9191 search results for test

SS9620000

- carrying members or components (as defined in Section 460), meet the ASTM A 709 impact test, to the specified test coupons, test specimens from parts integral with the castings, such as risers, are to be tested for castings with a mass more than 1,000 pounds to determine that the required, with plain bolts if the finish coat of paint is applied after installation and testing of the DTI device, a test report on the zinc coating thickness. 4.Foranchorrodsfabricatedfrom material having a yield

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2008/files/ss962000033bfebfd97ca4221a6622a5039a57f2a.pdf?sfvrsn=d8eae60_0

SS9620000

- carrying members or components (as defined in Section 460), meet the ASTM A 709 impact test, to the specified test coupons, test specimens from parts integral with the castings, such as risers, are to be tested for castings with a mass more than 1,000 pounds to determine that the required, with plain bolts if the finish coat of paint is applied after installation and testing of the DTI device, a test report on the zinc coating thickness. 4.Foranchorrodsfabricatedfrom material having a yield

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/julworkbook2008/files/ss9620000.pdf?sfvrsn=7f37f4f_0

SS9620000

- carrying members or components (as defined in Section 460), meet the ASTM A 709 impact test, to the specified test coupons, test specimens from parts integral with the castings, such as risers, are to be tested for castings with a mass more than 1,000 pounds to determine that the required, with plain bolts if the finish coat of paint is applied after installation and testing of the DTI device, a test report on the zinc coating thickness. 4.Foranchorrodsfabricatedfrom material having a yield

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/programmanagement/implemented/workbooks/revisions/july08/ss9620000.pdf?sfvrsn=1e50053d_0

SPM5705000-724-i19422

on soil test reports. Soil testing shall be performed by the ___________________________________. Apply fertilizer at the rate shown in the soil test reports and in compliance, or testing. 570-50.5 Basis of Payment. Price and payment will be full compensation for all work

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/maintenance/finalized/spm5705000-724-i19422.pdf?sfvrsn=9c32dc92_1

SPM5705000-725-i19903

on soil test reports. Soil testing shall be performed by the ___________________________________. Apply fertilizer at the rate shown in the soil test reports and in compliance, or testing. 570-50.5 Basis of Payment. Price and payment will be full compensation for all work

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/maintenance/finalized/spm5705000-725-i19903.pdf?sfvrsn=41cac5c2_1

SSM5705000-723-i18619

to apply based on soil test reports. Soil testing shall be performed by the ___________________________________. Apply fertilizer at the rate shown in the soil test reports and in compliance, or testing. 570-50.5 Basis of Payment. Price and payment will be full compensation for all work

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/maintenance/finalized/ssm5705000-723-i18619.pdf?sfvrsn=283c0dea_2

SSM5705000-122

based on soil test reports. Soil testing shall be performed by the ___________________________________. Apply fertilizer at the rate shown in the soil test reports and in compliance, or testing. 570-50.5 Basis of Payment. Price and payment will be full compensation for all work

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/maintenance/finalized/ssm5705000-122.pdf?sfvrsn=99b9b1b0_2

SSM5705000-722-i17988

based on soil test reports. Soil testing shall be performed by the ___________________________________. Apply fertilizer at the rate shown in the soil test reports and in compliance, or testing. 570-50.5 Basis of Payment. Price and payment will be full compensation for all work

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/maintenance/finalized/ssm5705000-722-i17988.pdf?sfvrsn=ca91d497_2

SSM5705000-721

on soil test reports. Soil testing shall be performed by the ___________________________________. Apply fertilizer at the rate shown in the soil test reports and in compliance, or testing. 570-50.5 Basis of Payment. Price and payment will be full compensation for all work

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/maintenance/finalized/ssm5705000-721.pdf?sfvrsn=23c4e35d_4

SSM5705000impl

on soil test reports. Soil testing shall be performed by the ___________________________________. Apply fertilizer at the rate shown in the soil test reports and in compliance, or testing. 570-50.5 Basis of Payment. Price and payment will be full compensation for all work

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/maintenance/implemented/ssm5705000impl.pdf?sfvrsn=49f61165_2

6200401.resp

 6200401 GROUNDING AND LIGHTING PROTECTION COMMENTS FROM INTERNAL/INDUSTRY REVIEW No Name Comments: (Industry,5-25-18) "Ground resistance testing is not required for roadway lighting installations." Is the intent to not test and assume the contractor constructed the lighting correctly, to the lighting to exclude this Fall Potential Test for lighting and signalization. Response: (7-5-18) Testing for traffic signal installations may be addressed at a future date. No change made. ******************************************************************************

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/comments-responses/6200401.resp.pdf?sfvrsn=86cfe36f_0

