3443 search results for REPORT NUMBER

News Release Archive

Extended February 11, 2021  ICYMI: Tampa Named Number One in Nation for Bicycle Friendly, to Review and Refine Draft Report September 17, 2020 FDOT’s September 17 Update on Garcon Point, . Bridge Inspection Report - Southbound Bridge Inspection Report - Northbound FDOT’s June 26 Updates, - Final Report November 24, 2019 Innovative SunTrax To Undergo Next Phase of Construction

https://www.fdot.gov/info/co/news/newsreleases/default.shtm

13-CPPR_Construction Academy 2025

➢ Documentation = Daily Report of C o n s t r u c t i o n , Stop Wo r k O r d e r s , email, progress, Report of C o n s t r u c t i o n tracks this. 10 ➢ Pursuit of Wo r k cannot be greater than 100, on the five-day workweek and whether Contractor pursued work on that many number or days. Make a notation, Past Pe r f ormance Report. 3. The pursuit of work be greater than 100%. 4. Are DLs used, CPPR overdue lists. Entry Into C I M ➢ CPA M 13 .1.9 Preparing the Report (A)(1) (B) provides link

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2025-spring-construction-academy/13-cppr_construction-academy-2025.pdf?sfvrsn=ccf3f97d_1

MPOAC-Executive-Committee-Meeting-Packet

Funds to MPOs. 3 Alison Stettner noted that the MPOAC Specific Conditions Report was due to FDOT, on it and expect to have the report completed by the end of October. In discussion between Mark, the information provided. The most accurate capture of the budget is the FLAIR report with shows all of the MPOAC funding (other than FTA funds). As shown on the FLAIR report, the MPOAC budget is solid, is created, the number of Governing Board members will increase. As of January 2022, the MPOs are: (1

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2022/mpoac-executive-committee-meeting-packet.pdf?sfvrsn=73be915d_1

2020-08-27_FLPorts_Ports_SMP_spreads-v6

this report annually by law. The record it demonstrates serves the people and businesses of Florida through, — the year in which this 2019 report is being produced — make clear that precedent-based, 2018/2019, surpassing the previous year’s record of 16.8 million passengers. In 2019, the number, industry. G rowing vessel size, for example, introduces a number of infrastructure stressors, of 2020, the Congressional Research Service delivered a report to the U.S. Congress that stated global

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/seaport/pdfs/2020-08-27_flports_ports_smp_spreads-v6.pdf?sfvrsn=b6cba0c8_1

4550000.FHWA

. 4550000.D02 All Jobs Obtain the Engineer’s approval of the number and location of monitoring, report before beginning foundation construction operations and a second report after completing, . Furnish the Engineer a written report by the divers indicating the results of their underwater, of the load. Ensure that the type, number, and location of the strain gauges are as shown, . 455-2.8 Required Reports: Submit a preliminary static load test report to the Engineer within five days

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/fhwa/4550000.fhwa.pdf?sfvrsn=c2345537_0

D4500000.do

property test report and the manufacturer’s assigned LOT number(s) with the heat of the material represented. Verify that the report represents the steel received and that the steel meets, . Ensure that the calibration report includes, the serial number of the equipment that is calibrated, report detailing the results of the daily QCP activities. Ensure these daily reports and minutes, the identification of the bed, type of fabricated products, jack identification number, date prestressing strands

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2003/january-2003/workbook/d4500000.dob820a9b4cc18416a803f4c7d9d43bfbb.pdf?sfvrsn=6004755e_0

D4500000.do

property test report and the manufacturer’s assigned LOT number(s) with the heat of the material represented. Verify that the report represents the steel received and that the steel meets, . Ensure that the calibration report includes, the serial number of the equipment that is calibrated, report detailing the results of the daily QCP activities. Ensure these daily reports and minutes, the identification of the bed, type of fabricated products, jack identification number, date prestressing strands

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2003/january-2003/workbook/d4500000.do.pdf?sfvrsn=c9a6feab_0

Disposal of Surplus Property_10.5

requires a separate agent to perform negotiations and estimates of value. Appraisal: The report, (USPAP) and found to be a report that can be used to make a prudent business decision. This can, in the county of record, and provide a copy of the recorded deed, showing the book and page number and date, prepare all necessary closing documents. 10.5.5.9 Public Purpose Conveyance Report: Each district shall compile and submit to the State Property Management Administrator an annual report of property

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/rightofway/documents/rowmanual/disposal-of-surplus-property_10-5.pdf?sfvrsn=df71e914_1

