4568 search results for Standard Specifications
E21U1
the surface texture requirements described in section 327-3.1.1 of the current FDOT Standard Specifications, PAVEMENT MARKINGS, STANDARD, WHITE, SOLID, 6" GM 3.030 0710- 11-131 PAINTED PAVEMENT MARKINGS, STANDARD, , STANDARD, YELLOW, SOLID, 6" GM 1.439 0711- 15-101 THERMOPLASTIC, STANDARD-OPEN GRADED ASPHALT SURFACES WHITE, SOLID, 6" GM 1.496 0711- 15-131 THERMOPLASTIC, STANDARD-OPEN GRADED ASPHALT SURFACES, WHITE, SKIP, 6",10-30 SKIP OR 3-9 LANE DROP GM 5.530 0711- 15-201 THERMOPLASTIC, STANDARD-OPEN GRADED
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2025/may21/e21u1.pdf?sfvrsn=fba62578_1SPI-550-012
Standard Plans Instructions Topic No. 625-010-003 Index 550-012 Bridge Fencing (Enclosed) FY, Specifications; NCHRP Report 350 Test Level 3 Criteria (portion of fence adjacent to traffic railing only, with the AASHTO Guide Specifications for Bridge Railings Performance Level 2 pickup test. Modifications, and 521-428 Traffic Railings, certain non-FDOT standard concrete traffic railings meeting the requirements of SDG 6.7 and on existing New Jersey and F-Shape Traffic Railings listed in the Standard Plans
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-550-012.pdf?sfvrsn=53c143b7_1SPI-550-012
Standard Plans Instructions Topic No. 625-010-003 Index 550-012 Bridge Fencing (Enclosed) FY, Specifications; NCHRP Report 350 Test Level 3 Criteria (portion of fence adjacent to traffic railing only, with the AASHTO Guide Specifications for Bridge Railings Performance Level 2 pickup test. Modifications, and 521-428 Traffic Railings, certain non-FDOT standard concrete traffic railings meeting the requirements of SDG 6.7 and on existing New Jersey and F-Shape Traffic Railings listed in the Standard Plans
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/spi/spi-550-012.pdf?sfvrsn=64e1b81c_17100403-722origind
ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance, : Will the proposed revision require changes to: Publication Yes No Office Staff Contacted Standard Plans, , State Specifications Engineer SUBJECT: Proposed Specification: 7100403 Painted Pavement Markings, value in the Standard Specification. Please share this proposal with others within your
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/7100403-722origind.pdf?sfvrsn=8b7bcc2_20010300-122impl
the Contract. Standard Specifications: “Standard Specifications for Road and Bridge Construction, of materials and labor. Supplemental Specifications: Approved additions and revisions to the Standard, by the Department that add to or revise the Standard Specifications or supplemental specifications, setting forth conditions varying from or additional to the Standard Specifications applicable, in the Contract Documents, it will be synonymous with Standard Plans. Standard Specifications. See definition
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/implemented/0010300-122impl.pdf?sfvrsn=32d482d2_2FDM251A_E&SC_ERP-AH-Vol1_2024.06.28
, ERP AH Vol. 1, the FDOT Standard Specifications for Road and Bridge Construction (FDOT Standard, permit application. The FDOT Standard Specifications serve as the directions, provisions, FDOT projects. The FDOT Standard Specifications require all contractors to develop a site-specific, or property beyond the project limits (Specification 104-3). The FDOT Standard Specifications, the AH Vol. I, Part IV, Section 11.2, requirements and the corresponding FDOT Standard Specifications
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/drainage/files/fdm251a_e-sc_erp-ah-vol1_2024-06-28.docx?sfvrsn=bd283183_3NarrativeE_SC_1
, ERP AH Vol. 1, the FDOT Standard Specifications for Road and Bridge Construction (FDOT Standard, permit application. The FDOT Standard Specifications serve as the directions, provisions, FDOT projects. The FDOT Standard Specifications require all contractors to develop a site-specific, or property beyond the project limits (Specification 104-3). The FDOT Standard Specifications, the AH Vol. I, Part IV, Section 11.2, requirements and the corresponding FDOT Standard Specifications
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/drainage/files/narrativee_sc_1.docx?sfvrsn=63aebcc6_6DRAFT_ERP_ESC_Narrative
, ERP AH Vol. 1, the FDOT Standard Specifications for Road and Bridge Construction (FDOT Standard, permit application. The FDOT Standard Specifications serve as the directions, provisions, FDOT projects. The FDOT Standard Specifications require all contractors to develop a site-specific, or property beyond the project limits (Specification 104-3). The FDOT Standard Specifications, the AH Vol. I, Part IV, Section 11.2, requirements and the corresponding FDOT Standard Specifications
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/engineers/environmental/draft_erp_esc_narrative.docx?sfvrsn=557f9a63_22000701int
? The Standard Specifications eBook and Wo rkbook are effective July 1st every year. 2000201 ROCK BASE (REV, Origination Form Specifications Name: Dino Jameson Specification Number: 200-7.1, specifications. This was due to 120 section revisions to numbering and moving things around to flow, other types of specifications? Neither List Specifications Affected: Other Affected Documents/Offices Contacted Yes/No Other Standard Plans No Florida Design Manual No Structures Manual
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/review/fy2025-26/internal/2000701int.pdf?sfvrsn=c14a718e_10010003SS
