4266 search results for REPORT NUMBER

9160000SS

Specification Minimum/Maximum Value Original Binder Superpave PG Asphalt Binder Grade Report Qualified Products List Number Report Polymer Modifier Type As Required Report Spot Test, AASHTO, in the QC Plan. 916-1.3.4 Reporting: A monthly report by the supplier containing Specification Compliance, terminal, the asphalt supplier shall submit a test report to the State Materials Office to include all, shall submit a sample to the State Materials Office for testing before use. A pretest number

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2005/january-2005/workbook/9160000ss.pdf?sfvrsn=148560f_0

9160000SS

Specification Minimum/Maximum Value Original Binder Superpave PG Asphalt Binder Grade Report Qualified Products List Number Report Polymer Modifier Type As Required Report Spot Test, AASHTO, in the QC Plan. 916-1.3.4 Reporting: A monthly report by the supplier containing Specification Compliance, terminal, the asphalt supplier shall submit a test report to the State Materials Office to include all, shall submit a sample to the State Materials Office for testing before use. A pretest number

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2006/january-2006/workbook/9160000ss.pdf?sfvrsn=d70e347c_0

FMPP Meeting Summary_07262023 (FINAL)

Planning Findings Recommendation report that suggested FDOT work with MPOs and Federal Partners, will allow for universal advertisement numbers, which will be set up in the Equal Opportunity, ) with one Financial Management (FM) number. • FDOT can look into allowing MPOs to modify contract end dates, . The assessment will result in a final report. • Becky Marsey noted that a breakout activity has been designed

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/policy/metrosupport/meetings-and-webinars/fmpp-meeting-summary_07262023-(final).pdf?sfvrsn=3ba280e8_1

D3-04-10-25BSN

of 1990 should send an e-mail to: contracts.admin@dot.state.fl.us or call telephone number (850)638,  A current State of Florida Vendor Number is required prior to first-time registration; please, allow 24 to 48 hours for receipt of a new vendor number. Prior to placing orders, an individual, the contract can be executed. BE SURE THAT THE CONTRACT NUMBER IS ON EACH INSURANCE CERTIFICATE, application for P rime Contractors, statewide, to report their Bidder Opportunity List, DBE Commitments

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2025/apr10/d3-04-10-25bsn.pdf?sfvrsn=b5091733_1

CTD_Business_Meeting_Packet-20250925

) Conference Call-In Number: (850) 739-5589 Conference Code: 734 367 274 # AGENDA 1. Call to Order Monica, Incidents Report Karen Somerset, Director 8. Executive Director Update Karen Somerset, Director 9, required to report: 47  Reports received: 39 Key Findings  Agencies reporting no incidents: 23, % of the planning allocation shall be divided into shares equal to the number of counties throughout the state, of the prior 1322 fiscal year, categorized by type of license: 1323 a. The number of license applications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/meetingpackages/2025/ctd_business_meeting_packet-20250925.pdf?sfvrsn=ac9a7c2b_1

CTD_Business_Meeting_Packet-20250925

) Conference Call-In Number: (850) 739-5589 Conference Code: 734 367 274 # AGENDA 1. Call to Order Monica, Incidents Report Karen Somerset, Director 8. Executive Director Update Karen Somerset, Director 9, required to report: 47  Reports received: 39 Key Findings  Agencies reporting no incidents: 23, % of the planning allocation shall be divided into shares equal to the number of counties throughout the state, of the prior 1322 fiscal year, categorized by type of license: 1323 a. The number of license applications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/meetingpackages/2025/ctd_business_meeting_packet-20250925.pdf?sfvrsn=e9e1734f_1

D5-12-02-25BSN

Statute. Page Number Proposal Id Proposal Notes Fin Proj Numbers County 7 E54D0-R0 42914217222, telephone number (386) 943-5514. Special accommodation requests under the Americans with Disabilities Act, of Florida Vendor Number is required prior to first-time registration; please visit https, vendor number. Prior to placing orders, an individual shall register and establish an Internet, THAT THE CONTRACT NUMBER IS ON EACH INSURANCE CERTIFICATE. ADDENDA No negotiations, decisions, or actions

