

6340203.orig

 ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Date: Specification Section: Originator: Articles/Subarticles: Telephone: email: Will the proposed revision involve Design Standard Index changes? Yes No Roadway Design staff contact ed ( name ) : Will the proposed revision involve PPM changes? Yes, the State Specifications Office for assistance in completing this form. Daniel Scheer 850-414-4130

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/comments-responses/6340203.orig.pdf?sfvrsn=e0d1b28e_0

SPM0010300-724-i19160

, Executed Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, of the work. In this contract, references to “the plans” mean the Department’s Standard Plans, plans” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/maintenance/finalized/spm0010300-724-i19160.pdf?sfvrsn=52e1354f_1

SPM0010300-725-i19840

, Executed Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, of the work. In this contract, references to “the plans” mean the Department’s Standard Plans, plans” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/maintenance/finalized/spm0010300-725-i19840.pdf?sfvrsn=af1d696a_1

SPM0010300-723-i18538

, Executed Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, of the work. In this contract, references to “the plans” mean the Department’s Standard Plans, plans” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/maintenance/finalized/spm0010300-723-i18538.pdf?sfvrsn=c7e5aca5_2
20 of 4568 results