981 search results for curb ramp

2025FDMPart2DesignCriteria

ramp Design Speeds for Express Lanes ramps are included in Table 201.5.2 . 201.5.2 Post, point. (3) Speeds shown in this table are posted speeds. Interchange Ramp Areas: Connections within the interchange ramp area require the following spacing from the end of the ramp taper: • 440, openings within the interchange ramp area require the following standard distance from the end of the ramp taper: • 2,640 feet for full median opening • 1,320 feet for directional median opening

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdmpart2designcriteria.pdf?sfvrsn=27f348d6_9

44965615201-PLANS-01-ROADWAY

EL. 18.82 41.11' RT. STA. 713+74.41 STA. 713+57.03 CURB RAMP STA. 713+40.07 CURB RAMP E L, . 712+70.54 CURB RAMP STA. 712+88.02 CURB RAMP 10' E L . 1 8 . 7 8 ' E L . 1 8 . 8, . 4 5 7 % STA. 712+69.47 CURB RAMP EL. 17.95 80.58' RT. STA. 712+70.52 STA. 712+54.86 CURB RAMP EL. 18.74 41.15' RT. STA. 712+28.43 ( - ) 0 . 3 0 0 % 23' VC K=18 E L . 1, ' LT. STA. 713+26.54 STA. 713+26.10 CURB RAMP ( - ) 0 . 5 6 4 % STA. 713+46.31 CURB RAMP

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25132/44965615201-plans-01-roadway.pdf?sfvrsn=66fdb30f_1

2025FDM925RdwyXSections

of cross sections within the plan set should be the mainline, side streets, then ramps. Display, (e.g., Easy Street), or ramp (e.g., Ramp A). Indicate exception limits (e.g., Bridge No. 770175 STA, existing ground lines. (4) Show below-ground portions of existing features, e.g., pavement, curb, sidewalk

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm925rdwyxsections.pdf?sfvrsn=29899163_1

Design Standards 2002 Interim

of 5 ei0304s1of5.pdf ei0304s1of5r1.pdf Public Sidewalk Curb Ramps - Revised: 04-11-02 - Expanded to include curb ramp detectable warning. See flag on drawing for implementation information.Revised, PUBLIC SIDEWALK CURB RAMPS - Revised 7-24-02 - Replaces Index No. 304.NOTE: This file includes Sheet 5

https://www.fdot.gov/roadway/ds/02/istds.shtm

E21E0-R0BidTabs

and replacement of concrete mitered end sections, sidewalks, driveways, curb and gutter, ditch pavement, ADA ramps, ASPHALT PAVEMENT 5.000 TN 0025 0425 1205 INLETS, CURB, TYPE 9, PARTIAL 1.000 EA 0030 0425 1209 INLETS, CURB, TYPE 9, MODIFY 1.000 EA 0035 0425 5 MANHOLE, ADJUST 1.000 EA Page 1 of 13, , CURB INLET 1.000 EA 0055 0425 15 51 INLET TOP, REPLACE, CURB INLET 1.000 EA 0060 0430991 1 MITERED END SECT, REPLACE SLAB- MAINTENANCE USE ONLY 20.000 CY 0065 0520 1 7 CONCRETE CURB

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/bid-tabs/2023/jul19/e21e0-r0bidtabs.pdf?sfvrsn=1dd47f43_3

102-240

536-001 Grade Beam 5'-0" 5'-0" Ramp Span Approach Span B B D D C C PARTIAL PLAN - APPROACH, ' - 1 " W-Beam Guardrail See Index 536-001 5'-0" 5'-0" Ramp Span Approach Span B B PARTIAL, Limits of Payment for (See Index 102-110 for details) Stakes (Typ.) 5'-0" 5'-0" Ramp Span, BRIDGE THRIE-BEAM GUARDRAIL 11/01/16 5 6 102-240 Offset Block(s) as required Approach Span Curb, ) (Timber shown; Bent Cap Steel similar) (Timber shown; Bent Cap Ramp Span Deck Timber Lagging

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/idx/102-240.pdf?sfvrsn=d60f0582_1

102-240

536-001 Grade Beam 5'-0" 5'-0" Ramp Span Approach Span B B D D C C PARTIAL PLAN - APPROACH, ' - 1 " W-Beam Guardrail See Index 536-001 5'-0" 5'-0" Ramp Span Approach Span B B PARTIAL PLAN, of Payment for (See Index 102-110 for details) Stakes (Typ.) 5'-0" 5'-0" Ramp Span Approach Span D, GUARDRAIL 11/01/16 5 6 102-240 Offset Block(s) as required Approach Span Curb Guardrail Post, ; Bent Cap Steel similar) (Timber shown; Bent Cap Ramp Span Deck Timber Lagging Offset Blocks

