13553 search results for DESIGN

2340100-122impl

 234 SUPERPAVE ASPHALT BASE (REV 7-8-21) (FA 7-14-21) (1-22) ARTICLE 234-1 is deleted and the following substituted: 234-1 Description. Construct a Superpave asphalt concrete base course as defined in these Specifications. Base course mixes are designated as Type B-12.5. The Contractor may use a Type SP-12.5 mixture (Traffic Level B, C, or E) or a Type SP-19.0 mixture (Traffic Level B, C, or E), in lieu of a Type B-12.5 at no additional cost to the Department. Obtain Superpave asphalt

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/implemented/2340100-122impl.pdf?sfvrsn=84d7767f_2

SP1010204-i16403

 MOBILIZATION – EMERGENCY MOBILIZATION. (REV 12-2-14) (1-21) ARTICLE 101-2 is expanded by the following: 101-2.4 Emergency Mobilization: Provide a contact 24-hours-per-day and 7- days-per-week (including all holidays) to receive and respond in person to verbal and/or written work directions for the duration of this Contract. This contact must be available to meet with the Engineer or designated representatives as needed or will be required to respond by telephone within _____ minutes

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/maintenance/finalized/sp1010204-i16403.pdf?sfvrsn=5c21b197_3

SP1010204

 MOBILIZATION – EMERGENCY MOBILIZATION. (REV 12-2-14) (7-19) ARTICLE 101-2 is expanded by the following: 101-2.4 Emergency Mobilization: Provide a contact 24-hours-per-day and 7- days-per-week (including all holidays) to receive and respond in person to verbal and/or written work directions for the duration of this Contract. This contact must be available to meet with the Engineer or designated representatives as needed or will be required to respond by telephone within _____ minutes

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/maintenance/finalized/sp1010204c6716fd595cc43bfbf28c1ced0c8564f.pdf?sfvrsn=73dc777e_3

SP1010204

 MOBILIZATION – EMERGENCY MOBILIZATION. (REV 12-2-14) (1-19) ARTICLE 101-2 is expanded by the following: 101-2.4 Emergency Mobilization: Provide a contact 24-hours-per-day and 7- days-per-week (including all holidays) to receive and respond in person to verbal and/or written work directions for the duration of this Contract. This contact must be available to meet with the Engineer or designated representatives as needed or will be required to respond by telephone within _____ minutes

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/maintenance/finalized/sp1010204a3fd314d-b78e-4936-8ce8-da21dd6307d1.pdf?sfvrsn=1f2873f1_2

SP1010204

 MOBILIZATION – EMERGENCY MOBILIZATION. (REV 12-2-14) (7-18) ARTICLE 101-2 is expanded by the following: 101-2.4 Emergency Mobilization: Provide a contact 24-hours-per-day and 7- days-per-week (including all holidays) to receive and respond in person to verbal and/or written work directions for the duration of this Contract. This contact must be available to meet with the Engineer or designated representatives as needed or will be required to respond by telephone within _____ minutes

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/maintenance/finalized/sp1010204.pdf?sfvrsn=44ec3148_1

SP1010204

 MOBILIZATION – EMERGENCY MOBILIZATION. (REV 12-2-14) (1-18) ARTICLE 101-2 is expanded by the following: 101-2.4 Emergency Mobilization: Provide a contact 24-hours-per-day and 7- days-per-week (including all holidays) to receive and respond in person to verbal and/or written work directions for the duration of this Contract. This contact must be available to meet with the Engineer or designated representatives as needed or will be required to respond by telephone within _____ minutes

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/maintenance/finalized/sp1010204.pdf?sfvrsn=64d2baee_3

SP1010204

 MOBILIZATION – EMERGENCY MOBILIZATION. (REV 12-2-14) (7-17) ARTICLE 101-2 is expanded by the following: 101-2.4 Emergency Mobilization: Provide a contact 24-hours-per-day and 7- days-per-week (including all holidays) to receive and respond in person to verbal and/or written work directions for the duration of this Contract. This contact must be available to meet with the Engineer or designated representatives as needed or will be required to respond by telephone within _____ minutes

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/maintenance/finalized/sp1010204.pdf?sfvrsn=e83640d7_1

SP1010204

 MOBILIZATION – EMERGENCY MOBILIZATION. (REV 12-2-14) (7-16) ARTICLE 101-2 is expanded by the following: 101-2.4 Emergency Mobilization: Provide a contact 24-hours-per-day and 7- days-per-week (including all holidays) to receive and respond in person to verbal and/or written work directions for the duration of this Contract. This contact must be available to meet with the Engineer or designated representatives as needed or will be required to respond by telephone within _____ minutes

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/january-2017/maintenance/finalized/sp1010204.pdf?sfvrsn=61878a93_2

2880302.origind

o posed revision involve Design Standard Index changes? Yes No Roadway Design staff contacted (name): S tructures Design staff contacted (name): W i l l t h e p r o posed revision involve PPM changes? Yes No Roadway Design staff contacted (name): W i l l t h e p r o posed revision involve CPAM, h i s r evision necessitate any of the following: Design Bulletin Construction Bulletin Estimates, the proposed design mix prior to production, on the “Concrete Mix Design” form, for the Engineer’s

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/internal/2880302.origind.pdf?sfvrsn=6bb8b351_0

FDOT-D4_SW10th_IndustryForum_Presentation_20230817

Project Summary • Scope of Planned Improvements • Phased Design-Build Delivery • Procurement Process, Current Situation • Why SW 10 th St reet Connector? o Original design vs. today’s u s e o Safety, , 2023 August 1, 2023 SW 10TH STREET CONNECTOR 6 Project Goals The Design-Build Firm shall progress, Structures Aesthetics SW 10TH STREET CONNECTOR 15 Prescriptive Design Elements • Ground Mounted Noise, – Approximately 75 • Onboard Units Deployment on Designated Ve h i cles – Approximately 100 • Smartphone

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/sw-10th-street---2021/fdot-d4_sw10th_industryforum_presentation_20230817.pdf?sfvrsn=88a01fee_1
20 of 13553 results
Top