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2025/dec02/d5-12-02-25bsn.pdf?sfvrsn=8ff808d1_1

FDOT_QLOS_Handbook_V6.0_Clean_Aug 2025_Complete streets replaced with Context Based Solutions

.............................................................................................. 35 5.1 Number of Through Lanes ......................................................................................................... 35 5.1.1 Number of Through Lanes for Freeways ............................................................................... 35 5.1.2 Number, ............................................................................... 35 5.1.3 Number of Through Lanes for Arterials, and bicyclists, this includes facility type and width, number of travel lanes, posted speed, separation from

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/systems/systems-management/document-repository/qlos/fdot_qlos_handbook_v6-0_clean_aug-2025_complete-streets-replaced-with-context-based-solutions.pdf?sfvrsn=8c661dac_1

4550501-122FHWA

for as test piling. 455-11.5 Dynamic Load Tests: Payment will be based on the number of dynamic load, for will be the product of the number of such piles satisfactorily completed, in place, times their lengths in feet, wider than shown in the Plans; then the number of piles shall be the actual number of units, : The quantity to be paid for will be the number of redrives, each, authorized by the Engineer, Static Load Tests: The quantity to be paid for will be the number of static load tests

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/fhwa/4550501-122fhwa.pdf?sfvrsn=cc5624c5_2

fdot-bed31-977-08-rpt

Report for FDOT Project BED31-977-08 FDOT Project BED31-977-08 Task 6 Final Report Submitted, The opinions, findings, and conclusions expressed in this report are those of the authors and not necessarily those of the State of Florida Department of Transportation. iii Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. 4. Title and Subtitle Research on Artificial Intelligence for Data Integration with State Highways 5. Report Date

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bed31-977-08-rpt.pdf?sfvrsn=8b34b0f6_1

Staff-Directors-Final-Packet-01-27-22-final

Director’s Report A. The First 47 Days B. OIG Investigation Report/Budget Report C. Legislative Update, to mark.reichert@dot.state.fl.us. Item Number 1 Call to Order & Pledge of Allegiance DISCUSSION: The Chair, of Allegiance. REQUESTED ACTION: None requested. ATTACHMENT: None. Item Number 2 Approval of Minutes, REPORT • UPWP REPORT Item 4A, UPWP Report, was deferred to the MPOAC budget discussion under item, that this number is changing quickly. Previously, the number of bills typically exceeds 1000. The bills

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2022/staff-directors-final-packet-01-27-22-final.pdf?sfvrsn=5a393a38_1

452784_Final_Technical_Scope

. of SR 683 (US 301) TECHNICAL SCOPE State Road Number: SR 45 Section Number: 17020000 County, FPID No.: 452784-1 Work Mix: 0012 (Resurfacing) 1. Existing R/W Map Project Numbers: 1702-202 (1949); 100 feet minimum 2. Old Construction Project Numbers: 421830-1_RRR_MP15.248_MP17.206_FY08, % = 3.4 12. Are there any old houses or buildings adjacent to the project? No 13. Number, this scope report.  The existing roadway components include vehicular, and pedestrian elements

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26105/452784_final_technical_scope.pdf?sfvrsn=656d1564_1

Chapter_11

(A) In areas where 911 is not available, the telephone numbers of the physicians, hospitals, or ambulances, or fabricator name and address; (B) ROPS model number, if any; (C) Tractor make, model, or serial number, . No Smoking - Stop Motor." (2) IN CASE OF FIRE OR SPILL: (a) Use emergency stop button. (b) Report accident by calling [include local fire department number and phone location] (B) Operating instructions

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/safety/industrialsafety/chapter_11.pdf?sfvrsn=49b454eb_1