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/102-240.pdf?sfvrsn=6820e45a_1

2024FDM231Lighting

and entrance ramps, respectively. Rest Areas: (1) Analyze each ramp as defined for limited access, , excluding undivided segments and ramps (2) 15 degrees for weigh stations, agricultural stations, these illumination levels. On ramps, either high mast lighting values or the corridor’s lighting values may, throughout all ramps in the interchange. For high mast lighting, the effects of elevated ramps and bridge, of travel). Each zone will be bounded by the back of sidewalk and the back of the median curb. (2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm231lighting.pdf?sfvrsn=4c307db1_1

2024FDM231Lighting

degrees for limited access facilities, excluding undivided segments and ramps (2) 15 degrees for weigh, mast style lights may work in conjunction to achieve these illumination levels. On ramps, either, , so long as consistent lighting value requirements are used throughout all ramps in the interchange. For high mast lighting, the effects of elevated ramps and bridge decks must be accounted, by the back of sidewalk and the back of the median curb. (2) Analyze multi-lane undivided roadway segments

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm231lighting.pdf?sfvrsn=656269b5_4

2018FDM201DesignControls

on the State Highway System. 201.4.1.1 Ramps The minimum design speed for ramps are as follows:  30 mph for Loop Ramps and Semi-Direct Connections.  35 mph for Outer Cloverleaf Connections  50 mph for Direct Connections  40 mph for Intermediate Portions of Long Ramps 8 January 1, 2018, toll lanes. The design speed for a ramp between two express lanes or between an express lane and a high-speed facility is typically 60 mph, but not less than 40 mph. The design speed for a ramp

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2018/2018fdm201designcontrols.pdf?sfvrsn=a766b375_4

Standard Plans - FY 2023-24 Errata

); Corrected callout print error. 522-002 2 of 7 05/24/2024 Detectable Warnings and Sidewalk Curb Ramps, Redline Sheets Errata Date Index Title Description 000-525 2 of 5 05/09/2023 Ramp Terminals Corrected

https://www.fdot.gov/design/standardplans/2024/Errata.shtm

2024FDM214Drwys

, • crossovers, • sidewalks, • curb cut ramps, • signing, • pavement marking, • required, 24’ Min 36’ Max F Flare (Drop Curb) 10’ Min 10’ Min N/A R Radial Returns (Radius) N/A See Note 3, Flare (Drop Curb) N/A N/A N/A R Radial Returns (Radius) 15’ Min 25’ Std 50’ Max 25’ Min 50’ Std, radius for the design vehicle • The radial return radius (curb radius) may be reduced, interchange ramps Topic #625-000-002 FDOT Design Manual 214 - Driveways Requirements

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm214drwys.pdf?sfvrsn=e86cb8c8_1

2024FDM214Drwys

, • crossovers, • sidewalks, • curb cut ramps, • signing, • pavement marking, • required, F Flare (Drop Curb) 10’ Min 10’ Min N/A R Radial Returns (Radius) N/A See Note 3 25’ Min 50’ Std, Roadways W Connection Width 12’ Min 24’ Max 24’ Min 36’ Max 24’ Min 36’ Max F Flare (Drop Curb) N, turning radius for the design vehicle • The radial return radius (curb radius) may be reduced, connections • Alternative intersections • Limited Access interchange ramps January 1, 2024 12

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm214drwys.pdf?sfvrsn=350e07ad_1

2025FDM214Drwys

flares, • drainage pipes and structures, • crossovers, • sidewalks, • curb cut ramps, 36’ Max 24’ Min 36’ Max F Flare (Drop Curb) 10’ Min 10’ Min N/A R Radial Returns (Radius) N, ’ Max F Flare (Drop Curb) N/A N/A N/A R Radial Returns (Radius) 15’ Min 25’ Std 50’ Max 25’ Min, the effective turning radius for the design vehicle • The radial return radius (curb radius) may, interchange ramps Requirements for driveway spacing and corner clearance are provided in FDM

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm214drwys.pdf?sfvrsn=7eb2644a_3