7000000.impl

of the manufacturer, the part number, and the date of manufacturer. Marking must be accomplished by permanently, pieces, are continuously welded using an inert gas welding method. Limit the number of seams, that the sign blanks when a critical temperature is exceeded and that the sign will report, Bits 7or8bits Parity Even,Odd,orNone Number Stop Bits 1or2bit

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/implemented/7000000.impl.pdf?sfvrsn=721124fb_0

drainagemanual2024withRevisions

for temporary drainage. Section 3.13.2 – Moved pipe inspection and siltation report to top of the list, will provide a Drainage Design Report to accompany all phase submittals (signed and sealed for the Final, submittals must include hydrologic and hydraulic models. The Drainage Design Report must include, to the Drainage Design Report. Topic No. 625-040-002 Effective: January 2024 Drainage Manual 1-4 1.7, : _________________________________ Prepared by: ____________ Date: ____________ Project Number

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/drainage/files/drainagemanual2024withrevisions.pdf?sfvrsn=90938a97_1

4550000DB.origind

a written report by the divers to the Engineer indicating the results of their underwater inspection, that the type, number, and location of the strain gauges are as shown in the Plans or as directed, of the test. 455-2.8 Required Reports: Submit a static load test report signed and sealed, . Include in the report of the load test the following information: 1. A tabulation of the time, . In addition, submit a report showing an analysis of the results of axial load and lateral load tests

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/internal/4550000db.origind.pdf?sfvrsn=38c24abf_0

SS4550000

. ObtaintheEngineer’s approval of the number and location of monitoring points. Take elevation; (1) b e f o r e b e, report before beginning foundation construction operations and a second report after completing, construction operations. Furnish the Engineer a written report by the divers indicating the results, that the type, number, and location of the strain gauges are as shown in the plans or as directed, a preliminary static load test report to the Engineer within five days after completing the load test

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2009/january-2009/workbook/ss4550000.pdf?sfvrsn=10d6d9d5_0

SS4550000

. ObtaintheEngineer’s approval of the number and location of monitoring points. Take elevation; (1) b e f o r e b e, report before beginning foundation construction operations and a second report after completing, construction operations. Furnish the Engineer a written report by the divers indicating the results, that the type, number, and location of the strain gauges are as shown in the plans or as directed, a preliminary static load test report to the Engineer within five days after completing the load test

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2009/january-2009/workbook/ss4550000bf728f67f4b445b39276cfff3b24b226.pdf?sfvrsn=e8da5d9c_0

Public Kickoff Mtg_10_12_2023

Attendees Dial-in attendees are ‘listen only’ Presenter will say slide number being shown 9 Meeting, / Public Outreach 6 Comments 7 To Report a Technical Issue 11 Meeting Logistics – Virtual or Te, : To Report a Technical Issue 27 In-Person Public Kick-Off Meeting: Oct. 17, 2023, from 5:30 p.m. to 7

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/i95broward/public-kickoff-mtg_10_12_2023.pdf?sfvrsn=84280be_1

1200100-722FHWA

Identification Number, the County, a description of the property with Township, Range, Section, etc, services to complete an historical and archaeological survey report. Submit the report to the DHR

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/fhwa/1200100-722fhwa.pdf?sfvrsn=c1cced8c_2

1200100-722origind

Officer, Tallahassee, FL. As a minimum, include in the request the Project Identification Number, an historical and archaeological survey report. Submit the report to the DHR and to the Department

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/1200100-722origind.pdf?sfvrsn=835066c6_2

1200000.origind

Identification Number, the County, a description of the property with Township, Range, Section, etc, services to complete an historical and archaeological survey report. Submit the report to the DHR

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/internal/1200000.origind.pdf?sfvrsn=565570b6_0

1200000.FHWA

Identification Number, the County, a description of the property with Township, Range, Section, etc, to complete an historical and archaeological survey report. Submit the report to the DHR

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/fhwa/1200000.fhwa.pdf?sfvrsn=72f9686c_0

1200000.impl

in the request the Project Identification Number, the County, a description of the property, professional archaeological services to complete an historical and archaeological survey report. Submit the report to the DHR and to the Department. The Engineer will determine final approval or rejection

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/implemented/1200000.impl.pdf?sfvrsn=4bd4f217_0

Section84V2-723cln

. 8.4.7.1 NUMBER AND QUANTITY OF BATCH SIZES Place a total volume of 9 cubic yards in a minimum, of the saw-cut cylinders and provide to DMRO along with the report. If the Plant and the DMRO disagree over the HVSI value, the report and corresponding photos shall be forwarded to the SMO for final

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/materials-manual/section84v2-723cln.pdf?sfvrsn=d403c97f_4
20 of 3443 results