of Contract, Executed Form of Contract, Performance Bond and Payment Bond, Standard Specifications, to or revise the Standard Specifications or supplemental specifications, setting forth conditions varying from or additional to the Standard Specifications applicable to a specific project, of a Section of these Specifications. Bidder. Anindividual, firm, or corporation submitting a proposal, by the Contractor, covering minor changes in the plans, specifications, or quantities of work, within
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2006/january-2006/workbook/0010003ss.pdf?sfvrsn=c9960c7b_09951400-723impl
with Military Standard MIL-PRF-24712A or AAMA-2603-02. Finish must meet the requirements of ASTM D3359, ASTM, equipment and components that meet the requirements of these minimum specifications and are listed, requirements of the AASHTO LRFD Specifications for Structural Supports for Highway Signs, Luminaires, in accordance with the Standard Plans. The structural aluminum Z members must run parallel, , Section 1.6. 995-16.3.1 LED and Pixel Specifications: LED lamps must have a minimum viewing
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/implemented/9951400-723impl.pdf?sfvrsn=360a34c4_12024FDM914GenNotes
or curtail requirements in the Standard Specifications or Standard Plans . General notes are not a substitute for specifications. Product and material requirements must be included in the applicable, in the Standard Specifications and Standard Plans . Other rules to follow include: (1) Do, of payment information contained in the Standard Specifications , such as: • Clarify how, of the proposed language is the responsibility of the District Specifications Office. 914.2 General
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm914gennotes.pdf?sfvrsn=a4dd976c_12025FDM914GenNotes
or curtail requirements in the Standard Specifications or Standard Plans. General notes are not a substitute for specifications . Product and material requirements must be included in the applicable, in the Standard Specifications and Standard Plans. Other rules to follow include: (1) Do not include, in the Standard Specifications, such as: • Clarify how incidental work is to be paid, acceptance of the proposed language is the responsibility of the District Specifications Office. 914.2
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm914gennotes.pdf?sfvrsn=78550f6e_19950100-723origind
- specifications.shtm Manufacturer’s Product Specifications Include product specifications showing, ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Contact the State Specifications Office for assistance, : Will the proposed revision require changes to: Publication Yes No Office Staff Contacted Standard Plans, of the following types of specifications (Hover over type to go to site.): Special Provisions
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/internal/9950100-723origind.pdf?sfvrsn=f2ae14c3_1SPI-350-001
Standard Plans Instructions Topic No. 625-010-003 Index 350-001 Concrete Pavement Joints FY 2024-25 1 Index 350-001 Concrete Pavement Joints Design Criteria Rigid Pavement Design Manual (RPDM) Design Assumptions and Limitations The drawings shown in this Index include details, of the specifications. Plan Content Requirements Detail the location and dimensions of concrete, - Curb-Concrete Pavement Joint LF See the BOE and Specifications for additional information
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/spi/spi-350-001.pdf?sfvrsn=2e8a775b_2SPI-350-001
Standard Plans Instructions Topic No. 625-010-003 Index 350-001 Concrete Pavement Joints FY 2025-26 1 Index 350-001 Concrete Pavement Joints Design Criteria Rigid Pavement Design Manual (RPDM) Design Assumptions and Limitations The drawings shown in this Index include details, of the specifications. Plan Content Requirements Detail the location and dimensions of concrete pavement, - Curb-Concrete Pavement Joint LF See the BOE and Specifications for additional information
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/spi/spi-350-001.pdf?sfvrsn=c6c1b496_16340203.orig
ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Date: Specification Section: Originator: Articles/Subarticles: Telephone: email: Will the proposed revision involve Design Standard Index changes? Yes No Roadway Design staff contact ed ( name ) : Will the proposed revision involve PPM changes? Yes, the State Specifications Office for assistance in completing this form. Daniel Scheer 850-414-4130
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/comments-responses/6340203.orig.pdf?sfvrsn=e0d1b28e_0SPM0010300-724-i19160
, Executed Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, of the work. In this contract, references to “the plans” mean the Department’s Standard Plans, plans” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/maintenance/finalized/spm0010300-724-i19160.pdf?sfvrsn=52e1354f_1SPM0010300-725-i19840
, Executed Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, of the work. In this contract, references to “the plans” mean the Department’s Standard Plans, plans” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/maintenance/finalized/spm0010300-725-i19840.pdf?sfvrsn=af1d696a_1SPM0010300-723-i18538
, Executed Form of Contract, Performance Bond and Payment Bond, Specifications, Plans (including revisions thereto issued during construction), Standard Plans, Addenda, or other information mailed, in these Specifications, it is provided that whenever anything is, or is to be done, if, as, or, when, of the work. In this contract, references to “the plans” mean the Department’s Standard Plans, plans” mean such plans and the Department’s Standard Plans, and revisions thereto current at the time
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/maintenance/finalized/spm0010300-723-i18538.pdf?sfvrsn=c7e5aca5_2