2025FDM214Drwys

and structures, • crossovers, • sidewalks, • curb cut ramps, • signing, • pavement markings, ’ Min 36’ Max 24’ Min 36’ Max F Flare (Drop Curb) 10’ Min 10’ Min N/A R Radial Returns (Radius) N, ’ Max F Flare (Drop Curb) N/A N/A N/A R Radial Returns (Radius) 15’ Min 25’ Std 50’ Max 25, radius (curb radius) may be reduced • The ability to use a larger design vehicle January 1, 2025 9, Access interchange ramps Requirements for driveway spacing and corner clearance are provided in FDM

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm214drwys.pdf?sfvrsn=d69b7eb7_1

2026FDM214Drwys

and structures, • crossovers, • sidewalks, • curb cut ramps, • signing, • pavement markings, Connection Width 12’ Min 24’ Max 24’ Min 36’ Max 24’ Min 36’ Max F Flare (Drop Curb) 10’ Min 10’ Min, ’ Max 24’ Min 36’ Max 24’ Min 36’ Max F Flare (Drop Curb) N/A N/A N/A R Radial Returns (Radius, : • Increase the effective turning radius for the design vehicle • The radial return radius (curb, -signalized connections • Alternative intersections • Limited Access interchange ramps Requirements

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm214drwys.pdf?sfvrsn=f3414723_4

FM 452567-1 Final RRR Scoping Report

assemblies and detector signs, replacing signal pull boxes impacted by curb ramp construction, . Lighting pull boxes shall be replaced as necessary within the limits of curb ramp reconstruction, .............................................................................. 17 2.6.15.2 Curb Ramps and Detectable Warnings, the project limits typically consist of a closed system with curb inlets as collection points for stormwater, , 11-foot inside travel lanes, 12-foot outside travel lane, 2-foot-curb and gutters, 6.5-foot

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd6/26619/fm-452567-1-final-rrr-scoping-report.pdf?sfvrsn=60eec5ec_1

Standard Plans - FY 2021-22 Errata

and 2 of 5 09/09/2021 Ramp Terminals Corrected the Flexible Pavement Thickness Transition dimension alignment. 000-525 2 of 5 05/09/2023 Ramp Terminals Corrected dimension in the THREE THRU LANES-APPROACH, . 425-022 2 of 2 12/22/2020 Curb Inlet Type 7 Corrected dimension in SECTION A-A and the MANHOLE MODIFICATION details. 425-023 2 of 2 12/22/2020 Curb Inlet Type 8 Corrected dimension in SECTION, - SECTION A-A details. 425-032 2 of 4 12/22/2020 Curb and Gutter Barrier Inlet Corrected dimensions

https://www.fdot.gov/design/standardplans/2022/Errata.shtm

Design Standards 2000

00304s1-5of5.pdf Public Sidewalk Curb Ramps 305 1-4 of 4 00305s1-4of4.pdf Concrete Pavement Joints, And Inlets 205 1-5 of 5 00205s1-5of5.pdf Cover Height 210 1 of 1 00210s01.pdf Curb Inlet Tops - Types 1, 2, 3 And 4 211 1-2 of 2 00211s1-2of2.pdf Curb Inlet Tops - Types 5 And 6 212 1 of 1 00212s01.pdf Curb Inlet - Type 7 213 1 of 1 00213s01.pdf Curb Inlet - Type 8 214 1 of 1 00214s01.pdf Curb Inlet Top - Type 9 215 1 of 1 00215s01.pdf Curb Inlet Top - Type 10 216 1-2 of 2 00216s1-2of2.pdf Closed Flume

https://www.fdot.gov/roadway/ds/00/stds.shtm

Design Standards 2002

Profiles 304 1-5 of 5 304.pdf Public Sidewalk Curb Ramps 305 1-4 of 4 305.pdf Concrete Pavement, 1 of 1 210.pdf Curb Inlet Tops - Types 1, 2, 3 And 4 211 1-2 of 2 211.pdf Curb Inlet Tops - Types 5 And 6 212 1 of 1 212.pdf Curb Inlet - Type 7 213 1 of 1 213.pdf Curb Inlet - Type 8 214 1 of 1 214.pdf Curb Inlet Top - Type 9 215 1 of 1 215.pdf Curb Inlet Top - Type 10 216 1-3 of 3 216.pdf Closed, Modifications For Endwalls * CURBS, CONCRETE PAVEMENT AND SIDEWALKS * 300 1 of 1 300.pdf Curb & Curb

https://www.fdot.gov/roadway/ds/02/stds.shtm
20 of 981 results