9620000-723comm

testing data can be collected during construction. This requirement was put in place to eliminate, the UT testing criteria for the upright material used in Sign Structures (Several Industry standards, , X52N, X52M, X56N, X56M, X60N, X60M, X65M, X70M PSL2 Killed, Fine Grain, Tensile, CVN Test, 5L), CVN Test per 962-2 Response:

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/comments-responses/9620000-723comm.pdf?sfvrsn=2e6cf541_1

9750201ind

testing, use flat test panels prepared in accordance with AASHTO R 31. Outdoor exposure testing, -Graffiti Coatings Performance Requirements Outdoor Exposure Testing – Non-Sacrificial Property Test, Test Method Acceptance Criteria Cyclic Weather Testing AASHTO R 31: no salt fog, 95 ° F, 0, Outdoor Exposure Testing - Sacrificial Property Test Method Acceptance Criteria Sacrificial Coating, is fixing the warranty testing specification, ensuring quality. What financial impact does

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/9750201ind.pdf?sfvrsn=c88a802a_1

5600000FHWA

. Conduct the non-abrasive residue and lead content tests as directed by the Engineer. If test, allow testing frequency may to be reduced to one chloride contamination test per day. When any, Between Coats 3 tests (first 1,000 ft 2 ) 1 test (ea. Additional 1,000 ft 2 ) ≤ 7 µg/cm 2, allow testing frequency to be reduced to one chloride contamination test per day. When any, 2 Chlorides Between Coats 3 tests (first 1,000 ft 2 ) 1 test (ea. Additional 1,000 ft 2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul19/files/5600000fhwa.pdf?sfvrsn=f95810b3_2

3340302.comm

we waive the requirement for Density Testing for Acceptance? Many of our more frequent pavement, richard.hewitt@dot.state.fl.us Comments: (11-30-10) I recommend adding language to require density testing in bike lanes. (ex. “Bike lanes are subject to density testing for acceptance.”) Bike lanes are part, between a Bike LANE (part of the roadway where I propose we require density testing) and a Bike, not require density testing). (From Rich (12-1-10) Just to let you know where I am coming from

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul11/files/3340302.comm.pdf?sfvrsn=1dfbe4fa_0

4550510DB.comm

, Internal Review) The added column for 100% Dynamic Testing is needed but the resistance factors should, be within reasonable ranges. There is still confusion regarding the 100% dynamic testing. First, it should not be dictated for the initial drive and testing of all blows. This is not needed for steel piles, for example. Testing the entire drive of a steel pile does not provide useful data, there is no critical information that can be gained by it. Even for concrete piles, no need to test each

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/comments-responses/4550510db.comm.pdf?sfvrsn=63b8385c_0

Section113V2-726

, 2025 Volume II: Phased Array Ultrasonic Testing 11.3.1 SECTION 11.3 Volume II PHASED ARRAY ULTRASONIC TESTING 11.3.1 PURPOSE This procedure provides guidance for the development and implementation of procedures for the use of Phased Array Ultrasonic Testing on Florida Department, for Agencies Performing Nondestructive Testing ASTM E2700 Standard Practice for Contact Ultrasonic Testing of Welds Using Phased Arrays ASTM E2491 Guide for Evaluating Performance Characteristics

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/materials-manual/section113v2-726.pdf?sfvrsn=418b472a_1

fdot-bed25-977-14-rpt

was built upon previous research that identified and tested several products, expanding the analysis, . Vendors collaborated with the research team to conduct feasibility tests and validate system, 4.3 Test Site Selection, comprehensive testing, analysis, and the development of implementation guidelines, this project sought, project, which identified and tested several products. • Develop evaluation, implementation

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bed25-977-14-rpt.pdf?sfvrsn=ccc8707f_3

4620000-723FHWA

on the project. 5.Provide a mockup test in accordance with this Section. PT system acceptance testing may, operations until grout test results are available and approved by the Engineer. Mock-up testing per section, 10% of test device volume for the 0.5 gallon test device. When testing the 6.5 gallon device, ensure an accuracy of 3% (test device volume) and 6% (grout volume). 3. Do not use grout that tests, 4620000D01 All Jobs POST-TENSIONING (REV 97-2011-22) 462-1 Description. 1.Furnish, test, transport

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/fhwa/4620000-723fhwa.pdf?sfvrsn=f57ce7dc_1

SP3300802-i18516

the requirements of this Specification. 330-9.4.1 Process Control Testing: Assume full responsibility, at all times. 330-9.4.2 Laser Acceptance: Acceptance testing for pavement smoothness, Roughness Index (IRI) as defined in ASTM E1926. Areas not suitable for testing with the laser profiler will be QC tested and accepted with the straight edge in accordance with 330-9.4.3, . For acceptance testing purposes, the pavement will be divided into LOTs. A LOT is defined as anything

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/workbook/sp3300802-i18516.pdf?sfvrsn=6c71fb86_2
20 of 9191 results