F4003 Non Techical Specification

8-31-2016) Page 2 of 29 State of Florida DEPARTMENT OF TRANSPORTATION Financial Project Number: TBD, number, calendar days, contract number, total contract sum, date of execution, etc. BIDDER, LETTING: The date the Owner opens the bid proposals. CONTRACT TIME: The number of calendar days, date of completion is stipulated in lieu of a number calendar days, the contract shall be completed

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/fcp/f4003/f4003-non-techical-specification.pdf?sfvrsn=69a7f897_2

F4006NonTechSpecs

DEPARTMENT OF TRANSPORTATION Financial Project Number: 444761-5-52-01 Project Name: FDOT DISTRICT IV MAIN, attached to the front of an awarded contract which identifies the bidder, financial project number, calendar days, contract number, total contract sum, date of execution, etc. BIDDER: An individual, : The date the Owner opens the bid proposals. CONTRACT TIME: The number of calendar days allowed, of completion is stipulated in lieu of a number calendar days, the contract shall be completed

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/fcp/f4006/f4006nontechspecs.pdf?sfvrsn=976126b0_2

43359245801-PLANS-05-LIGHTING

LICENSE NUMBER 61661 SCALAR CONSULTING GROUP INC. PLANTATION, FLORIDA 33324 LIGHTING PLANS SHEETS, JULIO C. DELGADO, P.E. 8751 W. BROWARD BOULEVARD, SUITE 307 P.E. LICENSE NUMBER 61661 SCALAR, OF QUANTITIES NO. ITEM PAY DESCRIPTION UNIT SHEET NUMBERS SHEET THIS TOTAL L-10 L-11 L-12 L-13 L-14, LICENSE NUMBER 61661 SCALAR CONSULTING GROUP INC. PLANTATION, FLORIDA 33324 L-4 TABULATION OF QUANTITIES TABULATION OF QUANTITIES NO. ITEM PAY DESCRIPTION UNIT SHEET NUMBERS SHEET

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25111/43359245801-plans-05-lighting.pdf?sfvrsn=6bd67836_1

Florida TIM Responder - June 2022

Road Ranger operators killed in struck by vehicle incidents. Examining crash report statistics from, RESPONDER V3 / ISSUE 2 • 2022 TIM RESPONDER V3 / ISSUE 2 • 2022 Incidents by the Numbers Road, incident responders have received training in the state of Florida (as of April 11, 2022). That number, in EV implementation, first responders are also handling the challenges of the increased number of EV, characteristics such as the number of lanes and sightline issues » Improved interoperability

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/cvotim/tim/newletters/florida-tim-responder---june-2022.pdf?sfvrsn=9e2ec795_1

E4X61Appendix001

(TSM&O) Device Maintenance Contract, District Four Financial Project Number(s): 406795-7-72-01 and various Proposal/Contract Number: E4X61 Intelligent Transportation Systems (ITS) Maintenance, it is an Emergency repair. The Contractor shall prepare and submit a diagnostic report to the Department’s Project Manager. The report shall include a damage assessment, cost estimates, details about the incident (date, time, cause of damage).  Obtain the police report if applicable

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/rfp/e4x61/e4x61appendix001.pdf?sfvrsn=b2e9e9f6_1

SP4550000DB-122

the Contractor to proceed with subsequent construction operations. Submit a written report, the distribution of the load. Ensure that the type, number, and location of the strain gauges are as shown, report signed and sealed by the Specialty Engineer to the Engineer for review and acceptance, production pile/shaft construction. Include in the report of the load test the following information, . In addition, submit a report showing an analysis of the results of axial load and lateral load

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/design-build/sp4550000db-122.pdf?sfvrsn=951c94e4_2

SP4550000DB-721

the Contractor to proceed with subsequent construction operations. Submit a written report, the distribution of the load. Ensure that the type, number, and location of the strain gauges are as shown, report signed and sealed by the Specialty Engineer to the Engineer for review and acceptance, production pile/shaft construction. Include in the report of the load test the following information, . In addition, submit a report showing an analysis of the results of axial load and lateral load

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/design-build/sp4550000db-721.pdf?sfvrsn=cb06bab9_2
20 of 4266 results